Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Transportation was posted on September 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Structural & Seismic Retrofitting

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238110
New
SLED
Taylor Park Improvements- Phase 2
Solicitation # PE-66492-NONST-2027-000000009
The City of Bloomingdale is soliciting sealed proposals for the Taylor Park Improvements- Phase 2 project in Bloomingdale, Georgia. The scope of work involves the construction of a new concrete basketball court that meets high school requirements, including a concrete slab, new goals, and a surface finished with acrylic or elastometric sports court coating and acrylic paint for striping. All work must comply with State of Georgia Public Parks Compliance and specific technical standards, including ASTM C 94 for concrete mixing, ACI 301-99 for formwork, and ASTM A 615/A 615M Grade 60 for reinforcement bars. Proposals must be submitted in a sealed envelope to the City of Bloomingdale by 4:00pm on November 30, 2026, following a mandatory pre-bid meeting on November 12th at 2:00pm. The contract will be awarded by the Mayor and City Council during a meeting on December 5th. Bidders are required to provide a lump sum bid price valid for 90 to 180 days and must demonstrate qualifications including five years of successful performance and experience with similar pavement work. The selected contractor must commence work within 10 calendar days of the Notice to Proceed and complete the project within 30 calendar days, which includes 7 days for adverse weather. Failure to meet the completion deadline will result in liquidated damages of 500 dollars per day. Payment will be made based on the lump sum bid, with a 10 percent retainage held by the City until satisfactory project completion. The contractor is also responsible for maintaining required insurance policies and coordinating inspections with the City of Bloomingdale contact and the owner's representative.
City of Bloomingdale

POSTED

about 6 hours ago

DEADLINE

in about 1 month
NAICS: 238110
New
SLED
Taylor Park Improvements- Phase 1
Solicitation # PE-66492-NONST-2027-000000008
The City of Bloomingdale is soliciting sealed lump sum proposals for the Taylor Park Improvements- Phase 1 project in Bloomingdale, Georgia. The scope of work involves the removal and disposal of an existing concrete basketball court and goals, the construction of concrete sidewalks connecting the concessions stand and offices to the playground, batting cage, dugout, and ball field bleachers, and the replacement of any conflicting items such as fencing and landscaping. The project requires adherence to strict technical standards, including ACI 301 and ACI 117 for concrete and reinforcement, ASTM C309 for curing compounds, and ASTM A 615/A 615M for reinforcement bars. Prospective bidders must attend a mandatory pre-bid meeting on November 12, 2026, at 2:00 pm at Bloomingdale City Hall. Sealed proposals are due by 4:00 pm on November 30, 2026, with the contract award scheduled for the City Council Meeting on December 5, 2026. Qualified contractors must demonstrate at least five years of successful in-service performance for similar pavement work. Once awarded, work must commence within 10 calendar days of the Notice to Proceed and be completed within 60 calendar days, with seven days allotted for adverse weather. The City will hold a 10 percent retainage until final acceptance, and failure to meet the completion deadline will result in liquidated damages of 500 dollars per day.
City of Bloomingdale

POSTED

about 6 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This subcontract for Structural and Seismic Retrofitting supports prime contractors on Western Federal Lands Division building renovation projects. The scope of work focuses on delivering a code-compliant structural shell and foundation by bracing and anchoring unreinforced masonry walls and reinforcing foundations to meet current performance standards. Technical execution includes the implementation of lateral force resisting systems and the value engineering of shear walls and steel girders. The project falls under NAICS code 238110 and is managed by the Department of Transportation. Performance is centered in the 98661 zip code area, with a response deadline set for September 8, 2026.

General Info

Structural and seismic retrofitting for Western Federal Lands building renovations by September 2026.

NAICS

238110 - Poured Concrete Foundation and Structure Contractors

Place of Performance

WA, 98661, USA

Set-Aside

NONE

Documents

This scope was carved out of 69056726R000008.

The full solicitation package (19 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Western Federal Lands Highway Division (WFLHD) Building Renovation Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 690567 Western Federal Lands Division
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs structural reinforcement and seismic upgrades for prime contractors on WFLHD building renovation projects. Braces and anchors Unreinforced Masonry (URM) walls and reinforces foundations to meet current performance standards. Utilizes lateral force resisting systems and performs value engineering of steel girders and shear walls. Delivers a code-compliant structural shell and foundation.

More opportunities from Department Of Transportation → 690567 Western Federal Lands Division

Same awarding agency

NAICS: 237310
New
Federal
AK FLAP ANCHORAGE 2021(1), Far North Bicentennial Park Enhancements
Solicitation # 69056726B000012
The Far North Bicentennial Park Enhancements project, managed by the Department of Transportation's Western Federal Lands Highway Division, involves construction along the North Gasline Trail approximately five miles east of Anchorage, Alaska. This sealed bid, firm-fixed-price contract has an estimated price range between $700,000 and $2,000,000, with a tentative completion date of Fall 2027. The scope of work is divided into a base schedule and one option. The base schedule includes the construction of an 80-foot single span prefabricated steel pedestrian bridge over Campbell Creek and a 61-foot boardwalk, along with trail aggregate and turf establishment. Option Z provides for the construction of an additional 51-foot boardwalk. Technical requirements specify adherence to FP-24 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects and AASHTO design standards for seismic and pedestrian live loads. Key material specifications include epoxy-coated reinforcing steel, high-strength low alloy structural steel, and Douglas Fir timber treated according to AWPA standards. Contractors must provide weed-free certification for all commercial borrow and aggregate materials. The project is offered for full and open competition on an unrestricted basis, with formal solicitation documents expected in winter 2026/2027.
Highway, Street, and Bridge Construction

POSTED

about 13 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
Federal
WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4
Solicitation # 69056726B000010
Solicitation 69056726B000010 is an Invitation for Bids for the Hurricane Ridge Rockfall Mitigation MP 9.4 project located in Olympic National Park, Clallam County, Washington. This firm fixed-price construction project, managed by the Department of Transportation's Federal Highway Administration Western Federal Lands Division, involves the installation of a rockfall mitigation system approximately 11 miles south of Port Angeles. The scope of work includes the installation of 102 linear feet of Geobrugg RXE-8000 flexible rockfall barrier fence and the treatment of 260 square yards of galvanized steel using Natina Steel weathering agent. Additional requirements include survey and staking, quality control, testing, clearing and grubbing, excavation, and the construction of retaining walls, all adhering to FP-24 standard specifications. The estimated project value ranges between 2 million and 5 million dollars, with a tentative completion date of Fall 2027. This opportunity is a total small business set-aside, and awards will be made to the responsible bidder offering the most advantageous price. Bids must be submitted in sealed envelopes by 1400 local time on November 4, 2026, and must include a valid Standard Form 24 bid bond. Contractors are required to use the Masterworks web-based system for daily reports and measurement notes, and they must comply with specific restrictions prohibiting audio/video recording or AI note-taking during government meetings. The contractor is also responsible for securing all necessary permits for any material sites or sources they identify. Payment will be processed via Electronic Funds Transfer.
Highway, Street, and Bridge Construction

POSTED

about 13 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237310
New
Federal
MT NP GLAC 14(5), Many Glacier Road Landslides
Solicitation # 69056726B000015
The MT NP GLAC 14(5) project involves the reconstruction of approximately 2.55 miles of roadway on Many Glacier Road in Glacier County, Montana, located about four miles west of Babb. Managed by the Department of Transportation's Western Federal Lands Division, the scope of work includes excavation, subgrade stabilization, the placement of roadway aggregate and asphalt concrete pavement, and the construction of rock buttressing, riprap revetments, drainage improvements, and utility infrastructure. The project also includes a specific option for utility relocation. The estimated price range for the contract is between 20 million and 30 million dollars, with a tentative solicitation date in winter 2027 and a fixed completion date for both the base work and utility relocation option set for summer 2029. Technical requirements include the installation of 47,300 linear feet of horizontal drain pipe, 470 linear feet of inclinometer casing, and five piezometers with data loggers. Strict environmental compliance is required, necessitating noxious weed and non-native invasive species inspections for all material sources, including specific pits operated by Spoklie's, LaSalle, Sandry Construction, and Schedllinger. Operational mandates include the use of pilot cars with specific signage and contractor identification, as well as strict prohibitions against storing equipment or materials in designated buffer spaces. The project falls under NAICS code 237310 and is currently listed as a presolicitation with no set-aside used.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 237310
New
Federal
ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1
Solicitation # 69056726R000019
Solicitation 69056726R000019 is a firm fixed-price task order request for proposals issued by the Federal Highway Administration Western Federal Lands Division for the Yellowstone Trail Road, Segment 1 project in Kootenai County, Idaho. Located in the Coeur d'Alene National Forest, the 0.20-mile project involves roadway realignment and reconstruction, the installation of a new single-span precast prestressed concrete structure, and rock-mass stabilization. The estimated price range for the work is between 2 million and 5 million dollars, with a tentative completion date in Fall 2027 and an assumed notice to proceed date of January 12, 2027. This is a restricted MATOC solicitation, meaning proposals will only be accepted from six specific prime contractors: ASCORP Inc (DBA Debco Construction), Granite Construction, Hamilton Construction, M.A. Deatley Construction, MJ Hughes Construction, and Thompson Contracting. Award will be based on the best value, primarily focusing on the lowest price among responsible offerors. The project must adhere to the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-24) and requires strict compliance with various Federal Acquisition Regulation clauses regarding labor standards, equal opportunity, and material workmanship.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 14 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS