Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Structural Steel and Weld Inspection

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Procurement Department of Sacramento Municipal Utility DistrictView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of PRC0001130.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

GEOTECHNICAL INSPECTIONS, MATERIAL TESTING, AND SPECIAL INSPECTION SERVICES

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Procurement Department of Sacramento Municipal Utility District
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Procurement Department of Sacramento Municipal Utility District
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Visual and non-destructive inspection of structural steel welds and connections to ensure compliance with AWS D1.1 and structural design specifications.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals from Disadvantaged Business Enterprise (DBE) firms for the Corydon Well Replacement Project on behalf of the Elsinore Valley Municipal Water District in California. The project involves the design of a new municipal groundwater production well to replace and abandon the existing Corydon well. The scope is divided into two phases: Phase 1 covers technical specifications, civil site design, bidding assistance, and full-time on-site construction management; Phase 2 includes architectural, civil, mechanical, structural, electrical, and instrumentation and controls design for equipping, testing, and commissioning the well. Key technical requirements include using 24-inch diameter stainless steel Ful-Flo louvered well screens and ensuring the new pump matches existing vertical turbine equipment applications. The total estimated project cost is 2,260,788 dollars, which includes 2,000,000 dollars for construction. Award selection is based on demonstrated competence and professional qualifications rather than lowest cost, with evaluation weighted toward relevant experience (25%), project approach (25%), and scope/schedule (20%). Proposals must be submitted via the PlanetBids Vendor Portal by September 1, 2026. The contract is subject to strict federal and state regulations, including Build America Buy America (BABA) domestic-content requirements, the Iran Contracting Act, and various non-discrimination and environmental statutes. Payment is managed exclusively through the Department of Treasury Automated Standard Application for Payments (ASAP) system, with oversight provided by the Bureau of Reclamation.
Ardurra Group, Inc.

POSTED

about 7 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541330
New
Corydon Well Replacement Project – Professional Design, Bidding Support and Engineering Services During Construction
Solicitation # WO# C2305
The Corydon Well Replacement Project, managed by GEI Consultants, Inc. for the Elsinore Valley Municipal Water District, is a professional services engagement focused on the design and construction of a new municipal groundwater production well and the abandonment of the existing Corydon Well in California. The project is divided into two primary phases: Phase 1 covers technical specifications, civil site design, bidding assistance, and full-time on-site construction management for the drilling and abandonment process; Phase 2 involves architectural, civil, mechanical, structural, electrical, and instrumentation and controls design for the equipping, testing, and commissioning of the new well. The total estimated project cost is 2,260,788 dollars, with a significant portion allocated to contractual and construction costs. The project is partially funded by the Department of the Interior Bureau of Reclamation WaterSMART Planning and Project Design Grant, requiring strict adherence to federal grant requirements, including 2 CFR Part 200 procurement standards, the Build America, Buy America Act, and specific reporting cycles. Qualified firms, particularly certified DBE and small businesses, are encouraged to apply. Requirements for the selected consultant include providing performance and payment bonds for 100 percent of the contract price, maintaining comprehensive general and automobile liability insurance, and complying with California prevailing wage laws and Cal/OSHA standards. Proposals must be submitted via the PlanetBids Vendor Portal, and the award will be based on the most advantageous proposal, considering qualifications and price.
GEI Consultants, Inc.

POSTED

about 7 hours ago

DEADLINE

in 20 days
View Details

More opportunities from California → Procurement Department of Sacramento Municipal Utility District

Same awarding agency