Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of Canada was posted on March 30, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

(Stage 2) - Powerhouse Structural Stabilization Project - Sault Ste. Marie Canal National Historic Site

Closed
5P468-23-0013/AInternational

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
CP25014
Solicitation # CP25014
Solicitation CP25014 is a unit price contract issued by the Port of Lake Charles (Lake Charles Harbor & Terminal District) for the Industrial Park East Rail Extension and Trans-loading Yard project located in Calcasieu Parish, Louisiana. The scope of work requires the contractor to provide all labor, materials, equipment, and supplies necessary to complete the project according to best industry practices and contract specifications. Key deliverables include mobilization, clearing and grubbing of 10 acres, drainage excavation, structural fill embankment, lime treatment of 37,000 square yards, and the installation of 602 linear feet of barbed wire fencing and double swinging driveway gates. The contract will be awarded to the lowest qualified bidder who complies with all requirements. Bidders must submit proposals by November 19, 2026, using the Louisiana Uniform Public Work Bid Form, ensuring every requested item has a unit price. The successful bidder must provide performance and payment bonds from an approved or A-rated Louisiana domiciled insurance company. Project administration includes a bi-monthly schedule update requirement and a retainage policy of 10 percent for contracts up to 500,000 dollars and 5 percent for those exceeding that amount. Compliance with the Clean Air Act, Federal Water Pollution Control Act, and Equal Opportunity clauses is required, with specific attention to FEMA assistance for subcontracts exceeding 150,000 dollars. Inspection and acceptance are managed by the Department, utilizing DOTD standards for earthwork and the International Roughness Index for concrete pavement.
Port of Lake Charles

POSTED

about 2 hours ago

DEADLINE

in 21 days
NAICS: 237990
New
SLED
Vernon Street Town Square Fountain Renovations
Solicitation # 13-201
The City of Roseville is soliciting lump sum bids for the renovation of the Vernon Street Town Square fountain and spray ground located in Roseville, California. The project scope includes limited demolition, the construction of a new balance tank, and the removal and replacement of below-grade piping. The contractor will be responsible for installing spray ground structures, surface finishes, and comprehensive mechanical and electrical systems. The base bid may be supplemented by two additive alternates: the installation of granite pavers instead of broom finished concrete and the use of specific colored concrete. Because the site will remain open to the public during construction, the contractor must coordinate site security and minimize impacts to public access. The contract will be awarded based on the Grand Total Bid Price, which includes the base bid and any selected alternates. Bidders must demonstrate a prerequisite experience with park projects of similar size and scope completed within the last three years. The work must be completed within 50 business days of the Notice to Proceed, with a detailed preliminary progress schedule due within 20 days and a Critical Path Method schedule due within 30 days. Payment is processed monthly with a five percent retention held by the City. Technical requirements include strict adherence to ASTM, NECA, NEMA, and UL standards, with specific labeling and marking requirements for electrical components. All materials must be delivered in original unopened containers and stored under cover. The contractor is required to provide a Public Works Faithful Performance Bond and a Labor and Materials Payment Bond, and must comply with California prevailing wage rates and OSHA safety regulations. Bids must be submitted under sealed cover, including all required proposal forms and a Project Qualifications/Experience Sheet, to be considered responsive.
City of Roseville

POSTED

about 5 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Agricultural INNOVATION Farm Project for San Marcos Unified SD
Solicitation # 2026-21
The San Marcos Unified School District is soliciting bids for the Agricultural INNOVATION Farm Project (Solicitation 2026-21) located at 99 Cassou Rd, San Marcos, California. The project scope involves the demolition of an abandoned electrical pole, water pump, and fencing, followed by the installation of underground water and electrical utilities, irrigation lines, a gravel service road, shade structures, storage containers, arbors, and designated planting areas. Work must be performed in strict accordance with the technical specifications, project drawings, and soil report. The estimated period of performance begins December 1, 2026, with a required completion date of April 1, 2027. The contract will be awarded to the lowest responsible bidder. Qualified bidders must hold a valid California Contractor's License and be registered with the California Department of Industrial Relations (DIR), as the project is subject to prevailing wage requirements. Submission requirements include a bid bond for 10 percent of the contract amount, a non-collusion declaration, and references, all submitted via the OpenGov e-procurement portal by November 2, 2026. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract value and adhere to a 3 percent Disabled Veteran Business Enterprise (DVBE) participation goal. All materials must be delivered in original packaging and comply with UL 969 marking and labeling standards.
Curriculum and Instruction

