Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of Energy was posted on June 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Storage Ring (SR) Direct Current Transducers (DCCT) Modules

Closed
MG-05212026Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The University of California, acting on behalf of the Lawrence Berkeley National Laboratory (LBNL), is soliciting proposals under RFP No. MG-05212026 for the procurement of nine hundred ten (910) custom Direct Current Transducer (DCCT) modules for the Advanced Light Source Upgrade (ALS-U) Storage Ring. This solicitation is designated as a Total Small Business Set-Aside under FAR 19.5, restricted to small businesses meeting the NAICS code 334418 (Printed Circuit Assembly Manufacturing) with a size standard of 750 or fewer employees. The contract type is firm fixed price, and the deliverables include fully assembled DCCT-BPC-2CH modules delivered in seven batches between September 2026 and February 2027, with the seventh batch including ten spare units. All items must comply with stringent technical specifications outlined in supporting documents including AL-1752-7072, AL-1752-7073, AL-1752-7143, AL-1752-7178, and the Acceptance Criteria List AL-1876-8204, and must meet quality standards such as ISO-9001, IPC/J-STD Class 2, and IPC 610 Class 2. Each module must undergo rigorous inspection and testing, with objective records retained for LBNL review, and all electrical components must be NRTL-listed per 29 CFR 1910. Proposals are due by 3:00 PM Pacific Time on June 19, 2026, and must be submitted via email to mggrausz@lbl.gov in either MS Word, Excel, or PDF format, structured into three volumes: a cover letter, a technical volume containing the ALS-U quality evaluation survey and past performance forms, and a business volume including representations and certifications, along with a firm fixed price schedule. Offerors must complete mandatory certifications addressing small business status, Buy American Act compliance, export controls, biobased materials, and debarment status, and must demonstrate their ability to meet pass/fail technical gates related to technical compliance, delivery schedule adherence, past performance on similar projects, and quality assurance practices. Packaging must adhere to sustainability requirements including ESD-compliance, minimization of single-use plastics, use of recycled or certified compostable materials

General Info

University of California seeks small business proposals for DCCT modules by June 19, 2026, Berkeley.

Agency

Department Of Energy → Berkeley National Labor - DOE ContractorView Agency

NAICS

334418 - Printed Circuit Assembly (Electronic Assembly) ManufacturingView NAICS

Place of Performance

Berkeley, CA, 94720, USA

Set-Aside

SBA

Documents

(15)

AL-1752-7072_LT-EL-SR-PS-CTP-6302-01_REV-C.zip

ZIP

Representation and Certification Form for RFP MG-05212026

DOCXrep-certification-form

Response to Questions 1 - RFP MG 052122026

PDFq-and-a

Response to Questions 2 - RFP MG 05212026

PDFq-and-a

AL-1752-7178B Contract Document

PDFother

AL-1752-7073_LT-EL-SR-PS-CTP-6302-02_REV-C.zip

ZIP

AL-1752-7584D Magnet Power Supply Specifications Note

PDFnote

Price Proposal Schedule Attachment A - RFP MG-05212026

XLSXprice-proposal-schedule

Subcontract MG-05212026 for DCCT Modules ALS-U Power Supply

PDFcontract-document

Procurement Control Drawing 40-19062AM-dcct Revision B

PDFprocurement-control-drawing

General Provisions for Commercial Supplies and Services

PDF7 pagescontract-document

Past Performance Reference Information Form Attachment B

DOCXpast-performance

AL-1852-0746 Statement of Work for DCCT Module Production

PDFsow

RFP MG-05212026 Storage Ring DCCT Modules

PDFrfp

AL-1876-8204A Acceptance Criteria List for ALS-U SR DCCT-Module

PDFacceptance-criteria-list

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Berkeley National Labor - DOE Contractor
Contacts1 person available
OfficeBerkeley, CA, 94720, USA
Organization / Agency
Department Of Energy → Berkeley National Labor - DOE Contractor
View Agency Profile
Office AddressBerkeley, CA, 94720, USA

Full Description

Show more

Dear Prospective Offeror,

Please see attached answers to the 2nd set of questions referring to this request for proposal.

Thank you,


Dear Prospective Offeror,

Please see attached answers to the 1st set of questions referring to this request for proposal.

Thank you,


Dear Prospective Offeror:


The University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in the Request for Proposal (RFP) No. MG-05212026, Storage Ring (SR) Direct Current Transducers (DCCT) Modules.



We request that all prospective suppliers acknowledge receipt of this notice and indicate whether they intend to submit a proposal by May 26, 2026.

If your company does not intend to submit a proposal, please still acknowledge receipt of this notice and provide a brief explanation for the no-bid.



The RFP and associated documents (listed below) are attached to this message. The documents are associated with the email address receiving this notification. If this is not the correct email address, please notify me.

RFP documents include:


  •     RFP and Proposal Instructions
  •     Sample Subcontract and its incorporated documents
  •     SOW
  •     General Provisions Commercial Supplies & Services, dated 12/12/25 
  •     Price Proposal Schedule Attachment A
  •     Past Performance Reference Information Form Attachment B
  •     Representations & Certification
  •     Quality Evaluation Survey   

TIMELINE OF EVENTS

Release RFP – May 21, 2026



Offeror Questions Due - June 5, 2026, 3:00 PM Pacific Time - submit via email to mggrausz@lbl.gov

Proposals Due - June 19 2026, 3:00 PM Pacific Time - submit via email to mggrausz@lbl.gov

More opportunities from Department Of Energy → Berkeley National Labor - DOE Contractor

Same awarding agency

NAICS: 334516
New
Federal
Beamline 4.3.1 Monochromator system
Solicitation # JG-0909-26
Lawrence Berkeley National Laboratory is issuing a Request for Information under solicitation JG-0909-26 to identify potential providers for a high-stability X-ray monochromator system for Beamline 4.3.1 at the Advanced Light Source. The system is intended to support a broad scientific program in small- and wide-angle X-ray scattering, with optimized performance required at 10 keV and 17 keV. Key technical requirements include a double-multilayer monochromator baseline with an energy bandwidth of approximately 1 percent, a Si(111) crystal monochromator for higher resolution over 10 to 17 keV, and the integration of cryo-cooling for the first multilayer to manage thermal distortions. The system must also comply with strict facility vacuum, space, and radiation safety standards. This is a presolicitation effort to gather data on technical feasibility, budgetary costs, and delivery schedules, with a project magnitude estimated between 500,000 and 600,000 dollars. Interested respondents must complete the RFI form sections 1 through 5 by October 16, 2026. The anticipated timeline includes a formal Request for Proposal in winter-spring 2027, with final system delivery expected by December 2028. Evaluation of responses will focus on achievable performance, system complexity, and the ability to conduct comprehensive Factory Acceptance Testing regarding optical, mechanical, and environmental stability prior to delivery and commissioning at the Berkeley, California facility.
Analytical Laboratory Instrument Manufacturing

POSTED

3 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS