Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Energy was posted on July 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Steel Erection and Structural Assembly

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238120
New
International
Provision of Structural Repairs and Planned Maintenance to Blackpool Tower Winter 2026/7 and Summer 2027
Solicitation # ocds-h6vhtk-078f6c
Blackpool Borough Council is seeking a qualified Remedial Works Supplier to perform structural repairs and planned maintenance for the Blackpool Tower. The project is divided into three primary phases: the Winter Works 2026/27 package occurring during operational closure from November 2026 to March 2027, the Summer Works 2027 package during the operating season from April 2027 to November 2027, and subsequent ad-hoc maintenance based on annual inspections beyond November 2027. The estimated total value of the contract is 4,000,000 GBP including VAT, with a potential option to extend for one year into 2028. The contract is an open competition particularly suitable for small and medium-sized enterprises, with an award based on a 10% weighting for social value. Mandatory requirements for bidders include professional indemnity insurance of 5 million GBP and employer's and public liability insurance of 10 million GBP each. Technical qualifications are strictly enforced, requiring IRATA level 3 supervisors, IRATA level 1 or 2 technicians, and project managers who are Chartered Members of the Institution of Civil Engineers or the Institution of Structural Engineers. All work must comply with BS EN 1090 Execution Class 3, the Construction Design and Management Regulations 2015, and UK GDPR. Tenders must be submitted electronically by November 13, 2026.
Blackpool Borough Council

POSTED

about 2 hours ago

DEADLINE

in 23 days
NAICS: 238120
New
SLED
Corpyard Phase II Connex Structural Anchoring & Welding: (Rebid)
Solicitation # 26-091-ITB
The City of West Sacramento has issued solicitation 26-091-ITB for the Corpyard Phase II project, which requires the structural anchoring and welding of 14 existing shipping containers to a cement-treated asphalt surface. The scope of work includes container pre-checks, drilling and hole cleaning, the installation of Bolthold asphalt substrate, bolting down ASTMA36 plates using epoxied steel rods, and performing AWS welding to secure the plates to the container framing. To prevent corrosion, the contractor must apply a zinc-rich cold galvanizing rust-inhibiting coating. All work must be performed by a licensed contractor holding a current California C-51 or C-60 license and must adhere to PSE stamped drawings, structural calculations, and standards including ASCE 7-22, CBC 2022, and AISC 360-16. Final acceptance is contingent upon a successful inspection by the City's Building department. The estimated project value is 35,000 dollars, and the contract will be awarded to the lowest responsive and responsible bidder. Bids must be submitted electronically via the OpenGov portal by November 10, 2026, at 1:00 pm, and must include a bid security of at least 10 percent of the total bid price. The successful bidder is required to provide performance and payment bonds equal to 100 percent of the contract price and must comply with California prevailing wage requirements and DIR registration. Additionally, the contractor must utilize the Virtual Project Manager system for submittals and maintain comprehensive insurance coverage, including Commercial General Liability and Workers Compensation. As a federal-aid construction project, the contract mandates strict adherence to FHWA-1273 provisions, including nondiscrimination and equal employment opportunity policies.
Capital Projects - Construction

POSTED

about 7 hours ago

DEADLINE

in 13 days

AI Contract Overview

Show more

The contract titled Steel Erection and Structural Assembly pertains to the installation of steel structures using cranes and power equipment, likely for transmission towers or similar support frameworks within the Western Sierra Nevada Region. It is classified as a subcontract under NAICS code 238120, which corresponds to structural steel erection services, indicating the work involves assembling and securing heavy steel components at elevated or remote locations. The solicitation was posted on July 24, 2026, with a response deadline of August 4, 2026, giving potential bidders approximately two weeks to prepare and submit proposals. The work is being managed by the Department of Energy under its Western Sierra Nevada Region office, though specific location details for performance or contact information are not provided in the data. The contract has no set-aside designation, meaning it is open to all eligible subcontractors without preference based on business size or other classifications. Bidders must coordinate with the federal contracting system via the FedConnect portal to access full documentation and submit responses.

General Info

Steel erection subcontract for DOE in Western Sierra Nevada, open to all bidders, due August 4, 2026.

NAICS

238120 - Structural Steel and Precast Concrete Contractors

Place of Performance

Not specified

Set-Aside

NONE

Documents

This scope was carved out of 89503326QWA000398.

The full solicitation package (16 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

COTP RIVER CROSSING TOWER PAINTING PROJECT

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Western Sierra Nevada Region
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Erection of steel structures using cranes and power equipment, likely involving transmission towers or support frameworks.

More opportunities from Department Of Energy → Western Sierra Nevada Region

Same awarding agency

NAICS: 237130
Federal
COTP Series Capacitor Two-Phase Design Build
Solicitation # 89503326RWA000049
The California Oregon Transmission Project (COTP) Series Capacitor Bank Replacement is a firm-fixed-price, two-phase design-build construction project issued by the U.S. Department of Energy, Western Area Power Administration (WAPA). With an estimated magnitude exceeding $80 million, the project involves the engineering, procurement, and construction of four 525kV series capacitor banks at the Maxwell, Tracy, Olinda South, and Olinda North substations. The scope includes the installation of capacitor banks, live tank circuit breakers, disconnect switches, MOVs, and associated control systems, as well as the demolition and construction of foundations and platforms. The project is scheduled for completion by June 30, 2033, with a proposal deadline extended to November 13, 2026. The procurement follows a best-value source selection process divided into two phases. Phase I focuses on qualifications, evaluating corporate experience, technical competency, and past performance to shortlist up to five offerors. Phase II involves a detailed technical and price proposal, where factors such as organization, key personnel, technical solution, and price are assessed. Key contract requirements include strict adherence to Buy American standards, cybersecurity approvals for network-interfacing equipment, and compliance with prevailing wage determinations for Colusa, Shasta, and Alameda counties. Financial terms include progress payments for mobilization and preparatory work, while liquidated damages are established for delays in returning capacitor banks to service. Security protocols require comprehensive background checks for all personnel and specific data cards for foreign nationals.
Power and Communication Line and Related Structures Construction

POSTED

9 days ago

DEADLINE

in 16 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS