Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Storefront Window Installation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Ascension Parish Schools involves the removal of existing wood windows and the installation of new aluminum storefront frames, glazing, and wall infills for various facility projects. The scope of work includes selective demolition and the delivery of installed storefront windows to support prime contractors. The solicitation was posted on November 19, 2026, with a response deadline of December 17, 2026. The project falls under NAICS code 238150 and there is no specified set-aside status for this opportunity.

General Info

Subcontract for removing wood windows and installing aluminum storefronts for Ascension Parish Schools.

Place of Performance

LA, USA

Set-Aside

NONE

Documents

This scope was carved out of SB-10994.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

SB-10994_ST. AMANT HIGH SCHOOL ROOF REPLACEMENT PHASE II (GOLD DOME RESTORATION)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 28 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 2 documents on the prime contractFrom SB-10994_ST. AMANT HIGH SCHOOL ROOF REPLACEMENT PHASE II (GOLD DOME RESTORATION)
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyLouisiana → Ascension Parish Schools
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Removes existing wood windows and installs new storefront windows for prime contractors on Ascension Parish Schools facility projects. Performs selective demolition of wood windows and installs aluminum storefront frames and glazing. Delivers installed storefront windows and wall infills.

Similar Contracts

Same NAICS industry code

NAICS: 238150
New
Three Double Pane Glass replacements units 2
Solicitation # three-double-pane-glass-replacements-units-2
Human Learning Systems dba Quentin Burdick Job Corps is soliciting bids for a subcontracting opportunity to replace three double-pane glass units at the Quentin N. Burdick Job Corps Center in Minot, North Dakota. The scope of work includes the removal and installation of one insulated glass unit and two fire-rated insulated glass units for the Male Dormitory and Recreation Center. The contractor must provide all necessary labor, materials, and equipment to ensure the units are securely sealed, weather-tight, and compliant with applicable building codes and fire-rating certifications. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Qualified bidders must possess a current North Dakota contractor's license and maintain a minimum of $1M in General Liability and Workers Compensation insurance. Proposals must be submitted via the provided bid sheet by December 4, 2026, at 4:00pm CST. The contract requires compliance with the Service Contract Act (SCA) and various FAR clauses, including certifications regarding debarment and anti-lobbying. Awardees must provide a minimum one-year workmanship warranty and a 30-day follow-up period at no additional charge. Payment terms are Net 30 following service completion verification and receipt of invoice.
Human Learning Systems dba Quentin Burdick Job Corps

POSTED

about 2 hours ago

DEADLINE

in 15 days
View Details
NAICS: 238150
New
SLED
WGB Window Replacement | BWC270493 | FY27 | JD
Solicitation # SRC0000043024
This project involves the removal and replacement of seven existing windows with broken seals at the William Green Building located at 30 West Spring St., Columbus, OH. The contractor is responsible for providing all labor, materials, and equipment, ensuring all work complies with OSHA 29 CFR 1926, Ohio Safety Regulations, and building policies. Key deliverables include a Site-Specific Safety Plan (SSSP), full site assessments to identify fall and electrical hazards, and the installation of new window units with proper anchoring, waterproofing, and insulation. Quality control requires field testing for air leakage and water infiltration, and the project concludes with a final walkthrough to confirm the removal of all hazards. The contract requires a mandatory site visit on December 2, 2026, and all proposals must be submitted via OhioBuys. Bidders must be registered with OhioBuys and have a payee/supplier ID. Required documentation includes a completed IRS form W-9, a Contractor/Subcontractor Affirmation and Disclosure Form, and an Affirmative Action Program Verification Form for contracts valued at $5,000 or more. The successful bidder must provide manufacturer warranties for the window units and a one-year installation workmanship warranty. Award will be granted to the lowest responsive and responsible bidder.
Bur Of Workers' Compensation

POSTED

about 20 hours ago

DEADLINE

in 18 days
View Details
NAICS: 238150
New
SLED
Project #26001-6 On Demand Window Repair Services
Solicitation # 26001-6
The Clackamas County Housing Authority is soliciting on-demand window repair services for residential units and administration offices located throughout Clackamas County, spanning from Estacada to Wilsonville. The contractor is responsible for providing all materials, labor, and fuel, and must coordinate directly with tenants. Performance timelines are strictly defined, with 10 calendar days allowed for routine work and 5 calendar days for urgent or emergency repairs. Upon completion, the contractor must date stamp the window or bead. The award will be granted to the responsible prospective contractor whose offer is most advantageous to the agency, considering cost and other specified factors. The contract requires strict adherence to local, state, and federal regulations, including HUD procurement and wage requirements. Contractors must pay straight-time prevailing wages as defined by the Maintenance Wage Rate Determination for Non-Routine Maintenance and comply with the Contract Work Hours and Safety Standards Act. Key administrative requirements include maintaining general liability, pollution environmental impairment, and lead pollution liability insurance for at least five years post-completion, and certifying compliance with state tax laws for the preceding six years. Additionally, the contractor must certify their business size and socioeconomic status, including whether they are a small business, women-owned, or a minority enterprise.
Clackamas County Housing Authority

POSTED

1 day ago

DEADLINE

in 13 days
View Details
NAICS: 238150
New
SLED
Facilities Management General Window Film Services
Solicitation # 2026-MPW-275
Solicitation 2026-MPW-275 is a request for professional interior and exterior window film services for various County-owned or operated facilities in Washington. The scope of work includes surface preparation, custom graphics fabrication, structural film application, and post-installation warranty cleanings, with a requirement for the contractor to provide on-call and urgent repair services. Specific deliverables include the installation of Type D standard security/safety film (minimum 8 mils) and Type E heavy security/blast film (15 mil and up). All work is managed via individual Work Orders issued by the County Project Manager and must comply with the Americans with Disabilities Act, the International Building Code, and RCW 39.12 prevailing wage requirements. This is a unit-price contract where the award is granted to the responsible bidder with the lowest responsive bid. Bidders must submit a signed bid form, qualification information, and a responsibility detail form by December 4, 2026, at 1:00 PM. Financial requirements include a 5% bid bond and a 100% payment and performance bond based on the contract's not-to-exceed amount. The contractor is responsible for all quality assurance and must coordinate inspections with the County, providing three days' notice prior to testing. There is no set-aside status specified for this solicitation.
Procurement and Contract Services

POSTED

1 day ago

DEADLINE

in 15 days
View Details

More opportunities from Louisiana → Ascension Parish Schools

Same awarding agency

NAICS: 238160
New
SLED
SB-10994_ST. AMANT HIGH SCHOOL ROOF REPLACEMENT PHASE II (GOLD DOME RESTORATION)
Solicitation # SB-10994
The St. Amant High School Roof Replacement Phase II (Gold Dome Restoration) is a construction project managed by the Ascension Parish Schools in Louisiana. The scope of work includes the restoration of the gold dome, applying a custom-colored silicone roof coating to a specific dry film thickness, repainting the building exterior, performing interior touch-up painting, and replacing wood windows with new storefront windows or wall infill. Additionally, the project involves installing doors for large equipment passage into the gym area and paving a portion of an existing grass area. The contract is governed by the AIA Document A201-2017 General Conditions of the Contract for Construction and requires a manufacturer's 10-year warranty for the roof coating. The solicitation was posted on November 19, 2026, with a response deadline of December 17, 2026, and a mandatory pre-bid conference scheduled for December 8, 2026. Award determination is based on the lowest bidder, calculated as the sum of the base bid and any accepted alternates. Bidders must provide a bid security of at least 5% of the base bid and all additive alternates. Required documentation includes a non-collusion affidavit, E-Verify affidavit, and a contractor's attestation clause. There is no set-aside status specified for this contract.
Roofing Contractors

POSTED

about 2 hours ago

DEADLINE

in 28 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS