Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Kansas was posted on April 25, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Specialty Material Supply for Wastewater Plant

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 423730
New
SLED
IFB 27-08 Heat Pump and HVAC Training Equipment and Supplies, Amatrol Proprietary
Solicitation # BD-27-1373-1373C-1373L-135253
Cape Cod Community College is soliciting bids for the furnishing, delivery, installation, and instructor training of proprietary Amatrol Heat Pump and HVAC training equipment and supplies. The scope includes several specific Amatrol systems, such as Basic Refrigeration, Digital Gauge Manifold, Refrigerant Recovery and Charging, Residential Heat Pump Troubleshooting, Residential Mini-Split Heat Pump, Combined Refrigeration Installation, HVAC Controls, and Portable AC/DC Electrical learning systems. All equipment must include integrated student and instructor curricula, and the HVAC Controls system must feature specific safety components including sheathed leads, lockout/tagout, and component guards. The contract will be awarded to the responsive and responsible bidder offering the lowest total price for all requested products. To be considered responsive, bidders must provide pricing for every line item and submit all required forms, including the Bidder Information Form, Tax Compliance Certificate, Certificate of Non-Collusion, Debarment and Suspension Certification, and the Price Proposal Form. Bids must be sealed and delivered to the West Barnstable campus by November 24, 2026, at 4pm EST; electronic submissions via fax or email are not permitted. All deliverables must be delivered FOB Destination to the college's West Barnstable campus on or before April 16, 2027. Due to the lack of a loading dock, the delivery carrier is required to use a commercial truck with a motorized lift-gate. Invoices must be sent to the Accounts Payable Department with itemized lists of reimbursement charges. The contract is subject to Commonwealth Terms and Conditions, which supersede vendor terms, and may be canceled at any time based on funding availability or performance.
Cape Cod Community College

POSTED

about 12 hours ago

DEADLINE

in 14 days
NAICS: 423730
New
SLED
HVAC and Refrigeration Parts
Solicitation # 2026-RFB-0109
The Sacramento County Facilities Division is seeking competitive bids under solicitation 2026-RFB-0109 for the procurement of new and unused HVAC and refrigeration parts and components. These materials, which include HVAC equipment, compressors, coils, valves, refrigerants, motors, electrical components, belts, bearings, chemicals, and filters, will be purchased on an as-needed basis to maintain County facilities. This is a cooperative purchasing agreement through the Sacramento County Procurement Alliance, and the County may make multiple awards to ensure the best pricing, product availability, and delivery timelines. Bidders must submit pricing as a percentage discount from catalog models for eight specified product categories. The contract will be awarded to the lowest responsive and responsible bidder, with a preference given to Sacramento County products and local bidders. A 2 percent price preference is available for State Certified Micro-Business enterprises located within the Sacramento Regional Market Area. All responses must be submitted electronically via the SacCountyE bids portal by the deadline of November 20, 2026. Payment will be processed through a Virtual Card Program in partnership with U.S. Bank following the inspection and acceptance of goods. Contractors are required to abide by all manufacturer warranties and comply with all applicable federal, state, and local regulations. All employees of the awarded contractor must be covered by standard insurance, including Worker's Compensation and State Disability Insurance.
DGS: CAPSD - Procurement

POSTED

3 days ago

DEADLINE

in 10 days
NAICS: 423730
New
SLED
PACKAGED TERMINAL AIR CONDITIONERS DUE: 2PM OPENS: 3PM
Solicitation # 50011-ULLAF27009
The University of Louisiana at Lafayette is soliciting bids for the furnishing and delivery of up to 30 Packaged Terminal Air Conditioner (PTAC) through-the-wall cooling units. The basis of design is the First Co. ECO-Series Cool-Pak ECE18205A00A000F or an equivalent model that meets mandatory specifications, including a minimum 18,000 BTUH nominal cooling class, 208/240 V single phase electrical requirements, and compatibility with a 44 inch by 21-5/8 inch standard sleeve rough-in. All products must be new, of the current manufacturer model, and of the best quality, as remanufactured or used products will not be accepted. The contract will be awarded to the lowest responsible and responsive bidder, with a total initial performance period not to exceed twelve months. Bids must be submitted electronically by November 19, 2026, at 2:00 PM CST, and must include a signed bid form with net pricing on an F.O.B. UL Lafayette Destination basis. Required documentation includes manufacturer specifications, a certificate of insurance, and a standard warranty typically consisting of one year for parts and labor and two to six years for the sealed system and compressor. The successful vendor must maintain commercial general liability insurance with a minimum of $1,000,000 per occurrence and comply with Louisiana Workers’ Compensation Law. Payment terms are Net 60 days after delivery and acceptance, and the university is exempt from all Louisiana state and local sales and use taxes.
University of Louisiana at Lafayette

POSTED

5 days ago

DEADLINE

in 9 days
NAICS: 423730
New
International
Автоматична станція для заправки кондиціонерів Konfort 720 TOUCH або еквівалент, код ДК 021:2015: 42510000-4 — Теплообмінники, кондиціонери повітря, холодильне обладнання та фільтрувальні пристрої
Solicitation # UA-2026-11-03-013780-a
This procurement process, managed by the Ternopil Professional College of the Ternopil National Technical University named after Ivan Puluj, involves the acquisition of an automatic air conditioner charging station, specifically the Konfort 720 TOUCH or an equivalent model. The purchase is part of a public investment project aimed at modernizing workshops and laboratories in professional and pre-higher education institutions to improve energy efficiency, safety, and inclusivity. The selection process is based solely on the price criterion, which carries a weight of 100 percent. Tender proposals must be submitted in Ukrainian, although documents in other languages are permitted provided they include a certified translation. The deadline for responses is November 18, 2026, and the procurement is conducted under the legal framework of Ukraine.
Відокремлений структурний підрозділ «Тернопільський фаховий коледж Тернопільського національного технічного університету імені Івана Пулюя»

POSTED

7 days ago

DEADLINE

in 9 days

AI Contract Overview

Show more

Johnson County, Kansas, is seeking a subcontractor for the supply of specialty materials for a wastewater plant project. The scope of work includes providing pipes, valves, fittings, rebar, and electrical components that strictly adhere to provided specifications. All materials must feature ASME A13.1 labeling and be delivered in corrosion-resistant packaging to ensure quality and safety. This subcontract opportunity was posted on April 25, 2024, and requires responses to be submitted by the deadline of June 7, 2024. The procurement falls under NAICS code 423730, focusing on the supply of hardware and industrial components necessary for the facility's infrastructure.

Documents

This scope was carved out of 2024-001.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Douglas L. Smith Middle Basin Influent Screening, Disinfection & PEW Improvement Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyKansas → Johnson County
ContactsNo contacts available
OfficeN/A
Organization / AgencyKansas → Johnson County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply of specification-compliant pipes, valves, fittings, rebar, and electrical components with ASME A13.1 labeling and corrosion-resistant packaging.

More opportunities from Kansas → Johnson County

Same awarding agency

NAICS: 237110
New
SLED
Progressive Design Build - Brush Creek Pump Station Improvements Project (MTM1-C080)
Solicitation # 2026-045
Johnson County, Kansas, is seeking a Design-Builder for the Brush Creek Pump Station Improvements Project (Contract No. MTM1-C080) through a three-phase Progressive Design-Build procurement process. The project involves replacing a pump station that has reached the end of its useful life, with a scope that includes preconstruction and design services based on a March 2026 Preliminary Engineering Report. The new facility must be designed to handle current flows and future wet weather flows resulting from the decommissioning of the Peak Excess Flow Treatment Facility. The procurement begins with a Request for Qualifications to shortlist three to five firms, followed by a Request for Proposal including cost submissions, and concluding with interviews to select a single firm for contract negotiations. The anticipated project timeline begins with a Notice to Proceed in June 2027, with design and GMP development continuing through September 2028 and construction starting in January 2029, targeting final completion by December 2030. Baseline cost estimates for the pump station are approximately 5.4 million dollars, with additional allocations for mobilization and home office overhead. Qualified respondents must be legally registered in Kansas, demonstrate bonding capacity up to 20 million dollars, and meet strict insurance and safety requirements. Evaluation is based on the greatest value to the county, considering factors such as project experience, personnel depth, and the proposed approach to design and construction planning. All submissions must be filed electronically via the IonWave portal by December 9, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

6 days ago

DEADLINE

in 29 days
View Details
NAICS: 238210
SLED
Johnson County Library (JCL) Central Fleet EV Chargers Installation Project
Solicitation # 2026-056
The Johnson County Library (JCL) Central Fleet EV Chargers Installation Project, solicitation number 2026-056, involves the installation of three owner-provided electric vehicle chargers at the Johnson County Central Resource Library in Overland Park, Kansas. The scope of work requires the contractor to provide all necessary labor, materials, equipment, and supervision to complete the installation in accordance with specific electrical site utility plans, one-line diagrams, and technical specifications. Bids must be submitted electronically via IonWave by November 20, 2026, at 2:00 PM CT. A mandatory pre-bid conference and site visit were scheduled for November 5, 2026, and representation by General or Prime Contractors is required for eligibility. Qualified bidders must submit a bid bond for 5% of the total bid amount, issued by a surety company licensed in Kansas, for bids totaling $75,000 or more. Additional requirements include performance and payment bonds, a statutory bond to the State of Kansas, and CORE4 tax clearance certifications for awards exceeding $150,000. The contract follows AIA A701-2018 and AIA A104-2017 standards, with payments processed within 30 to 45 days of receiving a certified request. A standard retainage of 5% will be held until final completion, which is subject to inspection and approval by the Architect. Liquidated damages for delays are set at $500.00 per day.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

12 days ago

DEADLINE

in 10 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS