Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Pennsylvania was posted on June 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Storm Sewer Installation & Excavation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is seeking MBE, DBE, and WBE subcontractors and suppliers for a targeted green-street retrofit project in downtown Romney, West Virginia. The project involves the construction of approximately 343.59 linear feet of South Marsham Street between Gravel Lane and US Route 50. The scope of work includes the installation of 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and necessary drainage, underdrain, inlet, pipe, tie-in, and downspout work. Additionally, the project requires limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor, as well as the planting of six native trees and approximately 345 native plants. The goal is to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area, concluding with final stabilization, cleanup, and restoration. This solicitation is open to various small business concerns, including veteran-owned, service-disabled veteran-owned, HUBZone, disadvantaged, woman-owned, and minority-owned businesses. To accommodate the project scale, these entities are encouraged to form consortiums if individual bid items are too large for a single firm to handle. Bids must be submitted by September 17, 2026, at 4:00 P.M. Interested parties should contact Jonah Leith or Jennifer Wilson for further details and must provide a response indicating their intent to bid.
Harbel, Inc.

POSTED

about 14 hours ago

DEADLINE

in 4 days
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project requires the installation of various large-diameter valves, including contractor-furnished units and Metropolitan-furnished 54-inch and 132-inch valves, as well as 54-inch and 145.5-inch diameter tie-ins. Additional construction elements include four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and associated piping systems. Civil works requirements encompass the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. Issued by James W. Fowler Co., the solicitation is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and woman business enterprises. The bid response deadline is September 29, 2026. The prime contractor is actively seeking subcontractor pricing and encourages the participation of minority, women, and disadvantaged firms, offering assistance with bonding, insurance, and equipment procurement to maximize M/W/DBE involvement. The project also encourages the utilization of apprentices. All work must be performed according to the plans and specifications provided on the James W. Fowler website.
James W. Fowler Co.

POSTED

about 14 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The contract entails the installation of 382 linear feet of 36-inch storm sewer piping, encompassing all necessary excavation, proper bedding, backfilling, and compaction procedures to ensure structural integrity and long-term performance. The scope also includes the installation of inlets and seamless connections to existing stormwater systems, requiring precise alignment and integration to maintain hydraulic efficiency. Additional work involves saw cutting of paved surfaces and full restoration of affected areas to original condition, ensuring minimal disruption and compliance with municipal standards. All work must adhere to engineered specifications and local regulations governing infrastructure development. This subcontract is issued by Lebanon County in Pennsylvania under NAICS code 237110 for public infrastructure improvement. The opportunity was posted on June 22, 2026, with a response deadline of July 31, 2026, allowing interested parties sufficient time to prepare proposals. The place of performance is within Lebanon County, though specific location details are not provided. There is no set-aside designation and no point of contact listed, indicating bidders must review the full solicitation on the provided PennBid platform for complete terms, conditions, and submission guidelines.

General Info

Install 382 linear feet of 36-inch storm sewer with inlets, backfill, restoration, and compliance in Lebanon County, PA.

Agency

Pennsylvania → Lebanon CountyView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Lebanon County, PA, USA

Set-Aside

NONE

Documents

This scope was carved out of 029-24-005.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

N. Weaber Street Storm Sewer Improvements

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Lebanon County
ContactsNo contacts available
OfficeN/A
Organization / Agency
Pennsylvania → Lebanon County
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Install 382 linear feet of 36-inch storm sewer piping, including excavation, bedding, backfill, compaction, inlets, and connections to existing systems. Includes saw cutting and restoration work.

More opportunities from Pennsylvania → Lebanon County

Same awarding agency

NAICS: 237110
SLED
Public Water System Upgrade Project
Solicitation # Fredericksburg Sewer & Water Authority, Lebanon County
The Fredericksburg Sewer & Water Authority is soliciting sealed proposals via the PennBid program for the Public Water System Upgrade Project, with a submission deadline of 2:00 p.m. on Monday, October 5, 2026. The project is divided into five prime contracts: Pipeline Construction (Contract 1), General Construction (Contract 2), Electrical Construction (Contract 3), Plumbing Construction (Contract 4), and HVAC Construction (Contract 5). The scope includes the construction of a manganese filter building, rehabilitation of office and garage facilities, installation of process and chemical feed equipment, and the development of two new groundwater wells alongside modifications to three existing wells. A mandatory pre-bid conference for bidders of Contract No. 2 will be held at 9:00 a.m. on September 16, 2026, at the project site. Proposals must be submitted on a unit price basis and accompanied by a bid security of ten percent of the bid total via a bank cashier's check or bid bond. The project is subject to the Davis-Bacon Act, requiring the payment of prevailing wage rates and the submission of weekly certified payroll. Additionally, the project must comply with Build America, Buy America (BABA) requirements and Title VI of the Civil Rights Act of 1964. The successful contractor must provide performance and payment bonds and insurance upon execution of the agreement. The project timeline specifies substantial completion within 365 days and final completion within 395 days from the commencement of contract times.
Water and Sewer Line and Related Structures Construction

POSTED

22 days ago

DEADLINE

in 23 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS