Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Florida was posted on October 20, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Southwest WWTP Sodium Hypochlorite System Improvements

Closed
BID-BID 26-05-10-CM-0-2025/cmState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 332420
New
SLED
Aluminum Fish distribution tank
Solicitation # SRC0000042181
The Ohio Department of Natural Resources, through the Division of Wildlife at the Castalia State Fish Hatchery, is soliciting quotes for the procurement of one new custom aluminum fish distribution tank. The required hardware consists of a 96-inch long, 66-inch wide, and 40-inch tall tank featuring two equal compartments of approximately 385 gallons each. Technical specifications include 2-inch insulated closed-cell walls, floor, and ceiling, constructed with 3003-H14 smooth aluminum sheets and 6061-T6 aluminum extrusions. The tank must be equipped with four 12-volt Fresh-Flo TT aerators, an electrical switch box, an oxygen system with flowmeters and ceramic diffusers, and two 6-inch camlock discharges. A rough design mockup must be submitted to the ODNR for verification prior to the commencement of construction, and the final product must include a 5-year workmanship warranty. The contract will be awarded to the lowest responsive and responsible bidder based on the low lot total. The State will apply specific preferences for Buy American, Buy Ohio, and Veteran-Friendly Businesses in accordance with Ohio Administrative Code. Delivery is required no later than January 15, 2027, under FOB Destination terms. For contractors located within 100 driving miles of the Castalia facility, the ODNR will handle pickup; otherwise, the contractor is responsible for delivery. All submissions must be made electronically through the Ohio Buys portal. Standard state terms apply, including requirements for independent contractor status, compliance with equal employment opportunity laws, and adherence to offshore service restrictions. Payment is due within 30 calendar days of the receipt of a proper invoice, with electronic funds transfer being the preferred method.
Dnr750784 Castalia State Fish Hatchery Dnreri

POSTED

3 days ago

DEADLINE

in 18 days
NAICS: 332420
New
DIBBS
TANK, EXPANSION, CHILLED
Solicitation # SPE8E9-26-Q-0795
Solicitation SPE8E9-26-Q-0795 is a fixed-price request for quotation issued by the DLA Troop Support Construction and Equipment MRO SVC for the procurement of one chilled water expansion tank, NSN 5430-01-096-9196. The solicitation was posted on September 28, 2026, with a response deadline of October 5, 2026. Delivery is required within 60 days after receipt of order, with inspection and acceptance occurring at the destination. All quotes must be submitted through the DLA Internet Bid Board System (DIBBS). The contract includes stringent technical and safety requirements, specifically prohibiting the intentional addition of mercury or mercury-containing compounds in accordance with NAVSEA 5100-003D for submarine applications. Technical data associated with this item is subject to ITAR or EAR export controls, requiring contractors to have approved US/Canada Joint Certification Program certification and completed specific DLA export-control training. Packaging and marking must comply with MIL-STD-2073-1E and MIL-STD-129, while invoicing must be processed electronically via the Wide Area WorkFlow system. Additional compliance is required for Buy American and Balance of Payments programs, as well as various FAR and DFARS clauses regarding equal opportunity, combating trafficking in persons, and cybersecurity for controlled unclassified information.
CONSTRUCTION & EQUIPMENT MRO SVC I

POSTED

3 days ago

DEADLINE

in 4 days
NAICS: 332420
DIBBS
CYLINDER, COMPRESSED GA
Solicitation # SPE4A5-26-T-472X
Solicitation SPE4A5-26-T-472X is a total small business set-aside issued by the DLA Aviation ASC Supplier Oper OEM Division for the procurement of 93 drained and empty 45-minute 30-year compressed gas cylinders. The required items are identified as commercial off-the-shelf products, specifically Scott Technologies, Inc. part number 804722-31-D (NSN 8120-01-699-5561). The contract specifies a delivery lead time of 166 days, with a need ship date of March 17, 2027, and an original required delivery date of March 31, 2027. Delivery is FOB Origin, with the destination and acceptance point located at DLA Distribution San Joaquin in Tracy, California. Technical requirements mandate that cylinder treatment and painting meet Compressed Gas Association TB-17-2000 standards. Quality assurance will be managed through destination inspection using sampling methods per MIL-STD-1916 or ASQ H1331, with specific AQLs assigned for critical, major, and minor attributes. Packaging must adhere to MIL-STD-2073-1E and RP001, with domestic shipments following DOT regulations and export shipments meeting UN International requirements. All shipments must be marked according to MIL-STD-129. Administrative requirements include electronic invoicing via the Wide Area WorkFlow system and compliance with DFARS cybersecurity and domestic material restrictions, including the Buy American Act and Berry Amendment.
ASC SUPPLIER OPER OEM DIVISION

POSTED

8 days ago

DEADLINE

in about 4 hours
NAICS: 332420
Federal
CFA-686 Carbon-based Fuels Capability - CO2 Storage Vessel
Solicitation # INL-26-056
Battelle Energy Alliance, LLC, acting as the Management and Operating Contractor for the Department of Energy's Idaho National Laboratory, is seeking Expressions of Interest for the design, fabrication, testing, and inspection of the V-738 pressure vessel. This vessel is a 200 cubic foot, ASME BPVC Section VIII, Division 1 code U-stamped unit intended for gaseous CO2 service within the Central Facilities Area Carbon-based Fuels Capability. The horizontal vessel will be constructed from 304/304L stainless steel with a design pressure of 1,800 psig and a temperature range of -40 to 500 degrees Fahrenheit. It features a 36-inch inner diameter, seven nozzles, nine band heating elements, and Foamglas insulation with aluminum sheathing. The unit must be designed for static, seismic, and wind loading per IBC 2024, ASCE 7-10, and ACI 318-19 to withstand the high desert environment of Idaho. The procurement process begins with this Expression of Interest to identify qualified vendors, with selected firms invited to a subsequent Request for Proposal for a firm-fixed price contract. Qualified offerors must possess a current U-stamp certificate, demonstrate expertise in stainless steel welding with 100 percent radiography, and provide a comprehensive quality control system meeting ASME BPVC Section VIII Division 1 Mandatory Appendices 10 and 47. The total project duration is 28 weeks after receipt of order, encompassing design, fabrication, and delivery to the Idaho National Laboratory. Interested firms must submit a qualification package of no more than five pages to Chase Egbert by October 16, 2026, detailing their technical capabilities, inspection plans, and availability of experienced project and quality control management.
Battelle Energy Alliance–doe Cntr

POSTED

8 days ago

DEADLINE

in 16 days
NAICS: 332420
International
RFQ - Design Build – McCallum Replacement Diesel Tank
Solicitation # 109259 MG
Newfoundland Labrador Hydro has issued a Request for Quotation (RFQ 109259 MG) for the design-build replacement of a diesel storage tank at the McCallum Diesel Plant in Newfoundland and Labrador. The project involves the decommissioning and removal of an existing 90,000L vertical tank and the design, fabrication, and installation of two new 12,000L horizontal diesel tanks with a shared steel support platform, totaling a 24,000L capacity. The work is expected to take approximately 12 months, with a required completion date no later than August 31, 2027. The scope includes site services, engineering support, and ensuring operational continuity by transferring clean fuel into temporary storage during construction. All designs must be authenticated and stamped by a professional engineer as per PEG-NL standards. The contract will be awarded to the top-ranked respondent based on a combined score of non-price rated criteria and pricing, with a total weighting of 100 points. Non-price evaluation focuses on construction and design experience, specifically prioritizing contractors with expertise in remote communities, diesel tanks, and coastal environments. Pricing accounts for 70% of the total score and is evaluated using a relative formula. Mandatory requirements include ISNetworld (ISN) registration with a minimum grade of B, compliance with Bill S-211 regarding forced and child labour, and the submission of a detailed construction schedule. Bidders must also adhere to strict quality assurance protocols; while fabrication facilities are expected to be ISO 9001 certified, a bidder's own QA program is an acceptable alternative if submitted with the bid. Submissions must be uploaded via the specified electronic bidding portal by the deadline of October 7, 2026.
Newfoundland Labrador Hydro

POSTED

29 days ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The contract involves comprehensive upgrades to the sodium hypochlorite system at the Southwest Wastewater Treatment Plant, managed by the City of Sunrise in Florida. The scope includes removing existing sodium hypochlorite storage tanks, feed pump skids, recirculation pumps, and their associated electrical connections, piping, valves, and supports. To ensure continuous operation during construction, temporary sodium hypochlorite storage and feed systems will be furnished and installed. The project also entails installing new sodium hypochlorite storage tanks, pump skids, recirculation pumps, tank fill dilution panels, potable water backflow preventers, and all related piping, valves, electrical, and instrumentation work. Additionally, containment areas and metal building coatings will be constructed, and any disturbed areas will be restored post-construction, all in accordance with the bid documents. The solicitation, titled "Southwest WWTP Sodium Hypochlorite System Improvements," was posted on October 20, 2025, with a response deadline of November 24, 2025. The project is estimated to cost between $500,000 and $1,500,000 and is categorized under NAICS code 332420. The work aims to enhance the safety, reliability, and efficiency of the plant’s chemical handling systems, ensuring minimal operational disruption during upgrades. Interested contractors can access further details through the provided DemandStar link.

General Info

Place of Performance

FL, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → City of Sunrise
ContactsNo contacts available
OfficeN/A
Organization / AgencyFlorida → City of Sunrise
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The Work consists of, but not limited to, removal of existing sodium hypochlorite storage tanks, feed pump skids, recirculation pump, associated electrical connections, piping, valves and supports, furnish and install temporary sodium hypochlorite storage and feed to avoid operational interruptions at the facility, furnish and install the new specified sodium hypochlorite storage tanks, pump skid, recirculation pump, tank fill dilution panel, potable water backflow, associated piping, valves and appurtenances, associated electrical and instrumentation work for the new equipment to be installed, containment area and metal building coatings. Work site restoration of any areas disturbed during construction. All work shall be constructed in accordance with the Bid documents.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS