This Government Contract opportunity from Massachusetts was posted on June 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Storm Drainage and Utility Work
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the installation or upgrade of subsurface drainage systems designed to manage water flow beneath and around the track, including the provision and installation of perforated pipe, catch basins, and French drains. This work is essential to prevent water accumulation, protect infrastructure integrity, and ensure safe and functional track conditions under varying weather conditions. The project falls under NAICS code 237110, indicating it is categorized as water and sewer line and related structures construction, and is designated as a subcontract opportunity within the Massachusetts Parks & Recreation Department’s portfolio. The solicitation was posted on June 22, 2026, with a response deadline of July 9, 2026, at 5:00 PM, providing interested parties approximately three weeks to prepare and submit proposals. While the exact location of performance is not specified in the provided data, the work is tied to facilities administered by the Massachusetts Parks & Recreation Department. The contract does not indicate any set-aside provisions or specific eligibility requirements beyond the subcontract classification, and no point of contact details are included for inquiries. Interested contractors must ensure compliance with technical specifications for subsurface drainage systems and coordinate with existing infrastructure during execution.
General Info
Agency
NAICS
Place of Performance
MA, USASet-Aside
Documents
This scope was carved out of BD-27-1142-30000-300-130607.
The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.
IFB - IMPROVEMENTS TO EAST BOSTON MEMORIAL STADIUM TRACK
AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
