Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on August 11, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Storm water ponds maintenance and repairs

Closed
142775State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
C26863031 CASWELL MEMORIAL STATE PARK - Campground and Day Use Improvements
Solicitation # C26863031
The California Department of Parks and Recreation is soliciting bids for contract C26863031 to upgrade the campground and day use areas at Caswell Memorial State Park in San Joaquin County. This lump sum project, with an engineer's estimate between 4.2 million and 5.8 million dollars, requires the contractor to provide all labor, materials, and equipment to perform work including asphalt demolition, clear and grub operations, and AC overlay. The project must be completed within 365 calendar days from the notice to proceed, with a maximum of 30 days allocated for punch list items and final completion. Eligible bidders must hold a Class A and/or B license and be registered with the Department of Industrial Relations per SB 854. Award is based on the low price method, though incentives are provided for Disabled Veteran Business Enterprise participation exceeding the mandatory 6 percent goal, subject to a 100,000 dollar cap. Certified small businesses may also receive a 5 percent preference. Bids must be submitted electronically in PDF format to the designated email address by the specified deadline. The contractor is responsible for adhering to local prevailing wage rates, ADA compliance, and strict material storage and labeling standards. Quality control will be managed through on-site inspections, required testing logs, and the use of approved mockups to establish aesthetic and workmanship standards.
California Department of Parks & Recreation

POSTED

about 3 hours ago

DEADLINE

in 27 days
NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and reconstruction of eight launching ramps across four bays, designed to accommodate vessels exceeding 35 feet and weighing over 10 tons. Key project activities include the demolition of existing concrete structures, dredging and grading of native soils, placement of various gravel fills, and the installation of new concrete ramps using either a precast slab system or pour-in-place solution. Additionally, the contractor is responsible for the temporary relocation and re-anchoring of floating docks to ensure ADA-compliant travel, the installation of articulated concrete mattresses for scour protection, and the implementation of strict environmental controls, including turbidity curtains and stormwater pollution prevention plans. Bidders must be pre-qualified in Marine Construction for at least 750,000 dollars and provide a bid security deposit equal to 10 percent of their maximum bid price. The project must be completed within 180 calendar days from the Notice to Proceed, with a hard deadline for full public restoration by February 15, 2027. To minimize public disruption, the contract limits the simultaneous closure of all four ramps to a maximum of 45 calendar days. Performance will be verified through third-party topographic surveys, with acceptance based on post-grading soundings compared to the design template. Progress payments will be prorated monthly based on the physical percentage of project completion.
Public Works

POSTED

about 5 hours ago

DEADLINE

in 21 days

General Info

Documents

24

IFB 1100 CPG1003 Att 3 - Exhibit A Stormwater Pond Aerial Photographs

PDF, High priority: read this firstspecifications
High

IFB 1100 CPG1003 Attachment 1 - Stormwater Ponds Maintenance

DOCX, High priority: read this firstsow
High

IFB 1100 CPG1003 Attachment 2 - Insurance Requirements

PDF, High priority: read this firstspecifications
High

IFB 1100 CPG1003 Attachment 2 - Insurance Requirements

PDF, High priority: read this firstspecifications
High

IFB 1100 CPG1003 Attachment 4 - Environmental Services Activities Checklist

PDF, High priority: read this firstspecifications
High

IFB 1100 CPG1003 Exhibit A - AE Stormwater Pond Aerial Photographs

PDF, High priority: read this firstspecifications
High

IFB 1100 CPG1003 Exhibit A - AE Stormwater Pond Aerial Photographs

PDF, High priority: read this firstspecifications
High

IFB 1100 CPG1003 Exhibit A - AE Stormwater Pond Aerial Photographs

PDF, High priority: read this firstspecifications
High

IFB 1100 CPG1003 Exhibit B - Environmental Services Activities Checklist

PDF, High priority: read this firstspecifications
High

IFB 1100 CPG1003 Offer Sheet

DOCX, High priority: read this firstifb
High

IFB 1100 CPG1003 Offer Sheet

DOCX, High priority: read this firstifb
High

IFB 1100 CPG1003 Pricing Submittal Sheet

XLSX, High priority: read this firstifb
High

IFB 1100 CPG1003 Pricing Submittal Sheet

XLSX, High priority: read this firstifb
High

IFB 1100 CPG1003 Pricing Submittal Sheet

XLSX, High priority: read this firstifb
High

IFB 1100 CPG1003 Pricing Submittal Sheet

XLSX, High priority: read this firstifb
High

IFB 1100 CPG1003 - Storm water ponds maintenance and repairs

PDF, High priority: read this firstifb
High

IFB 1100 CPG1003 - Storm water ponds maintenance and repairs

PDF, High priority: read this firstifb
High

IFB 1100 CPG1003 - Storm water ponds maintenance and repairs

DOCX, High priority: read this firstifb
High

IFB 1100 CPG1003 - Storm water ponds maintenance and repairs

DOCX, High priority: read this firstifb
High

IFB 1100 CPG1003 - Storm Water Ponds Maintenance and Repairs

DOCX, High priority: read this firstsow
High

IFB 1100 CPG1003 - Stormwater Ponds Maintenance and Repairs SOW

PDF, High priority: read this firstsow
High

IFB 1100 CPG1003 - Stormwater Ponds Maintenance and Repairs SOW

PDF, High priority: read this firstsow
High

IFQ 1100 CPG1003 Addendum No. 1

PDF, High priority: read this firstamendment
High

IFQ 1100 CPG1003 Addendum No. 1

PDF, High priority: read this firstamendment
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Sep 30, 2025 to Sep 9, 2025.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → City of Austin
Contacts1 person available
OfficeN/A
Organization / AgencyTexas → City of Austin
Office AddressN/A
Contacts
Christopher Gorski

Full Description

Show more
The City of Austin, dba Austin Energy, seeks a Contractor(s) to provide storm water ponds maintenance and repairs.

More opportunities from Texas → City of Austin

Same awarding agency

NAICS: 335929
New
SLED
DE, COMP, ACSR/SD 795 CONDOR, EYE, SNGL TNG, EHV, SS
Solicitation # IFQ 1100 CPG1090
The City of Austin is soliciting quotations under IFQ 1100 CPG1090 for the procurement of specialized electrical hardware, specifically Deadend Compression ACSR/SD 795 Condor components with reference part number HPS / SEDA3313SDSS. The items must be COA approved and meet all applicable federal, state, and local laws and regulations. Award will be granted to the lowest offer that meets all minimum qualifications, with the City evaluating quotes based on individual line items, categories, or aggregate pricing. The contract requires the contractor to provide goods that are merchantable, free from defects, and fit for their intended purpose. Deliveries must be FOB Destination and include all handling and shipping charges. Packaging must be clearly marked with the City's name, address, contents, and the applicable contract number. Payment will be issued within thirty days of invoice submission to the City's authorized contact. Offerors must provide several certifications, including non-debarment, compliance with discriminatory employment practices, and adherence to the Lone Star Infrastructure Protection Act regarding critical electrical grid equipment. Additionally, contractors must certify they do not engage in LGBTQ+ conversion therapy and comply with the City's wage theft program. All shipments must adhere to U.S. Department of Transportation and Environmental Protection Agency regulations for hazardous substances.
Other Communication and Energy Wire Manufacturing

POSTED

2 days ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS