Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Virginia was posted on August 29, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Structural Engineering Design Services

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Design Services For Water Well No. 30 Rehabilitation
Solicitation # UH26004
The City of Stockton is soliciting professional engineering services for the Water Well No. 30 Rehabilitation Project located in Lodi, California. The primary objective of this project is to ensure that water quality meets all Title 22 drinking water quality standards while maintaining a well capacity of approximately 2,000 gallons per minute. The scope of work includes the development of a Preliminary Design Report that identifies treatment options for 1,2,3-TCP and provides a 10-year capital and O&M cost analysis, the creation of full construction documents, the preparation of water system permit amendment applications, and the provision of engineering support during the bidding process. Proposals are due by December 3, 2026, and must be submitted to the Office of the City Clerk in Stockton. The submission must include one original with wet ink signatures, three copies, and a USB containing an electronic version, with the fee proposal submitted in a separate sealed envelope and a passcode-protected file on the USB. The City will use a ranking process to select the most qualified consultant, evaluating proposals based on technical merit before reviewing cost proposals. Selected contractors must comply with prevailing wage requirements, ADA standards, and non-discrimination laws, and must provide a Certification of Financial Condition to ensure financial soundness and tax compliance. Payment for services is processed within 30 days of receiving an approved invoice.
City of Stockton

POSTED

about 10 hours ago

DEADLINE

in 17 days
NAICS: 541330
New
SLED
RFQ# RS-27-05 Construction Engineering and Inspection Services for Orange Drive (SW 92 Avenue to SW 67 Avenue)
Solicitation # RFQ# RS-27-05
The Town of Davie is soliciting qualifications for Construction Engineering and Inspection (CEI) services for the Orange Drive Sidewalk Improvement Project, spanning from SW 92 Avenue to SW 67 Avenue. This CCNA solicitation seeks a consultant to provide a lump sum not to exceed cost, with an estimated budget of $178,972. The selected firm will be responsible for daily field observations averaging 20 hours per week, managing bi-weekly progress meetings, processing RFIs and plan revisions, and performing quality control inspections. The total period of performance is 300 days, designed to coincide with the construction phase and include 30 days for the closeout of Local Agency Program (LAP) requirements. Qualified proposers must be FDOT prequalified for CEI services and demonstrate specific FDOT/LAP experience through the resumes of their key personnel. The evaluation process is based on the best interest of the Town, with a significant weight placed on experience and technical capabilities, including the firm's ability to meet time and budget constraints. Submissions must be made electronically via the OpenGov e-Procurement Portal and include a letter of interest, project team forms, an organizational chart, and references from similar projects completed within the tri-county area. The contract is subject to stringent federal and state regulations, including the Build America Buy America Act, Davis-Bacon and Related Act provisions, and FHWA-1273 requirements for federal-aid construction. Compliance with EEO standards, OSHA safety regulations, and non-discrimination policies is mandatory. Additionally, the consultant must adhere to a Cone of Silence during the solicitation process and provide necessary certifications regarding their business operations and tax status. Payment is processed via purchasing card or purchase order, with a standard payment term of net 45 days per Florida State Statutes.
Engineering

POSTED

about 12 hours ago

DEADLINE

in 14 days
NAICS: 541330
New
International
District of Houston - Subdivision and Development Servicing Bylaw
Solicitation # 2026-13
The District of Houston is seeking a qualified consulting firm to develop and draft a new Subdivision and Development Servicing Bylaw (SDSB) to replace the existing 1998 version. The primary objective is to modernize and streamline development approval processes by adopting Master Municipal Construction Documents (MMCD) standards and replacing outdated design criteria. The scope of work includes reviewing master plans and bylaws, developing a roadway cross-sectional elements table, providing professional risk assessments regarding the transition to MMCD standards, and assisting with presentations to the Committee of the Whole and Council. Key deliverables include draft bylaw sections in Word format, drawings in PDF and AutoCAD, and summary documentation for public and council consumption. The project has a total budget not to exceed $75,000.00, inclusive of all taxes and expenses. The contract is based on firm pricing, and the successful proponent will be selected using a Balanced Best Value Selection Criteria, involving a qualitative written proposal and a presentation, each scored out of 100 points. The contractor must maintain $2,000,000 in Commercial General Liability insurance and $1,000,000 per claim in Professional Liability insurance. The agreement specifies that the District retains exclusive ownership of all materials and copyright. Proposals must be submitted as a single PDF in English to the District of Houston by the December 21, 2026, deadline.
District of Houston

POSTED

about 12 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
International
Environment and Protected Areas - Request for Proposal - Former Smoky River Coal Mine Geotechnical Assessment
Solicitation # 27TDRRAD801
Alberta Environment and Protected Areas is seeking a qualified professional contractor to conduct a geotechnical assessment of the M1 rock dump at the former Smoky River Coal Mine near Grande Cache, Alberta. The primary objective is to characterize slope instability, specifically addressing major and minor slump areas, to determine if there is an imminent risk to Sheep Creek and an active haul road. The selected contractor will be responsible for developing and executing a slope characterization plan, performing a risk assessment to predict the likelihood and consequences of failure, and providing recommendations for future monitoring and trigger action response plans. The project has a total budget not to exceed $500,000.00, split between fiscal year 2026/27 ($50,000) and 2027/28 ($450,000). Proposals must be submitted electronically by December 18, 2026, and will be evaluated based on a highest-scoring compliant proposal model. Mandatory requirements include the maintenance of a valid Certificate of Recognition (COR) for health and safety, and the submission of a detailed service delivery approach. The contract includes standard provisions for non-disclosure, indemnity, and compliance with Alberta's Workers Compensation Act.
Environment and Protected Areas

POSTED

about 12 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The University of Mary Washington is seeking a subcontractor to provide comprehensive structural engineering design services for its buildings and infrastructure. The scope of work includes performing detailed load analysis, designing foundations, and ensuring all designs maintain strict adherence to applicable building codes. This opportunity is categorized under NAICS code 541330 and was posted on August 29, 2025. Interested parties must submit their responses by the deadline of September 9, 2025.

General Info

University of Mary Washington seeks structural engineering subcontractors by September 9, 2025.

Place of Performance

VA, USA

Set-Aside

NONE

Documents

This scope was carved out of UMW 26-1974.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Term Contract For A/E Services -- Structural Engineering

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • DBE Subconsultant Opportunity - Qualifications for E Wells PFAS Groundwater Treatment ImprovementsOpen now, due in 15 days
  • Games-Time Transportation and Mobility PlanningOpen now, due in 7 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVirginia → University of Mary Washington
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Provide full structural engineering design for university buildings and infrastructure, including load analysis, foundation design, and code compliance.

More opportunities from Virginia → University of Mary Washington

Same awarding agency

NAICS: 236220
SLED
UMW Campus-Wide Accessibility Improvements (Bushnell and Westmoreland Residence Halls)-- 215-18601-003
Solicitation # 27-2211
The University of Mary Washington has issued solicitation 27-2211 for campus-wide accessibility improvements at Bushnell and Westmoreland Residence Halls in Fredericksburg, Virginia. The project involves partial renovations to enhance accessibility for living and teaching spaces. At Bushnell Hall, work includes upgrades to the main entrance, residential kitchen, and selected dorm rooms on the second through fifth floors, as well as the installation of a new elevator. Westmoreland Hall will receive similar upgrades to its main entrance, residential kitchen, and selected dorm rooms on the first through third floors, along with a new elevator installation. The contract will be awarded on a lump sum basis, comprising the Total Base Bid Amount and any additive bid items selected by the owner. Bidders must be registered vendors in eVA and provide a required bid bond. Sealed bids are due by 2:00 P.M. on December 14, 2026. Performance requires mobilization within 14 days of the Notice-to-Proceed, with non-negotiable deadlines for Bushnell Hall set for substantial completion by June 5, 2028, and final completion by June 30, 2028. Westmoreland Hall must reach substantial completion by June 4, 2029, and final completion by July 2, 2029. All work is subject to the CO-7 General Conditions of the Construction Contract for Capital Outlay Projects.
Commercial and Institutional Building Construction

POSTED

7 days ago

DEADLINE

in 27 days
View Details
NAICS: 541310
SLED
A/E Term Contract for University of Mary Washington (Multiple Awards Anticipated)
Solicitation # UMW 27-2201
The University of Mary Washington has issued solicitation UMW 27-2201 for a Multiple Award Term Contract for Architectural and Engineering (A/E) services. The scope of work involves providing comprehensive expertise for project orders, including project analysis, feasibility studies, cost estimates, and specialized consulting in sustainable design, energy efficiency, accessibility, and code compliance. The contract is governed by the A/E Manual and the Terms and Conditions of the A/E Contract (CO-3a) as defined in the Construction and Professional Services Manual. The agency may award term contracts to up to four fully qualified firms based on a merit-based selection process involving initial screening, interviews, and a final ranking of professional qualifications. The contract consists of an initial one-year term with the option for up to three one-year renewals. Each contract term has an aggregate spending limit of 10 million dollars, with individual project orders capped at 2 million dollars. Unused funds do not carry over between terms. Proposals must be submitted as a single searchable PDF not exceeding 50 pages and 25MB by November 20, 2026. Required documentation includes the RFP cover page, forms AE-1 through AE-6, and small business participation data, with a target goal of 45 percent or greater for DSBSD-certified small businesses. Final awards are based on negotiated hourly rates established via a Memorandum of Understanding.
Architectural Services

POSTED

7 days ago

DEADLINE

in 3 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS