Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Georgia was posted on May 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Spare Materials and Maintenance Kit Supply

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 423330
SLED
FPCM-COR-I-001054-118-309A-RS Roof Replacement
Solicitation # FPCM-COR-I-001054-118-RS
The California Department of Corrections and Rehabilitation is soliciting bids for solicitation number FPCM-COR-I-001054-118-RS for a materials-only purchase of a complete roofing system for the California State Prison, Corcoran, specifically focusing on Building 309A Central Kitchen Phase 1. This is a product-only procurement where the State will handle all installation. The required system must feature a thermoplastic Polyvinyl-Chloride (PVC) roofing membrane, extruded polystyrene (XPS) insulation, and necessary adhesives and sealants. All proposed assemblies must be FMGI approved with a current RoofNav report and include a standard ten-year full system manufacturer warranty. Bids are due by December 17, 2026, at 2:00 PM and must be submitted using the State's official bid forms to Roberta Sanchez. Required documentation includes a detailed materials list, product cut sheets, and a completed Roof System Review Checklist. Prospective bidders must attend a mandatory walk-thru and ensure they can obtain necessary security clearances for delivery within the secure perimeter of the facility. The contract will be awarded to the lowest responsible bidder, with specific preferences available for California Certified Small Businesses and Disabled Veteran Business Enterprises. Materials must be delivered FOB Destination to the project site in original, undamaged manufacturer containers.
California Department of Corrections & Rehabilitation

POSTED

about 1 month ago

DEADLINE

in about 1 month
NAICS: 423330
SLED
FPCM-SVSP-I001020-103-KM COMPLETE ROOFING SYSTEM
Solicitation # FPCM-SVSP-1001020-103-KM
The California Department of Corrections and Rehabilitation is soliciting bids for a material-only purchase of complete roofing systems for Buildings 461 and 420 at Salinas Valley State Prison. The scope of work involves providing all necessary materials and fabrication, including 80 mil adhered white PVC thermoplastic membranes with factory-applied felt backing, XPS tapered insulation, gypsum sheathing, and various flashing and sheet metal products. Building 461 covers approximately 31,329 square feet, while Building 420 covers approximately 6,165 square feet. The state will handle the installation, but the supplier must provide a manufacturer's standard ten-year full system warranty with no dollar limit, which will be finalized upon installation and acceptance by a manufacturer's representative. Bids are due by November 10, 2026, and must be submitted on an all-or-none basis. Prospective bidders are required to attend a mandatory walk-thru and must provide a detailed materials list, product cut sheets, and a completed Roof System Review Checklist. All materials must meet FM Global listings for wind uplift and insulation adhesive standards. Deliveries are FOB Destination to Salinas Valley State Prison in Soledad, California, and require proper security clearances for personnel entering the secure perimeter. Preference in award may be given to California certified Small Businesses and Disabled Veteran Business Enterprises.
California Department of Corrections & Rehabilitation

POSTED

2 months ago

DEADLINE

in 18 days

AI Contract Overview

Show more

The contract involves supplying spare flooring materials totaling 5% of the original quantity, with a minimum of 10 square yards, sourced from the same production batch to ensure consistency. These materials must be appropriately packaged and labeled to facilitate long-term storage and be readily available for future repair needs. The contract is classified as a subcontract under NAICS code 423330 and is issued by the Fayette County Board of Education in Georgia. Bids or responses for this contract must be submitted by June 10, 2026. The procurement focuses on maintaining the quality and integrity of the original flooring installation by guaranteeing access to matching replacement materials. While specific location details for performance and points of contact were not provided, the contract emphasizes careful packaging and labeling to support future maintenance and repair efforts.

General Info

Supply 5% spare flooring from same batch, minimum 10 sq yd; ensure packaging, labeling, storage.

Documents

This scope was carved out of 26-033-075.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Flooring Projects for Fayette County Public Schools (RFQ 26-033-075)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Fayette County Board of Education
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Provision of spare flooring materials (5%, minimum 10 sq yd) from same product run, properly packaged and labeled for long-term storage and future repairs.

More opportunities from Georgia → Fayette County Board of Education

Same awarding agency

NAICS: 513130
SLED
Science Instructional Materials Adoption (RFI 27-006-093)
Solicitation # PE-65615-NONST-2027-000000116
Fayette County Public Schools is issuing Request for Information RFI 27-006-093 to gather data from publishers and instructional resource providers to inform the District's 2028 Science Instructional Materials Adoption. The District is seeking high-quality, standards-aligned materials for 6th Grade Science with an Earth Science focus, 7th Grade Science with a Life Science focus, and High School Environmental Science. Required materials include print textbooks, supporting digital resources, assessments, and implementation services, all of which must align with the Georgia Standards of Excellence for Science. Interested providers must submit their responses by December 7, 2026. Deliverables include a minimum of five student textbooks and two teacher editions per course, digital login credentials valid through May 31, 2027, an inventory list, and a standards alignment crosswalk. While this RFI is for planning purposes and does not guarantee a future purchase, the District has outlined a tentative timeline that includes initial and teacher reviews in 2027, possible classroom pilots through winter 2028, and final implementation in fall 2028. Respondents are requested to provide detailed line-item pricing for initial purchases, replacements, subscriptions, and professional learning services to assist in the development of a future Request for Proposal.
Book Publishers

POSTED

12 days ago

DEADLINE

in 23 days
View Details
NAICS: 336120
SLED
School Buses for Transportation (RFP 27-005-076)
Solicitation # PE-65615-NONST-2027-000000115
Fayette County Public Schools is soliciting proposals under RFP 27-005-076 to establish a multiyear contract for the procurement of student transportation school buses. The District intends to purchase approximately 15 buses annually over a five-year period, consisting of 48- to 54-passenger special-needs buses and 72-passenger general-use buses. The contract begins at the time of award and continues through June 30, 2027, with options to renew for up to five additional terms. Annual orders are expected in late fall or early winter, with all deliveries required to be completed at the Goza Road Operations Center in Fayetteville, Georgia, before the last week of school in May. Technical requirements include a minimum three-year bumper-to-bumper warranty for both the chassis and body, with service performed on-site or via mobile technician. Specific hardware mandates include a child check system meeting Georgia specifications, Valeo Smart Hatches, and remote-control heated mirrors. Proposals will be evaluated using a 100-point weighted system based on proposal quality (40%), qualifications and experience (30%), and price and cost (30%). Submissions must be received by December 3, 2026, and must include a letter of interest, technical proposal, qualifications, references, and a separate cost proposal.
Heavy Duty Truck Manufacturing

POSTED

19 days ago

DEADLINE

in 19 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS