Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from California was posted on July 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Structural Steel and Weld Inspection

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
ON-CALL STRUCTURAL ENGINEERING SERVICES
Solicitation # 26/27-15
The Town of Manchester, Connecticut, is soliciting proposals under solicitation number 26/27-15 for a qualified structural engineering firm to provide on-call services on an as-needed basis. The scope of work involves the review, analysis, inspection, and design of municipal infrastructure. To be eligible, the consultant must be a professional engineer licensed in the State of Connecticut. Proposals are due by October 29, 2026, and must be submitted electronically via the Town's procurement portal. The selection process is based on a points-based scoring method evaluating qualifications, relevant experience, key personnel, and hourly pricing, though the award is not based solely on cost. The Town reserves the right to shortlist candidates for interviews and negotiate with the selected vendor prior to the final award. Contractors must adhere to strict insurance requirements, including General Liability, Professional Liability, Cyber Risk, and Environmental Liability, each with minimums of 1,000,000 dollars. Additionally, the contract is subject to the Town of Manchester Living Wage Ordinance for values exceeding 25,000 dollars per fiscal year, requiring specific hourly wage rates for eligible employees and the submission of a Living Wage Certification. Required submission documents include a PDF proposal, a current IRS Form W-9, a SAM number, and a disclosure of any municipal litigation or arbitration from the past ten years. All services must comply with the laws of the Federal Government and the State of Connecticut.
Engineering

POSTED

about 1 hour ago

DEADLINE

in 8 days
NAICS: 541330
New
SLED
Carrell Canal Closed Drainage Design
Solicitation # RSQ 26-031
The City of Fort Myers is soliciting qualifications under RSQ 26-031 for a consultant to provide design plans to replace the existing open Carrell Canal, located between US 41 and the Ten-Mile Canal, with a closed drainage system. The project scope includes the design of a permanent emergency pumping station south of Palm Avenue near the Ten-Mile Canal and a 12-foot-wide asphalt multi-use path. The design must align with the findings of the Carrell Canal Drainage Study Report dated January 22, 2020. Required services encompass overall project management, composite boundary and topographic surveying, subsurface utility investigations, and supplemental geotechnical investigations. Submittals must be uploaded as a single signed PDF via the OpenGov portal by October 28, 2026, at 2:00 pm EST. The City will award the contract to the top-ranked consultant based on a points-based evaluation focusing on firm experience and personnel qualifications, project approach, Minority Business Enterprise compliance, and local vendor preference. Selected consultants must meet mandatory minimum qualifications and provide comprehensive insurance coverage. While construction estimates for the project range from 8.2 million to 9.9 million dollars, the professional services fee will be established through negotiations following City Council approval.
Engineering (Public Works)

POSTED

about 5 hours ago

DEADLINE

in 34 minutes

AI Contract Overview

Show more

The Procurement Department of the Sacramento Municipal Utility District in California is seeking a subcontractor for structural steel and weld inspection services. The scope of work involves performing visual and non-destructive inspections of structural steel welds and connections to verify that all work complies with AWS D1.1 standards and specific structural design requirements. This opportunity is categorized under NAICS code 541330. The solicitation was posted on July 15, 2026, and the deadline for responses is August 14, 2026. Interested parties can find further details through the provided PlanetBids portal link.

General Info

Sacramento Municipal Utility District seeks structural steel and weld inspection subcontractors by August 14.

Documents

This scope was carved out of PRC0001130.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

GEOTECHNICAL INSPECTIONS, MATERIAL TESTING, AND SPECIAL INSPECTION SERVICES

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Procurement Department of Sacramento Municipal Utility District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Visual and non-destructive inspection of structural steel welds and connections to ensure compliance with AWS D1.1 and structural design specifications.

More opportunities from California → Procurement Department of Sacramento Municipal Utility District

Same awarding agency

SLED
SecureAuth Multifactor Authentication (MFA) Software
Solicitation # RITM0131249.AS
The Sacramento Municipal Utility District (SMUD) is soliciting bids under solicitation number RITM0131249.AS for the procurement of SecureAuth Multi-Factor Authentication (MFA) software. The primary objective is to replace the existing Operational Technology (OT) MFA platform with the SecureAuth Identity Platform. The required solution must support a hybrid deployment model where the Identity Provider remains on-premises via Windows virtual appliances while the MFA capability is delivered as a cloud-based service. Key technical requirements include integration with SMUD's on-premises Security Information and Event Management (SIEM) system and the maintenance of fail-closed authentication behavior. The contract is intended for a three-year term, with award evaluations based on a Bid Schedule of annual unit pricing and total costs. Bidders must be authorized to sell SecureAuth software and must pass a vendor risk assessment via a Vendor Risk Questionnaire. A significant incentive is provided through the SEED Program, where qualified small or microbusinesses located within SMUD territory and certified by the DGS Office of Small Business and DVBE can receive a price advantage of 5% of the lowest responsible bid, up to a maximum of $250,000. Compliance and security are heavily emphasized, requiring adherence to NERC CIP-13 reliability standards and the execution of a Cybersecurity Supply Chain Risk appendix. The agreement mandates a strict Non-Disclosure Agreement, background checks for personnel accessing SMUD assets, and the potential for security audits. Bids must be submitted electronically through the PlanetBids portal by the specified deadline, as mailed or hand-delivered responses will not be accepted.

POSTED

22 days ago

DEADLINE

in 5 days
View Details
SLED
CRANE INSPECTION SERVICES - UPPER AMERICAN RIVER PROJECT
Solicitation # PRC0001054
The Sacramento Municipal Utility District (SMUD) is soliciting proposals under solicitation PRC0001054 for professional crane inspection services at the Upper American River Project. The selected contractor will provide licensed surveyors to perform annual State of California required inspections on powerhouse cranes and hoists, including bridge, gantry, monorail, and jib cranes. All work must comply with Title 8 of the California Code of Regulations, specifically Section 4884 and Article 11, as well as OSHA 9010. Key deliverables include the provision of CalOsha CA-4 or USDL part 1919 certificates for compliant equipment and the supply of water bags or concrete blocks for quadrennial load tests at 125 percent capacity, with specific variances for main hooks at designated powerhouses. The contract is awarded on a services-as-needed basis using a task order system, requiring the surveyor to respond to requests within five working days. Performance occurs at various SMUD facilities, including the Fresh Pond Maintenance Headquarters and East Campus Operations Center. Award evaluation is weighted toward management and technical ability over price, with additional points awarded to SEED-qualified prime proposers or those utilizing SEED subcontractors. The contractor must adhere to strict security protocols, including background checks and a non-disclosure agreement. Compensation is based on a hourly bid schedule for a five-year period, with prevailing wages based on Sacramento County and capped inflation adjustments after the second year.

POSTED

about 1 month ago

DEADLINE

in 5 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS