Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from North Carolina was posted on June 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Stream Restoration and Riparian Construction

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and reconstruction of eight launching ramps across four bays, designed to accommodate vessels exceeding 35 feet and weighing over 10 tons. Key project activities include the demolition of existing concrete structures, dredging and grading of native soils, placement of various gravel fills, and the installation of new concrete ramps using either a precast slab system or pour-in-place solution. Additionally, the contractor is responsible for the temporary relocation and re-anchoring of floating docks to ensure ADA-compliant travel, the installation of articulated concrete mattresses for scour protection, and the implementation of strict environmental controls, including turbidity curtains and stormwater pollution prevention plans. Bidders must be pre-qualified in Marine Construction for at least 750,000 dollars and provide a bid security deposit equal to 10 percent of their maximum bid price. The project must be completed within 180 calendar days from the Notice to Proceed, with a hard deadline for full public restoration by February 15, 2027. To minimize public disruption, the contract limits the simultaneous closure of all four ramps to a maximum of 45 calendar days. Performance will be verified through third-party topographic surveys, with acceptance based on post-grading soundings compared to the design template. Progress payments will be prorated monthly based on the physical percentage of project completion.
Public Works

POSTED

about 4 hours ago

DEADLINE

in 21 days
NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex located at Bare Cove Park Drive. This project, with an estimated construction cost of $1,300,000, involves comprehensive site work including the removal of trees and shrubs, site re-grading, and the installation of post-tension courts, posts, nets, walkways, benches, shade shelters, fencing, and sound attenuation. Additionally, the contractor will construct a new asphalt parking lot and ADA-compliant pathways. The awarded contractor must coordinate with the Town and the demolition contractor, Pasquazzi Bros, Inc., and is responsible for the installation and maintenance of construction fencing and erosion control throughout the project duration. The contract will be awarded to the lowest responsible and eligible bidder who meets strict minimum qualifications, including at least seven years of experience in constructing sports courts and a proven track record of building post-tension courts, including at least one for a Massachusetts municipality within the last three years. Bids must be submitted as a fixed lump sum via the OpenGov portal by November 3, 2026. The project is governed by Massachusetts General Law Chapter 30, Section 39M, and requires strict adherence to prevailing wage schedules, OSHA regulations, and the Buy America Act. Key financial requirements include a 5% bid security, a payment bond equal to 50% of the total project cost, and a 5% retainage on monthly progress payments. The contractor must provide a minimum one-year warranty for labor and a two-year warranty for materials.
Recreation

POSTED

about 4 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

This subcontract for Stream Restoration and Riparian Construction involves the physical restoration and enhancement of stream channels and riparian buffers within the Yadkin River Basin. Working for prime contractors on NCDMS mitigation bank projects, the selected provider will implement stream restoration Levels I and II in accordance with the 2003 USACE Stream Mitigation Guidelines and the 2016 Wilmington District updates. The scope of work includes the installation of permanent livestock exclusion fencing as well as the construction of roads, culverts, bridges, fords, and stream crossings. The primary objective is the delivery of established riparian buffers and restored stream reaches. This opportunity is managed by the North Carolina Department of Environmental Quality under NAICS code 237990, with a response deadline of October 6, 2026.

General Info

Subcontract for Yadkin River Basin stream restoration and riparian construction due October 6, 2026.

Documents

This scope was carved out of 16-2144402107.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFP 16-2144402107 2026 Yadkin 03040101 Warm Stream and Riparian Wetland Full Delivery Projects

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNorth Carolina → Department of Environmental Quality
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs physical restoration and enhancement of stream channels and riparian buffers for prime contractors on NCDMS mitigation bank projects in the Yadkin River Basin. Implements stream restoration Levels I and II per 2003 USACE Stream Mitigation Guidelines and 2016 Wilmington District updates. Installs stream crossings, fords, roads, culverts, bridges, and permanent livestock exclusion fencing. Delivers restored stream reaches and established riparian buffers.

More opportunities from North Carolina → Department of Environmental Quality

Same awarding agency

NAICS: 562910
SLED
RFP16-2393983869 White Oak 03030001 2026 Stream, Riparian and Non-Riparian Wetland Compensatory Mitigation Full Delivery Projects
Solicitation # 16-2393983869
The North Carolina Department of Environmental Quality, through the Division of Mitigation Services, is soliciting proposals for Full Delivery Projects to provide warm stream, riparian wetland, and non-riparian wetland mitigation credits within Cataloging Unit 03030001 of the White Oak River Basin. The objective is to acquire credits to satisfy regulatory permit conditions, with the requirement that preservation credits do not exceed 50 percent of the total. While stream-only projects are acceptable, wetland-only projects are prohibited. All mitigation must adhere to USACE guidelines and the 1987 Wetland Delineation Manual, and perennial streams must score at least 30 points per the NC Division of Water Quality Stream Classification Manual. The award will be based on a best value determination, utilizing an adjusted credit cost formula that divides the credit cost by the technical proposal rating. Proposals must include a sealed cost proposal and specific technical attachments, including project boundaries in ArcMap multipart polygon format. Performance schedules must include either a five-year monitoring period within an eight-year contract or a seven-year monitoring period within a ten-year contract. Financial assurance is mandatory via performance bonds, letters of credit, or casualty insurance, with performance bonds required to be 55 percent of the total contract value. The contract is governed by North Carolina General Terms and Conditions and requires compliance with the Clean Air Act and Federal Water Pollution Control Act for subcontracts exceeding 150,000 dollars. Payment terms are net 30 days following the receipt of a correct invoice. Vendors must certify compliance with non-discrimination laws and the Contract Work Hours and Safety Standards Act. Final acceptance of the work is contingent upon the completion of all applicable assessment procedures and approval by the Contract Manager.
Remediation Services

POSTED

8 days ago

DEADLINE

in 4 months
View Details
NAICS: 541620
SLED
Update of the North Carolina Beach and Inlet Management Plan BIMP
Solicitation # 16-101362-000
The North Carolina Department of Environmental Quality, Division of Coastal Management, is seeking a qualified contractor to update the 2016 North Carolina Beach and Inlet Management Plan (BIMP). This comprehensive management tool covers 320 miles of oceanfront beaches and 19 active tidal inlets. The scope of work includes developing regional management plans with area descriptions and short- and long-term strategies, conducting technical analyses on erosion rates and storm vulnerability, and providing financial analyses including annual cost estimates and economic impact assessments. All work must comply with the 2026 Appropriations Act, Session Law 2026-41, and maintain data formats consistent with the 2016 update. This lump-sum contract utilizes a payment schedule distributed in three installments: 34% upon contract execution, 33% upon acceptance of the interim BIMP report, and the final 33% upon satisfactory completion of the final report. Proposals are due by November 2, 2026, via the electronic Vendor Portal and will be evaluated based on the vendor's technical approach, qualifications and references, and pricing, in that order of importance. Award decisions are made by a committee through narrative and consensus. The selected vendor must adhere to strict personnel substitution rules requiring prior written approval from the Contract Lead and must certify compliance with various state and federal regulations, including E-Verify and non-collusion statutes.
Environmental Consulting Services

POSTED

20 days ago

DEADLINE

in 5 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS