Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Storm Drain and Erosion Control

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the San Bernardino County Department of Public Works involves the installation of storm drains and the implementation of erosion control measures. The scope of work includes installing drainage pipes and inlets, placing rock slope lining, and setting up silt fences and erosion barriers to deliver a completed storm drain system and stabilized slopes. Interested parties must be DIR registered and provide a comprehensive Erosion Control Plan. The solicitation was posted on August 18, 2026, with a response deadline of September 17, 2026. This opportunity falls under NAICS code 238910 and is intended for those working as subcontractors for prime contractors on county projects.

General Info

Subcontract for San Bernardino storm drain installation and erosion control; deadline September 17, 2026.

Agency

California → San Bernardino County Department of Public WorksView Agency

NAICS

238910 - Site Preparation ContractorsView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of H14278.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Baker Boulevard Over Mojave River Bridge Replacement

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Bernardino County Department of Public Works
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → San Bernardino County Department of Public Works
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs storm drains and implements erosion control measures for prime contractors on San Bernardino County Department of Public Works projects. Installs drainage pipes and inlets, places rock slope lining (riprap), and installs silt fences and erosion barriers. Requires an Erosion Control Plan and DIR registration. Delivers a completed storm drain system and stabilized slopes.

Similar Contracts

Same NAICS industry code

More opportunities from California → San Bernardino County Department of Public Works

Same awarding agency

NAICS: 237310
SLED
Baker Boulevard Over Mojave River Bridge Replacement
Solicitation # H14278
The San Bernardino County Department of Public Works is soliciting bids for the Baker Boulevard Over Mojave River Bridge Replacement project, identified as Work Order H14278. The project involves the demolition of an existing two-lane, 22-span timber bridge and its replacement with a new four-lane, 10-span cast-in-place reinforced concrete slab structure founded on cast-in-drilled hole piles. The comprehensive scope of work includes roadway approach modifications, bridge approach slabs, curb, gutter, and sidewalk improvements, highway lighting, channel rock slope lining, storm drains, and erosion control. Technical execution must adhere to the Caltrans 2025 Standard Specifications and Plans, with specific requirements for the use of ASTM A955 stainless steel reinforcement and 316L stainless steel tie wire. The contract will be awarded to the responsive and responsible bidder offering the lowest total bid price. Bidders must submit their proposals by 10:00 A.M. on September 17, 2026, via the San Bernardino County Electronic Procurement Network or physical delivery, with a required 10 percent bid bond submitted in a separately sealed envelope. Performance is expected to commence within 55 days of contract approval. Key compliance requirements include adherence to federal and state prevailing wage rates, submission of a subcontractor list prior to award, and certification of eligibility regarding debarment and lobbying. The project is supported by a geotechnical foundation report from Earth Mechanics, Inc., and includes specific deliverables such as a lead compliance plan, quality control program, and erosion control plan.
Highway, Street, and Bridge Construction

POSTED

24 days ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS