Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of Canada was posted on September 23, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ST. MARY’S RIVER TOWER REPLACEMENT SAILORS ENCAMPMENT RANGE AND STRIBLING POINT RANGE (LL5414, LL5415, LL5416, LL5417)

Closed
30005469International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex located at 28 Bare Cove Park Drive. This fixed-price lump sum project has an estimated construction cost of $1,300,000. The scope of work includes site preparation such as the removal of trees, shrubs, and stumps, re-grading the site, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the contractor is responsible for a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor must coordinate with the Town and the demolition contractor, Pasquazzi Bros, Inc., and is responsible for maintaining construction fencing and erosion control throughout the project duration. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or paved athletic facilities. Bidders must submit their proposals electronically via the OpenGov portal by November 3, 2026, including a 5% bid security and a Statement of Qualifications with at least three similar public project references. Awarded contractors must provide a payment bond equal to 50% of the total project cost and adhere to Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code. The project includes a minimum one-year warranty for labor and a two-year warranty for materials. Final payment is contingent upon the submission of AIA affidavits for the payment of debts and release of liens.
Recreation

POSTED

about 7 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Pre-Qualification For Construction Of Park, Recreation & Libraries Parks And Facilities For 2027
Solicitation # 13-202
Solicitation 13-202 is a pre-qualification process issued by the City of Roseville, California, for the construction of park, recreation, and library facilities scheduled for 2027. The objective is to identify qualified contractors with the capacity and experience to execute new park construction and rehabilitation projects. Interested parties must submit their pre-qualification packages via email to the City Clerk’s Office by 3:00 p.m. on November 23, 2026. Submissions are limited to 25 megabytes and must include a signed questionnaire, DIR registration for all contractors and subcontractors, and current workers' compensation certificates of insurance. To achieve pre-qualified status, applicants must meet essential qualifications, including a valid California Contractor's license and specific insurance limits of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate. Experience requirements mandate the completion of at least six new park construction projects for public agencies within the last three years, with a maximum of three rehabilitation projects allowed toward this total. Financial solvency is verified through third-party credit checks, where a score of 650 or less may lead to disqualification. Evaluation also considers compliance with California apprenticeship laws, Davis-Bacon prevailing wage requirements, and CAL OSHA safety standards.
City of Roseville, Parks, Recreation & Libraries Department (PRL)

POSTED

about 7 hours ago

DEADLINE

in 25 days

AI Contract Overview

Show more

This contract, issued by Fisheries and Oceans Canada, involves the replacement of four end-of-lifecycle skeleton style towers and their concrete foundations at the Sailors Encampment and Stribling Point ranges in the St. Mary's River area. The scope of work requires the contractor to provide all labor, materials, and equipment to design four site-specific concrete foundations, which must be stamped by a Professional Engineer licensed in Ontario. Following approval from the Canadian Coast Guard, the contractor will install the foundations and erect four supplied Quebec Towers with heights of 40, 45, 70, and 70 feet, including the installation of corresponding daymarks. Once the new structures are complete, the contractor is responsible for the demolition of the four existing towers and their foundations. The project covers four specific coordinates, with three sites accessible by land and one accessible only by boat or helicopter. To support the design process, the Canadian Coast Guard will provide geotechnical reports and tower drawings. This procurement is a two-phase selection process, beginning with a Request for Qualifications to evaluate bidder experience before proceeding to financial bidding. All work under this contract must be completed by February 28, 2025.

General Info

Replace four towers and foundations at St. Mary's River by February 28, 2025.

Place of Performance

*Ottawa *Ontario (except NCR) *National Capital Region (NCR) *Thunder Bay, CAN

Set-Aside

NONE

Documents

1

Solicitation 30005469: St. Mary’s River Tower Replacement

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Solicitation

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → FISHERIES AND OCEANS
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
PAUL FORTIERPoint of Contact

Full Description

Show more
Work under this Contract includes but is not limited to the provision of all labour, materials, and equipment required to: • Design of four [4] site specific concrete foundations for towers supplied by Canadian Coast Guard (CCG); • Supply and installation of four [4] concrete foundations as approved by CCG; • Installation of CCG supplied towers as per CCG provided drawings; • Demolition of four [4] existing skeleton style towers and concrete foundations. CCG Sailors Encampment and Stribling Point range towers are at the end of their lifecycle and are required to be replaced. Three [3] of the four [4] sites are accessible by land/vehicle and one [1] site is accessible by boat or helicopter. The exact coordinates of the sites are as follows: • Sailors Encampment LL5414 front range tower : 46°15'39.54"N, 84° 5'51.12"W • Sailors Encampment LL5415 rear range tower: 46°15'58.85"N, 84° 5'42.66"W • Stribling Point LL5416 front range tower: 46°18'47.00"N, 84° 6'55.43"W • Stribling Point LL5417 rear range tower: 46°18'37.43"N, 84° 6'13.47"W Under this contract, a site specific concrete foundation shall be designed and stamped by a Professional Engineer practicing within the Province of Ontario. Geotechnical reports and tower drawings will all be provided by CCG to the Contractor to assist in the design the site specific foundations. When the foundation design has been approved by CCG, the Contractor shall construct the foundations and erect CCG supplied ‘Quebec Towers’. Tower heights to be provided will be 40’, 45’, 70’, and 70’. Erection of the towers will also include the installation of their corresponding Daymarks. Daymarks will also be provided by CCG including the drawings of each Daymark to be installed. When new towers have been installed in their entirety, the Contractor shall then demolish the existing towers including their concrete foundations. All enquiries must be submitted in writing to the Contracting Authority no later than seven (7) calendar days before the bid closing date. Enquiries received after that time may not be answered. Work must be completed by February 28, 2025.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS