Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

STEM,FLUID VALVE

Active
N0010426QFC92Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract is for the procurement of a STEM, FLUID VALVE designated as SPECIAL EMPHASIS material (Level I) due to its critical role in a shipboard system where failure could result in catastrophic consequences including loss of life, ship, or vital systems. The material must strictly conform to NAVSEA drawings 5959302 and 5959311 and comply with a comprehensive set of military and international standards including MIL-DTL-24252, MIL-STD-2132, MIL-STD-792, ISO 9001, ISO 10012, ISO/IEC 17025, and ANSI/ASQ Z1.4. All components, particularly the stem made from MIL-DTL-24252 Composition I, Condition CA-7, require precise chemical and mechanical analysis with full traceability from raw material through every manufacturing step to final assembly, with mandatory marking of traceability identifiers on all parts. No weld repairs are permitted, and mercury or mercury-containing compounds are strictly prohibited. The contractor must maintain a qualified quality system aligned with ISO 9001 and either MIL-I-45208 or ANSI/NCSL Z540.3 with ISO 17025, subject to government audit at any time. All certification data, including test results for dye penetrant inspection and other nondestructive evaluations, must be submitted electronically via Wide Area Workflow (WAWF) to Portsmouth Naval Shipyard (DODAAC N50286) for review and acceptance prior to any shipment, with strict deadlines: certification submissions 20 days before delivery and PNSY review within 30 working days. Final delivery of all material is due no later than 365 days after contract effective date. Certification documents must be 100% complete, legible, and positively state full compliance with all requirements—no disclaimers are allowed. Electronic signatures are accepted if properly controlled and uniquely attributable to the signer. Traceability markings must be permanently affixed in accordance with MIL-STD-792, and for items with limited surface area, a durable tag must be securely attached. The procurement is a total small business set-aside and requires compliance with Buy American and foreign trade agreement certifications. Access to Naval Nuclear Propulsion Information (NNPI) and NOFORN data is mandatory for all personnel handling drawings or technical data; contractors must

General Info

Supply of 1.5-inch hull valve stem meeting Navy specs, strict quality, inspection, and delivery protocols.

Agency

Department Of Defense → Navsup Weapon Systems Support MechView Agency

NAICS

332919 - Other Metal Valve and Pipe Fitting ManufacturingView NAICS

Place of Performance

PA

Set-Aside

NONE

Documents

(1)

N0010426QFC92_0001.PDF

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseSolicitation
Posted

Solicitation

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support Mech
Contacts1 person available
OfficeMECHANICSBURG, PA, 17050-0788, USA
Organization / Agency
Department Of Defense → Navsup Weapon Systems Support Mech
View Agency Profile
Office AddressMECHANICSBURG, PA, 17050-0788, USA

Full Description

Show more
CONTACT INFORMATION|4|N743.55|WVC|N/A|NATHANIEL.VENTURA.MIL@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|See specification sections C and E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| GENERAL INFORMATION-FOB-DESTINATION|1|A| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |N/A|TBD|N00104|TBD|N39040 - Certifications, S4306A - Material |N50286|TBD|133.2|N/A|N/A|N39040 - Certifications|N/A| N/A|SEE DD FORM 1423 |PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| This solicitation's offer end date has been adjusted to 31 July 2026, 1500 Eastern Time zone. \ This amendment extends this solicitation to 20 MAY 2026 due to delay in delivery of drawings. All else unchanged. IMPORTANT - The following remark is added: This requirement requires access to NOFORN and/or Naval Nuclear Propulsion Information. See local text WSSTERMHZ12 for further information. If you wish to obtain a copy of the drawings, please download the security agreement form from SAM.gov and email the completed, signed form to nathaniel.ventura.mil@us.navy.mil. WSSTERMHZ12 is hereby incorporated. The Solicitation close date is changed to 01 MAY 2026. All else unchanged and in full effect. \ 1.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 2. Portsmouth NSY's DODAAC has changed from N00102 to N50286. Any reference toN00102 within this order should be updated to N50286. 3. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed here in. 4. The following proposed delivery schedule applies: Submission of Certification Data CDRLs will be on or before 20 days prior to scheduled delivery. PNSY review/acceptance of Certification CDRLs 30 working days after receipt of Certification DD 1423 CDRLs. Final delivery of material will be on or before 365 days after effective date of the resulting contract. 5. Any contract awarded as a result of this solicitation will be a DO rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). 6. If drawings are included in the solicitation, access needs to be requested on the individual solicitation page on Contracts Opportunities on the Government's SAM.gov website. After requesting access, send an email to the Primary POC listed on the solicitation. \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.2.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.3 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. DRAWING DATA=5959302 |53711| B| |D| | | | DRAWING DATA=5959311 |53711| C| |D| | | | DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |230223|A| |01| DOCUMENT REF DATA=MIL-STD-2132 | | |D |080310|F| |01| DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-DTL-24252 | | |E |061108|F| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A|1 | | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | 3. REQUIREMENTS 3.1 ;Stem for size 1 1/2-inch hull and backup ball valve must be in accordance with NAVSEA drawing803-5959302, item 8, except as amplified or modified herein.; 3.2 ;The original melter, melter/converter and converter of MIL-DTL-24252 material must bequalified in accordance with paragraph 3.2.6 of MIL-DTL-24252.; 3.3 ;No weld repair allowed on MIL-DTL-24252 material.; 3.4 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Stem; Material - ;MIL-DTL-24252, composition I, condition CA-7; 3.5 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings and specifications is still required, but certifications are only required as listed below. Test - Dye Penetrant Inspection Item - ;Stem, final external surface; Performance - MIL-STD-2132 Acceptance - MIL-DTL-24252 3.6 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.6.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. 3.7 O-ring grooves and mating sealing surfaces must be inspected per the contractually invoked drawings or specifications. When the drawings or specifications do not provide specific defect criteria or state that no defects are allowed, the General Acceptance Criteria (GAC) standard must be used for inspecting O-ring grooves and mating sealing surfaces only. Repairs to sealing surfaces and O-ring grooves with unacceptable defects may be accomplished within the limits of the size and tolerances provided in the applicable drawing. Repairs thatwould exceed these limits require approval (including final dimensions). The data that is red lined (crossed out) is excluded from the GAC for this contract and is not to be used for acceptance or rejection criteria. The GAC document is identified as Contract Support Library Reference Number CSD008 at https://register.nslc.navy.mil/ 3.8 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.8.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.8.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.8.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.9 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.10 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.11 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer. 3.12 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-4 3.12.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.12.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.12.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement. 3.12.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.12.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption. 3.13 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected. 3.13.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.13.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.14 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.14.1 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document. 3.14.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract. 3.14.3 The prime contractor must ensure that the purchased product conformsto specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the purchased product on the end item represented by this contract. 3.14.4 The prime contractor must evaluate the requirements of the contractand select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be established. Records of this effort must be available for review by the government. 3.14.5 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier. 3.15 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.15.1 Visual examination upon receipt to detect damage during transit. 3.15.2 Inspection for completeness and proper type. 3.15.3 Verification of material quality received. 3.15.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.15.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.15.6 Identification and protection from improper use or disposition. 3.15.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.15.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.15.9 Material returned to the contractor must be handled as GFM. 3.16 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3, Section C of this contract/purchase order. 3.16.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that implement the material control requirements stated herein and elsewhere in this Contract/Purchase Order. 3.17 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number, as applicable, which must also be marked on the material. This traceability marking on the material must provide direct traceability to the material's chemical composition and mechanical properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples must be taken no less than once in every eight hours of operation for the purpose of validating proper chemical composition and mechanical properties. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.17.1 Material Marking for Traceability and Identification - The following are the minimum marking requirements. Additional/alternate marking requirements, if applicable, will be specified elsewhere in the contract/purchase order. In addition to the marking requirements on applicable drawings and/or specifications, marking for traceability is required. All traceability markings must be permanently applied in accordance with MIL-STD-792 (except as specified below). An alternate marking method is permissible provided it is an available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this contract/purchase order and differs from that specified in the specification or drawing. 3.17.2 Traceability markings for items with precision machined or plated surfaces, or material with suitable marking surface areas less than 3/8 inches square (either 3/8" x 3/8" or an area equal to 0.1406 inches square) must be applied to a durable tag and the tag securely affixed to the material. 3.17.3 Marking must be legible and must be located so as to not affect the form, fit, and function of the material. ;Marking area to be as shown on drawing 5959302.; 3.18 See CDRL DI-MISC-81020 (Chemical and Mechanical) - Material Certification - In addition to the certification data requirements specified in DI-MISC-81020, the following material certification requirements apply: 3.18.1 Quantitative chemical and mechanical analysis of material traceable to traceability markings is required. Material certification test reports must include the class, form, condition, grade, type, finish, and/or composition, as applicable, of the material supplied. 3.18.2 Re-identification and re-certification of material is required when the material is subjected to a process which alters it's properties. If the starting material or raw stock is processed in a manner that will not affect its chemical composition or mechanical properties, the original certifications for the chemical composition and mechanical properties, as required by the material specification, are acceptable. Re-certification of the chemical or mechanical properties is required if a process is used during fabrication that alters the original properties of the material (e.g. alloying, heat treating, or forming). In these instances, the properties of the material must be re-determined and documented to reflect the altered condition. The altered material must be uniquely re-identified with a new traceability number. The properties thus determined and documented, are required for final certification and must conform to the material specification or the contract/purchase order requirements. When only the mechanical properties are altered, the original certification forchemical composition must be overstamped and annotated with the unique traceability marking used with the altered material and at a minimum contain the information below. 3.18.3 Material certification data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and contract requirements. Transcription of certification data is prohibited. 3.18.4 ELECTRONIC SIGNATURES. 3.18.5 Electronic signatures on Level I certification documents are consideredequivalent to handwritten signatures. 3.18.6 Suppliers that use electronic signatures to authenticate company certifications and reports must ensure that process is controlled and unique to the individual signing the document. The signer must take a distinct action to electronically sign the document 3.18.7 Suppliers must develop one method of authentication to be provided at the time of signature. The authentication method must be based on something known only to the signer (e.g., a password) or based on something only the signer possesses (e.g., a card or other device). 3.18.8 Electronic signature applications must not allow unauthorized users tochange electronically signed documents or records. All changes to electronically signed documents or records made by authorized users must be revision- or date-controlled, must identify the person making the change, and must clearly reflect that the document or record has been revised. 3.18.9 The prime contractor, as a minimum, must flow down the electronic signature requirements to their sub-tier suppliers and sub-contractors that provide electronically signed company certifications and reports to ensure that they have a procedure to control and identify unique processes for only allowing authorized individuals to sign documents. 3.18.10 Statements on material certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.18.11 If material is received without the required certification papers or with incorrect/missing data on the certification papers, the material will be rejected. 3.18.12 Revisions of OQE must be provided by the originating organization and must include a description of the data modified along with the proper signature requirements herein. 3.18.13 In cases of foreign certification, conversion of foreign language unitsof measure and properties measured into U.S. units of measure must be annotated on the furnished foreign certifications, if space permits, or placed on an addendum in the same format as the foreign certification data. Such conversion must be identified as to origin with name, title, and signature of the authorized representative of the company making the conversion. 3.18.14 The certification data requirements contained in this appendix must beinvoked on the prime contractor who must delegate these requirements to all sub-tier contractors supplying Level I material. 3.19 Material Handling - The written material control process must include the following: 3.19.1 All raw materials must have traceability markings (except as specified below). 3.19.2 Stored raw materials requiring traceability must be segregated to preclude intermingling with materials not requiring traceability. 3.19.3 When traceability markings will be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of heats/lots or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. 3.19.4 Brazing or weld filler metals for strength welds forming or integral with pressure containing components or assemblies requiring traceability must be verified to be the correct material, and type or grade, as applicable, prior to consumption. At a minimum, material verification must consist of inspection of material test reports for conformance to specified requirements. Control of welding and brazing filler metals must be maintained to the point of consumption to assure use of the correct type and grade. Markings and traceability requirements do not apply to brazing and weld filler metals after consumption. It is the responsibility of the prime contractor to ensure conformance with the above requirements on welds performed by their subcontractors. 3.19.5 Purchase orders for raw material must specify that the material be traceable to material certification test reports by traceability markings on the material and identified on the test reports. The certification data requirements contained in DI-MISC-81020 must be invoked by the prime contractor on all subcontractors supplying Level I material. 3.19.6 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.20 Receiving inspection - 3.20.1 Products and services produced by sub-tier suppliers for incorporation in the contract end item must be subject to inspection or audit at the time of receipt by the prime prior to further processing within the prime contractor's plant or shipment to another location. 3.20.2 Receiving Inspection must include as a minimum - Verification that the traceability marking on the material agrees with that on the certification test reports. Verification that certification test reports are legible and complete. Verification that the contents of the certification test reports are in compliance with the contractually invoked specifications and requirements. 3.21 Discrepancy reporting - 3.21.1 Nonconforming products from sub-tier suppliers must be identified and processed in accordance with the prime contractor's procedures for controlling nonconforming products. The prime contractor must report the receipt of any nonconforming products to the responsible sub-tier supplier in accordance with established procedures. Nonconforming material records must be maintained and available for review by the government Quality Assurance Representative (QAR). 3.22 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance. 3.22.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size). SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot. 3.22.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the Government/Navy Receipt Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above. 3.22.3 All data concerning material verification (chemical, mechanical or physical properties), traceability (material certifications to material marking), and nondestructive test (NDT) certifications for material must be 100% inspected. The certification test reports must also be 100% inspected for completeness and legibility. 3.22.4 All material requiring traceability must be 100% inspected for traceability marking and that the marking is legible. 3.23 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information: 1. Contractor's name, address and date. 2. The contract/purchase order number (for example: N00104-11-P-FA12) 3. The National Stock Number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC (for example: 1H 4820 012345678 L1) ("N/A" when Not Applicable). 4. Lubricants, sealants, anti-seize, and/or thread locking compounds ("N/A" when Not Applicable). 5. Certification that O-rings, packing, gaskets, or other elastomeric products were installed in a compressed state within an assembly or sub-assembly, prior to expiration of the shelf life ("N/A" when Not Applicable). 6. Manufacturer's compound number ("N/A" when Not Applicable). 7. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable). 8. A statement to the effect that all items furnished on this contract are in full compliance with the specifications and requirements and list each contractually invoked conformance/compliance test performed by name and that it was performed satisfactorily. 9. Contractor's or authorized personnel's signature. 4. QUALITY ASSURANCE 4.1 Notes to DCMA QAR and the Contractor - 4.1.1 DCMA QAR and the Contractor for proprietary designs - Departures from Contractor imposed requirements, not specifically covered by the contract, must be judged individually on the basis of the effect, if any, on contractual requirements. When there is a disagreement between the Contractor and the Government representative as to the effect on contractual requirements, the departure must be considered a nonconformance and be submitted to the PCO for disposition. 4.1.2 DCMA QAR and the Contractor for proprietary designs - All records of departures from Contractor imposed requirements must be maintained and available for review at the Contractor's facility. A copy must be given to the local Government representative. A record of these departures, traceable to the applicablepart number and contract number must be submitted to the PCO. 4.1.3 DCMA QAR and the Contractor for proprietary designs - For proprietary designs, the contractor's part numbers are acceptable for reference only. The delivered material must conform to all drawings, specifications, and other contractual requirements. 4.1.4 DCMA QAR - It is the responsibility of DCMA QAR to review Non-Destructive Testing (NDT) procedures for NAVSUP Contracts/Purchase Orders. 4.1.5 DCMA QAR and the Contractor - The ECDS (Electronic Contractor Data Submission) system is available for certain data submissions and to submit questions and clarifications, and waiver requests on Contracts and Solicitations. ECDS can be found at: https://register.nslc.navy.mil/ 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Several definitions of terms that apply to CSI items are listed below. All terms may not apply to every item. 6.1.1 The ECDS (Electronic Contractor Data Submission) system is at: https://register.nslc.navy.mil/ This application will require advance registration using a PKI Digital Certificate on a CAC. A Vendor User Guide is available as CSD001 in the CSD (Contract Support Document) Library within ECDS. 6.1.2 Critical Safety Item (CSI) - Any ship part, assembly, or support equipment containing a critical characteristic whose failure, malfunction, or absence of which could cause a catastrophic or critical failure resulting in loss of, or serious damage to the ship, or unacceptable risk of personal injury or loss of life. 6.1.3 Critical Process - As determined by the TWH, any process, operation or action performed on a Ship CSI that serves to establish a critical characteristic (such as welding, soldering, machining, polishing, cleaning, or assembling) or confirm that a critical characteristic is within drawing or specification compliance (such as, testing, measurement, or non-destructive evaluation). 6.1.4 First Article - Pre-production models, initial product samples, test samples produced to ensure a manufacturer's capability to meet full specification requirements. 6.1.5 First Article Test (FAT) - Contractually required testing and inspection of a supplier's pre-production, production, or "production representative" specimens to evaluate a manufacturer's ability to produce conforming product prior to the Government's commitment to receive subsequent production items. First Article Testing is product specific and does not assess manufacturing process controls nor does it assure the effectiveness of the manufacturer's quality program. 6.1.6 Government Source Inspection (GSI) - GSI is independent oversight performed by a government representative usually a DCMA Quality Assurance Representative (QAR)) to assure that those unique product quality and system elements, identified by the Contracting Agency as important, are observed and evaluated. 6.1.7 Quality Assurance Letter of Instruction (QALI) - A QALI is a formal document initiated by a contracting activity that provides essential requirements and instructions for contracted materials to be independently verified and accepted by a government representative prior to shipment. 6.1.8 Objective Quality Evidence (OQE) - The quantitative and qualitative data of all mechanical, chemical, and performance tests performed (as required by the applicable specification, drawing, or purchase document) to prove that the material supplied conforms to the specified requirements. 6.1.9 Surface Discontinuity - Any surface irregularity, marking, or localized change in physical character of the surface, other than dimensional, that exists infrequently at one or several places. (Examples: burrs, dents, nicks, scratches, gouges, pits, center-punches, scribes, and tool marks) Surface discontinuities less than 0.005-inch in depth are acceptable provided they do not violate any other design requirements specified in this Contract/Purchase Order. 6.1.10 Traceability Code - A code or number providing traceability to the actual chemical and mechanical properties of the specified heat, batch, or form from which the material originated. 6.1.11 Verification - An examination performed to determine compliance with a specific requirement. 6.1.12 Nonconformance - A nonconformance is defined as affecting or violating the following: - The requirements of this contract/purchase order. - Contractually invoked drawings (i.e. envelope dimensions, interface dimensions with mating parts/equipment, center of gravity, weights, piece part identification, material, etc.). - Contractually invoked federal, military, or commercial specifications and/or standards. - Form, fit, function, performance to contract requirements, reliability, maintainability, interchangeability, safety of personnel or equipment, or additional cost to the Government. 6.1.13 Waiver - A written authorization to accept an item, which during manufacture, or after having been submitted for Government inspection or acceptance, is found to depart from specified requirements, but nevertheless is considered suitable for use as is or after repair by an approved method. 6.1.14 Deviation - A specific written authorization (granted prior to the manufacture of an item) to depart from a particular requirement(s) of an item's current approved configuration documentation for a specific number of units or a specified period of time, and to accept an item which is found to depart from specified requirements, but nevertheless is considered suitable for use "as is" or after repair by an approved method. 6.1.15 Critical Waiver/Deviation - This waiver/deviation consists of a departure involving safety. 6.1.16 Major Waiver/Deviation - This waiver/deviation consists of a departure involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, or Durability of the item or its repair parts - Health or Safety - Effective Use or Operation - Weight, Stability, or Structural Integrity - System design parameters as schematics, flows, pressures or temperatures - Compartment arrangements or assigned function 6.1.17 Minor Waiver/Deviation - This waiver/deviation consists of a departure which does not involve any of the factors listed as critical or major. 6.1.18 Engineering Change (EC) - A change to the current approved configuration documentation of a configuration item at any point in the life cycle of the item. 6.1.19 Engineering Change Proposal (ECP) - A proposed Engineering Change and the documentation by which the change is described, justified, and submitted to the Government for approval or disapproval. 6.1.20 Class I ECP - A class I ECP is approved by the Government's Configuration Control Board and authorized with a contract modification. 6.1.21 Class II ECP - A class II change is typically reviewed for concurrence in classification by the local government representative, unless otherwise specified elsewhere in the contract/purchase order. 6.2 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVSUP-WSS Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue: Commanding Officer NAVSUP-WSS Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Commanding Officer NAVSUP-WSS Code 1 Support Branch 700 Robbins Avenue Philadelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS. 6.3 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information contained on those documents and drawings. 6.3.1 There are 7 (seven) separate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows: A... approved for public release; distribution is unlimited. B... distribution authorized to US Governments agencies only. C... distribution authorized to US Government agencies and their contractors. D... distribution authorized to DoD and DoD contractors only. E... distribution authorized to DoD Components only. F... further distribution only as directed by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical data in accordance with OPNAVINST 5510.161. 6.4 Recent Updates - A short description of recent updates to the technical requirements of this item are listed below, along with an implementation date for each issue. The notes below are only a generic quick reference and are provided for convenience only, detailed requirements will be defined elsewhere in the technical sections of this Contract/Purchase Order. ;10/20/2016 - Updated ECDS URL Feb 26 2009 - Clarified testing and certs only apply to pieces listed Oct 29 2010 - Added Sampling Std for LI In-Process testing Dec 20 2022 - Removed requirement for vender to submit Waivers/Deviations in EC Jan 05 2012 - Added WAWF to forward Approved Waivers/Deviations with final OQE Dec 17 2011 - Moved Quality Assurance Text location for Readability Apr 15 2009 - Clarified the sample size for large and small lot sizes Jan 19 2011 - Added notification of DCMA upon contract award May 02 2009 - Added Lubricants and Sealants to the C of C Aug 27 2014 - Took out contractor's phone number requirement Dec 01 2011 - Moved "Notes to DCMA QAR" to QA Section Jan 5 2017 - ECDS/CSD info was added to Definitions in the Notes section.; DATE OF FIRST SUBMISSION=ASREQ Paragraph 10.4 of DI-QCIC-81110 does not apply. DATE OF FIRST SUBMISSION=ASREQ Block 12 - Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow). Enter in WAWF as follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: PORT_PTNH_WAWF_Notification@navy.mil No material is to be shipped prior to the receipt of Acceptance. DATE OF FIRST SUBMISSION=ASREQ Block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, and 10.3 of DI-MISC-80678 do not apply. Block 12 - Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow). Enter in WAWF as follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: PORT_PTNH_WAWF_Notification@navy.mil No material is to be shipped prior to the receipt of Acceptance. DATE OF FIRST SUBMISSION=ASREQ Block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, and 10.4 of DI-MISC-80678 do not apply. Block 12 - Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow). Enter in WAWF as follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: PORT_PTNH_WAWF_Notification@navy.mil No material is to be shipped prior to the receipt of Acceptance.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Defense → Navsup Weapon Systems Support Mech

Same awarding agency

NAICS: 332722
New
Federal
1HM 5305 016429505 D4, SCREW,CAP,SOCKET HE
Solicitation # N00104-26-Q-FD54
This solicitation, N00104-26-Q-FD54, is a Total Small Business Set-Aside for the procurement of a socket cap screw with NSN 1HM 5305-01-642-9505 D4, issued by the Naval Supply Systems Command Weapon Systems Support based in Mechanicsburg, Pennsylvania. The solicitation is strictly reserved for small businesses as defined under FAR 19.5, with mandatory compliance to clauses including 52.219-28 for post-award small business rerepresentation and 52.219-6 for notification of the set-aside. Offerors must maintain active SAM registration with a valid UEI and CAGE code, and are subject to representation requirements regarding socioeconomic status, including WOSB, 8(a), HUBZone, and service-disabled veteran-owned categories, with affirmative responses triggering additional reporting obligations. The contract structure is implied to be fixed-price, supported by clauses such as 52.243-1 for changes and 52.249-14 for excusable delays, while prompt payment and electronic funds transfer are mandated through 52.232-25 and 52.232-33. Packaging and marking must strictly follow MIL-STD-2073-1 and MIL-STD-129, with specific requirements for barrier materials, preservation levels, and DLR labeling per MIL-PRF-61002. All items require Unique Item Identification encoded per ISO/IEC standards using Data Matrix barcodes, and ESD-sensitive components must comply with ANSI/ESD S20.20-2021. Deliveries are to be made FOB destination to the primary performance location at 5450 Carlisle Pike, Mechanicsburg, PA, with a maximum delivery window of 200 days from award. Inspection and acceptance may occur at origin or destination, as determined by the contracting officer, with zero-defect criteria and 100% inspection of objective quality evidence required, governed by ANSI/ASQ Z1.4 and ISO 9001. Compliance with military specifications such as FF-S-86, MIL-STD-792, and EB Specs is mandatory, and contractor quality systems must support traceability, nonconformance reporting, and corrective actions. The award will be made to the offeror most
Bolt, Nut, Screw, Rivet, and Washer Manufacturing

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 334412
New
Federal
CIRCUIT CARD ASSEMB
Solicitation # N0010426QQC17
This contract pertains to the repair of CIRCUIT CARD ASSEMBLY under Emergency Acquisition Authority, issued via a Basic Ordering Agreement (BOA) with terms incorporated by reference, where any conflict between the order and the BOA favours the BOA. The work requires adherence to strict technical standards including MIL-STD-130 Rev N for marking, and all repairs must conform to the original manufacturer's specifications, drawings, and approved procedures. The Contractor is responsible for all inspection and quality assurance activities, with records required to be maintained for 365 days after final delivery. Government Source Inspection is mandatory, and compliance is non-negotiable—defective or non-conforming items will not be accepted regardless of sampling results. The Repair Turnaround Time (RTAT) is set at 730 days, measured from physical receipt of the asset at the contractor’s facility as recorded in the Commercial Asset Visibility system, with acceleration encouraged. All freight is FOB Origin, and the Navy manages logistics via CAV. The contract is a firm-fixed-price arrangement with a mandatory requirement for the contractor to quote the full RTAT or provide capacity constraints if unable to meet it. Pricing must be justified, especially if new or higher than historical values, with documentation of prior commercial sales or comparable NSNs required. If the item is deemed beyond repair, a negotiated testing and evaluation fee may apply. The Government retains the option to increase quantities within one year post-award at the original contract unit price. The awardee must be an authorized distributor of the original manufacturer, with written proof submitted. Cybersecurity maturity certification, Buy American requirements, Small Business Subcontracting Plan, and Security Prohibitions under Deviation 2026-O0025 are all applicable. Items must be packaged per MIL-STD-2073, and access to controlled technical documents requires certification for distribution codes such as C, D, E, or F. Performance location and inspection CAGE codes must be clearly provided, and all responses must be received by August 20, 2026, with bilateral acceptance required before contract execution.
Bare Printed Circuit Board Manufacturing

POSTED

1 day ago

DEADLINE

in 2 months
View Details
NAICS: 332919
New
Federal
ADAPTER ASSY
Solicitation # N0010426QBY09
This contract pertains to the procurement of an ADAPTER ASSY under solicitation N0010426QBY09, issued by the Naval Supply Systems Command Weapon Systems Support Mechanical division, with a response deadline of July 23, 2026. The solicitation mandates strict compliance with a range of technical, quality, and procedural requirements outlined in the Individual Repair Part Ordering Data (IRPOD), which is mandatory for vendor review and forms the cornerstone of technical specifications. All contractual documents, including drawings, specifications, and technical data, must be obtained from the BPMI e-Commerce site under password-protected access, and distribution of certain materials is strictly controlled as NOFORN, requiring prior approval from Naval Sea Systems Command for any transmission to foreign entities. The contract enforces a defined order of precedence for resolving conflicts among technical documents, with amendments and the schedule taking highest priority followed by the IRPOD, drawings, and referenced standards. Contractors must adhere to the exact revision levels of cited documents and seek formal approval before using alternate revisions or proposing deviations, particularly for critical repair parts, where non-conformance must be justified with technical data demonstrating no impact on form, fit, or function. Quality assurance is governed by the IRPOD, requiring contractors to maintain an inspection system acceptable to the government and retain complete records throughout contract performance. Packaging requirements are dictated by MIL-PRF-23199 and related standards, with specific rules for the use of heat-sealed envelopes for cleanliness-controlled parts and explicit exclusion of mercury and fire-retardant materials. Transportation is governed by sea transport protocols, and payment instructions mandate the use of Wide Area Workflow for invoice and receiving report submission. The contract requires two critical pre-award submissions: a procedure package per DI-QCIC-8871 within 45 days after award and a certified test and inspection report package per DI-QCIC-8872 by the end of contract performance, each submitted separately per unique contract and NSN combinations. Pricing is valid for 60 days post-close, and all contractual documents are deemed issued upon electronic transmission. The solicitation is a total small business set-aside, and compliance with cybersecurity maturity certification and government-wide security prohibitions is required. Vendors must also provide accurate DD Form 1423 data items with proper blocking and pricing group classifications, and all deliverables must comply with government distribution statement controls to ensure proper safeguarding of technical data.
Other Metal Valve and Pipe Fitting Manufacturing

POSTED

1 day ago

DEADLINE

in 28 days
View Details
NAICS: 332919
New
Federal
48--VALVE, HULL/BACKUP
Solicitation # N0010426RNC68
This contract pertains to the procurement of a 2-inch combination hull and backup ball valve designated as SPECIAL EMPHASIS material (Level I, Scope of Certification) due to its critical role in a shipboard system, where failure could result in serious injury, loss of life, or loss of the vessel. The valve must conform strictly to Naval Sea Systems Command drawing 6408529 and other referenced drawings, with specific dimensional and material requirements detailed for each component, including stems, nuts, seats, and balls. Material specifications are highly restrictive, requiring certified alloys such as UNS N05500 and UNS 96400, with mandatory heat treatment, mechanical and chemical testing, and traceability from raw stock to finished part. Non-metallic components like seats must be sourced exclusively from Mearthane Products Inc. and meet exact physical properties for hardness, tensile strength, and water absorption. All materials must be traceable through unique batch, heat, or lot numbers permanently marked on the components, with strict controls on welding, brazing, radiography, and nondestructive testing procedures per MIL-STD-2035, SAE-AMS-6931, and T9074-AS-GIB-010/271 standards. Quality assurance is centralized under ISO-9001 or MIL-I-45208, with mandatory Government inspection at source, full certification submission for all tests, and 100% verification of traceability, material certification, and NDT results prior to shipment. The contractor must hold a valid U.S. security clearance of Confidential or higher due to access to classified documents, including the confidential drawing 6404016. Performance is governed by emergency acquisition flexibilities, with a bilateral award requiring formal contractor acceptance. All deliverables must comply with Buy American and small business subcontracting mandates, and the valve must be free of mercury and prohibit the use of molybdenum disulfide lubricants. The contract enforces rigorous configuration control, requiring engineering change proposals for any modifications and strict waiver procedures submitted via the ECDS system. Packaging and shipping must follow FOB-destination terms, with payment processed via Wide Area Workflow using standardized receiving reports. Warranty coverage is one year from delivery, and all items require a Certificate of Compliance certifying conformance to every technical specification, drawing, and clause. A detailed 100% inspection regime applies to all traceable components, certifications
Other Metal Valve and Pipe Fitting Manufacturing

POSTED

1 day ago

DEADLINE

in 29 days
View Details
NAICS: 334412
New
Federal
59--CIRCUIT CARD ASSEMB
Solicitation # N0010426QYAEQ
This contract pertains to the manufacture and delivery of a CIRCUIT CARD ASSEMBLY under solicitation N0010426QYAEQ, issued by the Department of Defense through NAVSUP Weapon Systems Support in Mechanicsburg, PA. The requirement is governed by a fixed-price structure with strict compliance mandates, including adherence to MIL-STD-129, MIL-STD-130 for marking, MIL-I-45208 for inspection quality systems, and ISO9001 as an acceptable alternative. The contractor must ensure the product is mercury-free and free from contamination, with any intentional use of mercury requiring prior written approval and specific labeling. Electrostatic discharge controls must conform to ANSI/ESD S20.20, and any design, material, or part number changes must be notified and approved through a formal code-based change process. The contractor is responsible for all inspection duties and must maintain full documentation for four years post-delivery. The contract includes a one-year warranty from delivery date, a 365-day option to increase quantity by up to 100% at the original price, and mandatory compliance with Buy American and Defense Priorities and Allocations System (DPAS) requirements, making it a rated order for national defense. Contractors must be authorized distributors of the original equipment manufacturer and provide proof of authorization. Compliance with cybersecurity maturity certification, veteran and disability equal opportunity provisions, and prohibition of child labor in supply chains is required. All contractual documents are deemed issued upon electronic transmission, and acceptance requires bilateral agreement. Packaging must follow MIL-STD-2073, and distribution of attached documents is restricted under specified DoD distribution statements, with NOFORN and Official Use Only materials requiring formal certification requests. The solicitation response deadline is August 24, 2026, and delivery is expected to support submarine and surface ship systems.
Bare Printed Circuit Board Manufacturing

POSTED

1 day ago

DEADLINE

in 28 days
View Details
NAICS: 332919
New
Federal
STEM, VALVE
Solicitation # N0010426QNC95
This contract pertains to the supply of a stem for a 2-inch ball valve designated as SPECIAL EMPHASIS material (Level I/SUBSAFE), critical to shipboard systems where failure could lead to catastrophic outcomes including loss of life or vessel. The item must strictly conform to NAVSEA drawing 801-6408529 and referenced specifications including QQ-N-286 for material composition, MIL-STD-792 for marking, MIL-STD-1622 for cleaning, and T9074-AS-GIB-010/271 for ultrasonic inspection. Weld repair is prohibited on QQ-N-286 material, and all components must maintain traceability from raw material through final assembly via unique heat-lot markings applied per MIL-STD-792, with exceptions for small surfaces requiring durable tags. Chemical and mechanical testing must be performed on the stem and any starting material over 4 inches in dimension, with results certified by approved labs including Huntington Alloys, Metallurgical Consultants, and Naval Surface Warfare Center Carderock. Electronic signatures are accepted for certifications, provided they are uniquely controlled and auditable, and all certifications must include positive, unqualified statements of compliance without disclaimers. The contractor must maintain an ISO-9001 or MIL-I-45208 quality system with calibration aligned to ISO-10012 or ANSI-Z540.3, subject to government inspection at source. All sub-tier suppliers must be vetted for capability and performance, with quality requirements flowed down and monitored through audits. Receiving inspection requires 100% verification of traceability, certification completeness, and dimensional compliance per ANSI/ASQ Z1.4, with zero defects allowed in final lot acceptance. Certifications for each shipment must be electronically submitted via WAWF to Portsmouth Naval Shipyard, with strict "Ship to," "Inspect by," and "Accept by" codes, and no material may be shipped until written acceptance is received. Configuration control is paramount; any deviations or engineering changes must be formally proposed and approved by the Contracting Officer, with class I changes requiring a formal ECP that includes lifecycle cost impacts and logistic effects. The contract mandates mercury-free materials, prohibits marking of material with designators except fasteners, and requires full adherence to Buy American and Small Business Program requirements. All documentation must be submitted through ECDS, and government representatives have full rights to audit, inspect, and reject non
Other Metal Valve and Pipe Fitting Manufacturing

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 332919
New
Federal
STEM,FLUID VALVE
Solicitation # N0010426QNC93
This contract pertains to the procurement of a stem assembly for a size 6-inch ball valve, designated as SPECIAL EMPHASIS material (Level I/SUBSAFE), intended for critical shipboard systems where failure could lead to catastrophic consequences including loss of life or the vessel. The item must strictly conform to Naval Sea Systems Command drawings 803-4384678 and 803-4384681, along with referenced specifications such as QQ-N-286 for material composition and MIL-STD-2035 for inspection criteria. All components, particularly the stem (Piece 82), require rigorous chemical and mechanical certification traceable to unique heat-lot identifiers marked directly on the part or on a durable tag if surface area is insufficient. Material must be free of mercury, and no weld repair is permitted on QQ-N-286 material. Testing, including dye penetrant and ultrasonic inspection, must be performed by approved laboratories and documented with fully compliant, unqualified certification reports. Electronic signatures are accepted but must be uniquely controlled and authenticated. The contractor must maintain a certified quality system compliant with ISO-9001, ISO-10012, and ISO/IEC 17025, or alternatively MIL-I-45208 and MIL-STD-45662, subject to government audit at any time. Traceability must be preserved throughout the entire manufacturing and supply chain process, including all subcontractors, with strict procedures for handling, storage, and re-marking if original markings are removed during processing. All certifications, inspection records, and test data must be submitted via the Wide Area Work Flow system to the Portsmouth Naval Shipyard for review and explicit acceptance prior to shipment; no material may be shipped before acceptance. The contract mandates zero-defect acceptance under ANSI/ASQ Z1.4 sampling standards and requires compliance with Buy American and Small Business Subcontracting Plan provisions. Engineering changes must be formally proposed via ECPs, and all waivers or deviations require Contracting Officer approval. The procurement is issued under Emergency Acquisition Flexibilities, is DO-certified under the Defense Priorities and Allocations System, and requires bilateral acceptance. All documentation must be submitted through ECDS, with specific formatting, submission channels, and government acceptance authorities clearly outlined for compliance.
Other Metal Valve and Pipe Fitting Manufacturing

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 333613
New
Federal
ROD, PUSH
Solicitation # N0010426QFF18
The contract involves the supply of a push rod designated as SPECIAL EMPHASIS material (Level I/SUBSAFE) for use in a critical shipboard system, where failure could result in catastrophic consequences including loss of life or vessel. The item must strictly comply with NAVSEA drawing 7614787 and material specification QQ-N-286, hot finished and age hardened with a Brinell hardness of 265–320, with welding explicitly prohibited on this material. All components require comprehensive certification including quantitative chemical and mechanical analysis, ultrasonic inspection of starting material, and slow strain rate tensile testing conducted only by designated laboratories. Traceability is mandatory from raw material through final assembly, requiring permanent, legible markings on each part linked to certified test reports, with batch sampling every eight hours during production. Electronic signatures are accepted on certification documents, provided they are uniquely controlled, authenticated, and tamper-evident. No disclaimers are permitted—certifications must be positive and unqualified. All suppliers must maintain an ISO-9001 quality system with calibration control per ISO-10012 or ANSI-Z540.3 and ISO-17025, subject to government audit at any time prior to and during production. Government Quality Assurance is performed at source, and all subcontractors must be vetted and monitored for compliance. Each shipment requires submission of certification data via WAWF to Portsmouth Naval Shipyard (DODAAC N50286), with inspection and acceptance handled by N39040 and notification sent to PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL; no material may be shipped without prior acceptance. Final delivery must occur within 365 days of contract effective date, with early or incremental delivery allowed at no additional cost. The contract strictly prohibits mercury-containing materials, mandates configuration control through Engineering Change Proposals for any modifications, and requires 100% inspection of traceability, certification data, and nondestructive test results. Only suppliers with an approved Quality Control Manual are eligible, and the solicitation is set aside for small businesses under a total small business set-aside, with Buy American and DPAS priority rating requirements in effect.
Mechanical Power Transmission Equipment Manufacturing

POSTED

1 day ago

DEADLINE

in 13 days
View Details
NAICS: 334290
New
Federal
COMMUNICATIONS CONT
Solicitation # N0010426QTB90
This contract concerns the repair of COMMUNICATIONS CONT equipment under solicitation N0010426QTB90, with a required Repair Turnaround Time (RTAT) of 170 days measured from the physical receipt of the asset at the contractor’s facility as recorded in the Commercial Asset Visibility (CAV) system. The contract mandates strict adherence to technical standards including MIL-STD-130 for marking, compliance with manufacturer specifications, and performance under a firm-fixed-price structure. All repairs must be conducted in accordance with approved technical documentation and government-approved procedures, with no substitutions permitted without prior written approval from the NAVICP-MECH Contracting Officer. The government requires independent inspection and final acceptance of all repaired items, with records maintained for at least 365 days post-final delivery. Freight is FOB Origin, and the Navy manages all logistics via the CAV system. Failure to meet the RTAT triggers a per-unit, per-month price reduction, with a defined maximum cap, and may lead to termination for default, though excusable delays such as government-caused postponements are exempted. The contract includes several mandatory clauses covering cybersecurity maturity certification, Buy American compliance, small business subcontracting requirements, and the mandatory use of Workflow Pro’s Assist Module for invoicing and receiving. The award will be bilateral, requiring the contractor’s written acceptance before execution, and the government reserves the right to exercise an option for increased quantities within 365 days. Only authorized distributors of the original manufacturer may submit offers, and proof of authorization must accompany proposals. All technical documents provided by the Navy include distribution statements that dictate access and dissemination limits, and contractors must comply with security prohibitions and export control regulations. The contracting officer is Alison E. Harper, and all correspondence, quotes, and submissions must reference the specified RMA details, CAGE codes, unit pricing, and RTAT, with final delivery expected to meet the Government’s standard of quality and timeliness.
Other Communications Equipment Manufacturing

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 332919
New
Federal
ELBOWS
Solicitation # N0010426QFF05
This contract pertains to the procurement of elbows designated as SPECIAL EMPHASIS material (Level I) for use in critical shipboard systems, where failure could result in catastrophic consequences including loss of life or vessel. The components must strictly conform to NAVSEA drawing 4687601 and associated specifications, including SAE-AMS-QQ-S-763 Class 304 Condition A material with mandatory chemical and mechanical analysis. All items require traceability from raw material through final fabrication, with unique heat-lot markings permanently affixed to each part, and certification documentation that is fully traceable, unqualified, and submitted prior to delivery. The contract mandates adherence to rigorous quality systems based on ISO-9001, ISO-10012, and ISO/IEC 17025, with mandatory Government Quality Assurance at source, including inspections by DCMA representatives. Delivery must occur within 365 days of contract effective date, with certification data submitted 20 days prior to delivery and reviewed over 30 working days. Welding, brazing, and fabrication must follow S9074-AQ-GIB-010/248 or S9074-AR-GIB-010A/278, requiring prior submission and approval of procedures and welder qualifications. All welds, especially those involving titanium or hardfacing, demand specific documentation and chemical verification. Subcontractors are subject to the same standards, and the prime contractor must ensure compliance throughout the supply chain. Final acceptance requires 100% inspection of certification records, traceability markings, and nondestructive test results with zero defect tolerance for lot acceptance. The contract is a total small business set-aside, subject to Buy American and DPAS DX rating for national defense priority, with mandatory use of WAWF for payment and receiving reports, and ECDS for all submissions and waiver requests. Delivery is FOB destination, with compliance to MIL-STD-2073 for packaging and marking, and all materials must be mercury-free.
Other Metal Valve and Pipe Fitting Manufacturing

POSTED

1 day ago

DEADLINE

in 13 days
View Details