POSTED

about 16 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

Parks Canada is seeking a Prime General Contractor with heavy construction experience for the Powerhouse Structural Stabilization Project located at the Sault Ste. Marie Canal National Historic Site in Ontario. The project focuses on the structural stabilization of the Powerhouse, a Cultural Resource of National Significance, through the construction of a passive ground water management system. Key technical requirements include the partial removal of the penstock concrete reservoir and Historic Valve chamber, the construction of a new contemporary Valve Chamber, and the installation of two refurbished historic valves in their original positions. Additional work involves the supply and installation of a stainless Y-pipe system, new concrete works, the reconstruction of a wing wall stair, and various minor repairs within the Powerhouse building. This procurement is conducted as a two-stage selection process under solicitation number 5P468-23-0013/A. Following an initial qualification phase to evaluate supplier capabilities, the project has moved to the second stage, where only qualified suppliers are invited to submit financial bids based on provided specifications and drawings. Construction must be managed to ensure continued access for Parks Canada maintenance crews around the immediate area, excluding the defined construction zone. The solicitation process is managed by the Government of Canada, with bid submissions governed by specific security requirements and supplementary conditions outlined in the invitation to tender.

General Info

Parks Canada seeks a contractor for Powerhouse structural stabilization at Sault Ste. Marie Canal.

Place of Performance

*Ontario (except NCR), CAN

Set-Aside

NONE

Documents

2

5P468-23-0013/A - Power House Structural Stabilization Project

PDF, High priority: read this firstrfq
High

Parks Canada Invitation to Tender (ITT) - 5PXXX-XX-XXXX/X

PDF, High priority: read this firstitb
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Mar 16, 2023 to Apr 6, 2023. The notice title changed. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Parks Canada
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Sheldon LalondePoint of Contact

Full Description

Show more
Parks Canada requires a Prime General Contractor with Heavy Construction experience to construct a passive ground water management system that includes demolition, removals, construction, repairs as part of structural stabilization of Powerhouse, a Cultural Resource of National Significance, located at the City of Sault Ste Marie, Ontario and the Sault Ste Marie Canal National Historic Site of Canada.Construction work that involves partial removal of penstock concrete reservoir and Historic Valve chamber at the west side of Powerhouse building, Construction and installation of New contemporary Valve Chamber, Installation of two Historic Valves, refurbished by others, in the original position, supply and installation of stain less Y-pipe system, New concrete works and supply and installation of Passive Ground Water Management system, removal re-construction of wing wall stair at the south of Powerhouse Building and some minor removal and repair work in the Powerhouse Building among others is intended to proceed in a manner to accommodate continued access to the Parks Canada maintenance crew around the immediate area of work but in exception to the defined construction zone during construction.TWO STAGE SELECTION PROCESS This posting is the Stage Two of a two-stage solicitation process: the first stage was to evaluate the qualifications of all interested suppliers. The second stage (Stage Two) is to invite the qualified suppliers to provide a financial bid on the project based on the specifications and drawings. Only qualified suppliers have been invited to bid.

More opportunities from Government of Canada → Parks Canada

Same awarding agency

NAICS: 541690
International
Request for Supply Arrangement - Accessibility Assessment Consultants – Parks Canada – Nationally
Solicitation # 5P047-21-0068
Parks Canada Agency is establishing a national Supply Arrangement (SA) under solicitation 5P047-21-0068 to create a pool of qualified accessibility assessment consultants. This initiative supports the agency's commitment to inclusivity and the mandate of the Accessible Canada Act (2019) to ensure all places are fully accessible by 2040. The SA has no defined end date and will remain valid as long as it is advantageous for the government. Once a minimum of three suppliers are qualified, contracts will be awarded for accessibility assessments across various regions of Canada, with individual contract values typically ranging from 1,000 to 500,000 dollars. Qualified consultants will be required to perform indoor and outdoor audits, incorporating a wide spectrum of user needs. Deliverables include written reports with annotated photographs, data spreadsheets with recommendations, and final presentations to site teams. The selection process is based on a minimum point rating of 70, with mandatory pass/fail criteria regarding cover letters and organizational experience. Rated factors include the project manager's experience, the firm's audit project history, and the proposed methodology. Future task solicitations under this arrangement will be categorized into four tiers based on value, ranging from under 10,000 dollars to over 100,000 dollars. Submissions must be sent exclusively via email to [email hidden] as attachments, with a maximum file size of 15 megabytes per email. Bids submitted via fax, courier, or in-person will not be accepted. Project managers must demonstrate at least three years of accessibility assessment experience. While the arrangement covers most national sites, specific procurements within CLCA areas in Yukon, Northwest Territories, Nunavut, Quebec, or Labrador must be handled separately. There are no security requirements for this arrangement, though suppliers must comply with integrity provisions and the Federal Contractors Program for Employment Equity.
Other Scientific and Technical Consulting Services

POSTED

about 2 months ago

DEADLINE

in about 73 years
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS