Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on July 21, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Specialty Coatings and Corrosion-Resistant Materials Supply

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This subcontract, issued by the Department of Defense under the 56 Cons Cc agency, involves the procurement of specialty coatings and corrosion-resistant materials. The specific requirement is for Supply Pro Industrial Pro-Cryl Off White primer and Acrylic Coating, which must adhere to strict military aircraft display standards regarding pencil hardness, cyclic corrosion, and salt fog resistance. The opportunity is designated as a Total Small Business Set-Aside under NAICS code 325510. Performance for this contract is located at Luke Air Force Base in Arizona. The solicitation was posted on July 21, 2020, with a response deadline of July 27, 2020.

General Info

DoD small business subcontract for specialty aircraft coatings at Luke Air Force Base.

NAICS

325510 - Paint and Coating Manufacturing

Place of Performance

Luke AFB, AZ, 85309, USA

Set-Aside

SBA

Documents

This scope was carved out of FA488720R0013.

The full solicitation package (10 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Repaint Air Park Static Display at Luke AFB

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4887 56 Cons Cc
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply Pro Industrial Pro-Cryl Off White primer and Acrylic Coating meeting salt fog, cyclic corrosion, and pencil hardness standards for military aircraft display use.

More opportunities from Department Of Defense → FA4887 56 Cons Cc

Same awarding agency

NAICS: 335921
New
Federal
56 CS FOC to Flightline and Wx Equipment, Luke AFB
Solicitation # F3YCFA6173AC01
Solicitation F3YCFA6173AC01 is a firm-fixed-price requirement for the engineering, furnishing, installation, and testing of new 12-strand single-mode fiber optic cable at Luke Air Force Base, Arizona. The project involves connecting various critical facilities, including Radar Approach Control, the Air Traffic Control Tower, Base Operations, the Command Post, and several meteorological and navigation stations. The scope includes the installation of 13 fiber optic distribution panels, the replacement of TC Communications equipment, and the provision of UPS and training. Work will utilize a combination of existing manhole/handhole duct systems and direct burial, with the latter requiring a minimum depth of 36 inches or the manufacturer's specification. This requirement is set aside 100% for SBA Certified Women-Owned Small Businesses under NAICS code 335921. The contract performance period is not to exceed 180 calendar days, with a target completion date of July 1, 2027, and a requirement to finish all facets within 120 days of award. Award will be based on the lowest priced, technically acceptable quote, evaluated through technical subfactors including installation design and a quality control plan, as well as past performance via the Supplier Performance Risk System. Contractors must be certified telecommunications professionals and adhere to strict environmental and security guidelines, including the submission of an OPSEC plan and compliance with Luke AFB environmental standards. A mandatory site visit is scheduled for November 4, 2026, and final offers are due by November 9, 2026.
Fiber Optic Cable Manufacturing

POSTED

1 day ago

DEADLINE

in 11 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS