Storm Drain System Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This subcontract for the California Fish and Wildlife Region 3 Bay Delta office in Fairfield involves the installation of a storm drain system designed to manage runoff and prevent erosion into Bean Creek. The scope of work includes the installation of two drop inlets, 18 feet of piping, a T-style end, and an RSP gravel filter outfall. The project is categorized under NAICS code 238910 and was posted on August 21, 2025. Further project details and documentation can be accessed through the provided CEQAnet link.
General Info
Agency
Place of Performance
CASet-Aside
Documents
This scope was carved out of EPIMS-SCR-35548-R3.
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
Glenwood Cutoff Road 0.02 Storm Damage Repair Project (Notification of Lake or Streambed Alteration, No. EPIMS-SCR-35548-R3)
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Earlier notices in this NAICS code
Posted before this notice, open and closed
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
