Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on January 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Spinkler Head Replacement - Matsqui Complex

Closed
21807-25-0078ACanada

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract calls for the replacement of expired sprinkler heads across multiple buildings within the Matsqui Complex, which includes the Pacific, Matsqui, and Fraser Valley institutions, under the Correctional Service of Canada. The objective is to ensure continued fire suppression efficacy by replacing deficient sprinkler heads with identical or equivalent models, adhering to original fire suppression designs and NFPA 13 standards. Specific quantities and types of sprinkler heads for each building are detailed, with the contractor responsible for isolating and draining sprinkler systems, replacing heads, controlling water release, repairing any resulting damage, and restoring finishes to prior conditions. Additionally, the contractor must provide spare heads to maintain adequate spare supplies per NFPA 13. Work must be performed at the Matsqui Complex in Abbotsford, British Columbia, with no anticipated travel required. The selection process is open only to Canadian suppliers, following the Canadian Free Trade Agreement, and will be awarded to the lowest priced compliant bid. The contract excludes any security requirements, set-asides for Indigenous suppliers, or land claim agreements. All work must be completed by March 31, 2026, and conducted in English. The contractor must also provide manufacturer’s shop drawings and specifications for the replaced sprinkler heads to the Facilities Management team. Bidders can access detailed solicitation documents and seek procurement support through free seminars offered by Procurement Assistance Canada.

General Info

Replace expired sprinkler heads at Matsqui Complex per NFPA 13 by March 31, 2026.

Agency

Government of Canada → Correctional Service of Canada

NAICS

238220 - Plumbing, Heating, and Air-Conditioning Contractors View NAICS

Place of Performance

Canada, British Columbia, Abbotsford, CAN

Set-Aside

NONE

Documents

(3)

Invitation to Tender 21807-25-0078A Sprinkler Head Replacement Matsqui Complex

PDF35 pagesitb

Invitation to Tender 21807-25-0078A Sprinkler Head Replacement Matsqui Complex

PDF39 pagesitt

NPP - Sprinkler Head Replacement - Matsqui Complex - 21807-25-0078A

PDF6 pagessow

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Correctional Service of Canada
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Correctional Service of Canada
Office AddressN/A
Contacts
Katie McKeeverContracting Authority

Full Description

Show more
Sprinkler Head Replacement – Matsqui Complex This requirement is for: The Correctional Service of Canada. Trade agreement: Canadian Free Trade Agreement (CFTA) Policy on Reciprocal Procurement: This solicitation is open only to Canadian suppliers. Competitive Procurement Strategy: Lowest priced compliant bid. Set-aside under the Procurement Strategy for Indigenous Business: This procurement is not subject to any set-asides for Indigenous Suppliers. Comprehensive Land Claim Agreement: This procurement is not subject to a Comprehensive Land Claims Agreement. Security Requirements: This contract does not include security requirements. Nature of Requirements: The following is a summary of the statement of work for this requirement. The Correctional Service of Canada has a requirement to replace sprinkler heads that have expired due to age and require lifecycle replacement for buildings in the Matsqui Complex. That complex includes the following institutions: Pacific, Matsqui and Fraser Valley. The work will involve the following: 1.1 Background: The Correctional Service of Canada’s recent annual fire inspection Contractor has provided Matsqui Complex with reports indicating the sprinkler heads are due for replacement in multiple buildings. 1.2 Objectives: To replace the existing deficient sprinkler heads with the same or equivalent make and model to ensure fire suppression continuity in accordance with the building’s original fire suppression design specifications and NFPA 13 standards. 1.3 Tasks Matsqui Institution: 1.3.1 The Contractor must isolate and drain the sprinkler systems in building M3, Living Unit 1, Living Unit 2 and Living Unit 3 and remove and replace deficient sprinkler heads of the following make and model, in the following quantities: Living Unit 1: V2707 = 90 heads K5.6 155°F V2709 = 108 heads K5.6 155°F Living Unit 2: V2707 = 90 heads K5.6 155°F V2709 = 108 heads K5.6 155°F Living Unit 3: V2707 = 90 heads K5.6 155°F V2709 = 108 heads K5.6 155°F 1.4 Tasks Fraser Valley Institution: 1.4.1 The Contractor must isolate and drain the sprinkler systems in building A, B, D, F and G and remove and replace deficient sprinkler heads of the following make and model, in the following quantities: Building A: TY3231 = 97 heads K80.6 68°C TY3131 = 14 heads K80.6 93°C TY3131 = 6 heads K80.6 68°C TY3335 = 3 heads K80.6 68°C Building B: TY3231 = 42 heads K80.6 68°C TY3131 = 25 heads K80.6 93°C TY3131 = 44 heads K80.6 68°C TY3331 = 1 head K80.6 68°C Building D: VK-302 = 40 heads K 5.6 200°F VK-410 = 22 heads K 5.6 165°F VK-442 = 4 heads K 5.6 200°F VK-300 = 3 heads K 5.6 200°F Building F: V2708 = 71 heads K80.75 68°C V2726 = 26 heads K80.75 79°C V2710 = 6 heads K 5.6 68°C V2710 = 2 heads K80.75 79°C V2716 = 11 heads K80.75 93°C C3201 = 55 heads K 5.6 155°F C3101 = 8 heads K 5.6 200°F BB-117 = 27 heads K112.4 100°C SD1 = 10 heads K80.75 100°C Building G: C2296 = 12 heads K 4.3 155°F C2296 = 1 head K 4.3 200°F 1.5 Tasks Pacific Institution: 1.5.1 The Contractor must isolate and drain the sprinkler systems in Building A and remove and replace deficient sprinkler heads of the following make, model and quantities: 1.5.2 The Contractor must isolate and drain the sprinkler systems in Building B and remove and replace deficient sprinkler heads of the following make, model and quantities: 1.5.3 The Contractor must isolate and drain the sprinkler systems in Building C and remove and replace deficient sprinkler heads of the following make, model and quantities: 1.5.4 The Contractor must isolate and drain the sprinkler systems in Building D and remove and replace deficient sprinkler heads of the following make, model and quantities: 1.5.5 The Contractor must isolate and drain the sprinkler systems in Building F and remove and replace deficient sprinkler heads of the following make, model and quantities: 1.5.6 The Contractor must isolate and drain the sprinkler systems in Building F8 and remove and replace deficient sprinkler heads of the following make, model and quantities: TY3231 = 19 heads K5.6 68°C TY3131 = 5 heads K5.6 68°C V3301 = 6 heads K5.6 68°C 1.5.7 The Contractor must isolate and drain the sprinkler systems in Building G and remove and replace deficient sprinkler heads of the following make, model and quantities: 1.5.8 The Contractor must isolate and drain the sprinkler systems in Building H and remove and replace deficient sprinkler heads of the following make, model and quantities: 1.5.9 The Contractor must isolate and drain the sprinkler systems in Building J and remove and replace deficient sprinkler heads of the following make, model and quantities: GL4231 = 13 heads K4.2 68°C GL4110 = 10 heads K4.1 68°C 1.5.10 The Contractor must isolate and drain the sprinkler systems in Building N and remove and replace deficient sprinkler heads of the following make, model and quantities: V3201 = 22 heads K5.6 68°C VK3101 = 9 heads K5.6 121°C TY3131 = 3 heads K5.6 93°C 1.5.11 The Contractor must isolate and drain the sprinkler systems in Building P and remove and replace deficient sprinkler heads of the following make, model and quantities: TY3131 = 30 heads K5.6 68°C VK3101 = 8 heads K5.6 121°C V3301 = 9 heads K5.6 68°C 1.5.12 The Contractor must isolate and drain the sprinkler systems in Building Q remove and replace deficient sprinkler heads of the following make, model and quantities: TY3231 = 66 heads K5.6 68°C 1.5.13 The Contractor must isolate and drain the sprinkler systems in Building S and remove and replace deficient sprinkler heads of the following make, model and quantities: V3201 = 44 heads K5.6 68°C VK3101 = 2 heads K5.6 68°C 1.5.15 The Contractor must supply the correct quantity of spare sprinkler heads for the spare head box located at each building system’s sprinkler tree as per NFPA 13. 1.5.16 The Contractor is responsible for the control of releasing water from the sprinkler system and the Contractor must rectify any resulting damage. 1.5.17 The Contractor is responsible for returning damage caused by the Contractors personnel or areas the Contractor modified to obtain access to the sprinkler heads back to existing finishes. 1.5.18 The Contractor must provide the equipment needed to access high located sprinkler heads. 1.6 Deliverables: 1.6.1 The Contractor must provide and install the new sprinkler heads in accordance with NFPA 13 standards. 1.6.2 The Contractor must provide the new sprinkler head manufacturer’s shop drawings and specifications to Facilities Management for each type of sprinkler head the Contractor replaces. 1.7 Location of work: 1.6.1. The Contractor must perform the work at: a. Matsqui Complex -Central Heat Plant, 33344 King Road, Abbotsford, BC V2S 4P3 1.8 Travel 1.7.1 No travel is anticipated for the performance of the work under this contract. 1.9 Language of Work: 1.8.1 The contractor must perform all work in English. Any conditions for participation of suppliers not specified in solicitation documentation: none. Estimated quantity of commodity: see solicitation document statement of work and basis of payment. Duration of Contract and Time Frame for Delivery: The Contractor must perform and complete the work by March 31, 2026, from the date of notification of acceptance of the offer. File Number: 21807-25-0078 Contracting Authority: Katie McKeever Telephone number: 236-380-2294 E-mail: Katie.McKeever@CSC-SCC.GC.CA NOTE TO BIDDERS: Bidders can obtain the complete statement of work and evaluation criteria by downloading the solicitation document and associated documents from the website. The Crown reserves the right to negotiate with suppliers on any procurement. Documents may be submitted in either official language of Canada (English or French). After contract award, bidders may request a debriefing on the results of the bid solicitation process. Bidders should make the request to the Contracting Authority within fifteen (15) working days of receipt of the results of the bid solicitation process. The debriefing may be in writing, by telephone or in person. Procurement Assistance Canada (PAC) offers seminars to businesses interested in learning how to sell goods and services to the Government of Canada. The seminars are FREE. Topics include:  Understand the federal procurement process;  Learn about searching for opportunities;  Find out how to bid on opportunities;  Discover how to prepare to sell to the government. The full schedule of seminars can be found on the Procurement Assistance Canada website, under find an event (Procurement Assistance Canada: Find an event - Canada.ca).