Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Florida was posted on May 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Studios Energy South Chiller Expansion

Closed
ITB # C007094State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238220
New
SLED
ICE 8A - Ft Benning Improvements
Solicitation # 70CMSW25R00000011
This firm-fixed-price task order, issued under an 8(a) Multiple Award Construction Contract (MACC) for the DHS Office of Firearms and Tactical Programs, provides design-build services for life, safety, and operational improvements at Fort Benning, Georgia. The project scope includes a variety of facility enhancements such as installing aluminum awnings, replacing turf at Fiske Range, demolishing and restoring Building 2294, improving gutters and drainage at Building 234, and performing commercial HVAC replacements. Additional work involves general improvements to Building 301 and the DAGr Team facility, including office refreshes, the installation of AV equipment and gear storage lockers, and the reconfiguration of restrooms to include walk-in showers. The estimated magnitude of the project is between 4.0 million and 4.5 million dollars, with a period of performance not to exceed 365 days from the date of award. Award will be based on the lowest total evaluated price, provided the offeror demonstrates a technical understanding of the requirements and possesses the necessary licensed professional resources. The contract is subject to the Davis-Bacon Act, requiring adherence to wage determination GA20260320, including specific federal paid sick leave and minimum wage mandates. Performance and payment bonds are required per FAR 52.228-15. Administrative oversight is managed by the Contracting Officer's Representative, Mr. Joseph Addison, and all payment requests must be submitted electronically via the Invoice Processing Platform with accompanying certified payroll.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 5 days
NAICS: 238220
New
SLED
PIDC Project 3 - Dorm RTU Replacement and SCADA
Solicitation # 872287
This project involves the replacement and upgrade of Rooftop HVAC Units (RTUs) for the Alpha, Bravo, Charlie, and Delta dorms, as well as a SCADA system upgrade at the Port Isabel Detention Center in Los Fresnos, Texas. The objective is to replace corroded and obsolete HVAC equipment with high-quality, durable, and coastal weather-resistant systems that exceed commercial and industrial standards. The SCADA portion of the project requires replacing current software and installing two chemical feed pumps to ensure effective water production and wastewater management in compliance with Texas Commission of Environmental Quality standards. The contract is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ, with an estimated magnitude between 1.2 million and 1.5 million dollars. The period of performance is 365 days from the date of award. Award will be based solely on the lowest total evaluated price. Key requirements include the submission of a Quality Control Plan, a one-year contractor warranty for installation and craftsmanship, and the appointment of a Project Manager with at least five years of recent federal contracting experience. The project is subject to the Davis-Bacon Act and requires performance and payment bonds. All personnel must undergo background checks to access the secure facility. The contractor is responsible for providing a detailed project schedule following the Notice to Proceed and must adhere to specific working hours, typically 7:00 AM to 3:30 PM. Proposals must be submitted by September 24, 2026, and include a detailed pricing breakdown by CSI division.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 12 days
NAICS: 238220
New
RFQ7593 Smoke Detector Installation
Solicitation # RFQ7593
Management & Training Corporation (MTC) is soliciting bids for a fee-for-service subcontracting opportunity to provide smoke detector installation and fire system services at the Sierra Nevada Job Corps Center in Reno, Nevada. The scope of work requires the replacement of 43 smoke detectors across specific dormitory rooms, including 12 detectors in rooms 11, 15, and 18, 12 detectors in room 19, and 19 detectors in rooms 20 and 21. The contractor must ensure all installed detectors communicate with the fire panel and that all work adheres to NFPA standards and local Authority Having Jurisdiction requirements. Bids must be submitted via email to Tom Williams by 3:00 PM PST on September 18, 2026. To be considered, applicants must provide a completed bid sheet, proof of insurance, and a supplier packet containing a W-9, self-certification form, and acceptance of terms and conditions. This opportunity is open to various small business set-asides, including SDB, WOSB, HUBZone, and Veteran-Owned businesses, under NAICS code 238220. Award decisions will be based on the best value as determined by MTC. The contract mandates compliance with Service Contract Labor Standards and Wage Determination No. 2015-5595 Revision 28 for labor rates in Washoe and Storey counties. Additionally, subcontractors must provide a 12-digit Unique Entity ID and certify their debarment status under FAR 52.209-6 if the subcontract exceeds 30,000 dollars. Strict adherence to government and Department of Labor guidance regarding the protection of sensitive and proprietary information is required.
Sierra Nevada Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 6 days
NAICS: 238220
New
2026-Clearfield-Bldg E8 Welding HVAC
Solicitation # 2026- Clearfield- Welding Bldg. E8 HVAC Replacement
Management & Training Corporation (MTC) is seeking fixed-price lump sum bids for a subcontracting opportunity to replace a 20hp motor connected to the rooftop HVAC system at the Clearfield Job Corps Center in Clearfield, Utah. The scope of work includes providing all labor, supervision, materials, equipment, and permits necessary for the removal and replacement of the motor, ensuring the system is fully operational upon completion. Deliverables include the successful installation and the provision of startup, testing, and commissioning documentation. All work must comply with federal, state, and local codes, OSHA requirements, and site safety procedures. Bids are due by September 19, 2026, at 3:00 PM MST and must be submitted via email to Patricia Willover and Nelson Dar. To be considered, bidders must conduct a physical site visit, sign the attendance roster, and submit a bid bond guarantee. The submission package must include a signed MTC Bid for Lump Sum Contract form and a detailed cost breakout on company letterhead. Award will be based on overall best value. The project is a small business set-aside and requires contractors to provide a 12-digit Unique Entity ID and a 9-digit Tax ID. Compliance with Davis-Bacon prevailing wage rates for Davis County, Utah, is mandatory. Additionally, the successful contractor must provide performance and payment bonds from a surety company with at least an A- rating within five business days of an Intent to Award letter. Payment will be processed via pay applications using AIA G702 and G703 forms based on a previously submitted Schedule of Values.
Management & Training Corporation

POSTED

about 3 hours ago

DEADLINE

in 7 days
NAICS: 238220
New
CBP7664 Wellness HVAC Compressor Replacement
Solicitation # CBP7664
Management & Training Corporation is seeking bids for a subcontracting opportunity to replace a failed HVAC/refrigeration compressor at the Wellness facility of the Sierra Nevada Job Corps Center in Reno, Nevada. This fixed-price, single lump sum contract requires the contractor to provide all labor, materials, and equipment to execute a five-phase process including preparation, demolition, installation of an OEM-specified compressor, system testing and commissioning, and final closeout. The project must restore full cooling capacity and operational efficiency while adhering to EPA Section 608 regulations for refrigerant recovery. The work must be completed within thirty consecutive business days following the receipt of a written Notice to Proceed. Bids will be evaluated based on overall best value, considering price, quality, and delivery schedule. The estimated price range is between 0 and 25,000 dollars, though bids equal to or greater than 25,000 dollars require a 20 percent bid bond guarantee and subsequent performance and payment bonds from an A-rated surety company. Submission requirements include a bid sheet, proof of insurance, three comparable project references, and a completed supplier packet containing a W-9 and self-certification of business size under FAR 52.219-8. Contractors must comply with Davis-Bacon Act prevailing wage rates for Washoe County and adhere to FAR 52.204-10 reporting if the award reaches 40,000 dollars. Final payment is contingent upon a successful final inspection and the submission of a notice of final completion, certified payroll reports, and operation and maintenance manuals.
Sierra Nevada Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 11 days
NAICS: 238220
New
This is a subcontracting opportunity to replace a chiller in McKinney, TX.
Solicitation # subcontracting-opportunity-replace-chiller-mckinney-tx
Serrato Corporation is seeking subcontractors to replace a failing air-cooled chiller in Building 214/215 at the North Texas Job Corps Center in McKinney, Texas. The project requires the installation of a like-kind, similar model to the existing 246-ton Carrier unit, including demolition and disposal of the old equipment. The scope of work extends to building automation controls via the installation of a JACE 9000 central integration point with a graphical user interface, the installation of four 3-way control valves, and the replacement of three out of four air handler VFDs. Additionally, the contractor must clean and inspect four air handling units, including blower motors, wheels, coils, and screens. Bids must be submitted by September 18, 2026, and must remain valid for 90 days. Required submission documentation includes manufacturer equipment specifications, Form 1413 for Davis-Bacon Act certified payroll for work exceeding 2,000 dollars, and a Certificate of Liability Insurance naming Serrato Corporation as the holder. Insurance minimums include 1 million dollars for Commercial General Liability and Comprehensive Automobile Liability, and 500,000 dollars for Employers Liability. The contractor is responsible for performing startup and operational tests and providing all warranty information and final job documentation. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB.
Serrato Corporation DBA North Texas Job Corps

POSTED

about 3 hours ago

DEADLINE

in 6 days
NAICS: 238220
New
Main Building 1 Wing 5 – Six Rooftop HVAC Unit Replacement – Glenmont Job Corps Center
Solicitation # S26-010
The Glenmont Job Corps Center is soliciting proposals from qualified, New York State licensed contractors for the replacement and installation of HVAC equipment within Main Building No. 1, Wing 5 (Education Building) in Glenmont, New York. The project involves replacing two 7.5-ton split-system units for the auditorium, one 6-ton rooftop unit for the library and computer lab, and one 12.5-ton rooftop unit for the north and east wing classrooms. Additionally, the scope includes installing four 2-ton ductless mini-split heat pump systems, removing a window air-conditioning unit, and abandoning two 5-ton rooftop units in place. Comprehensive associated work encompasses demolition, roof curbs and penetrations, ductwork, refrigerant and condensate piping, electrical work, controls, structural roof evaluations, and fire alarm and duct smoke detector installations, concluding with testing, balancing, and commissioning. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and Veteran-Owned Small Businesses. The project must be completed within 210 calendar days following the written Notice to Proceed, and the facility will remain operational throughout the construction period. Key deadlines include a pre-proposal site walkthrough on September 10, 2026, with vendor questions due by September 14, 2026. Final proposals must be submitted by September 21, 2026, at 4:00 PM ET. All work must comply with applicable New York State codes, safety regulations, and environmental requirements.
Adams and Associates, Inc.

POSTED

about 3 hours ago

DEADLINE

in 9 days
NAICS: 238220
New
Replace HVAC Systems in the following buildings on our campus –1.) 1091 – Glazing/Welding/Heavy Mechanics Bldg
Solicitation # 26-140
Adams and Associates, Inc. is soliciting a single lump sum contract to replace a failing 10-ton gas-fired packaged HVAC unit at the Atterbury Job Corps Center in Edinburgh, Indiana, specifically within Building 1091. The project requires the installation of a new 12.5 SEER packaged unit utilizing non-R22 refrigerants, such as R-410A or R-454B, while reusing existing ductwork, thermostat wiring, and electrical disconnects. The contractor must leave the old unit at the maintenance building for parts and provide labeled recovered refrigerant to the facility. Proposals are due by October 5, 2026, and require a mandatory site visit on September 23, 2026. Award will be based on best value, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Eligible bidders must possess a valid Indiana Contractor's License, an active SAM.gov registration with a Unique Entity ID, and provide proof of specific automobile and workers compensation insurance naming Adams and Associates, Inc. as an additional insured. The contractor must comply with EPA, OSHA, and Davis Bacon Act wage determinations. Deliverables include a sequenced construction schedule within 10 days of the notice to proceed, a one-year workmanship guarantee, and manufacturer product warranties. Final payment is contingent upon a successful substantial completion walk-through, submission of a completed SF 1413, and the release of liens from all subcontractors.
Adams & Associates, Inc.

POSTED

about 3 hours ago

DEADLINE

in 22 days
NAICS: 238220
New
Replace HVAC Systems in the following buildings on our campus –1.) ABL Dormitory
Solicitation # 26-141
Adams & Associates, Inc., operating for the U.S. Department of Labor, is soliciting a single lump sum contract to replace HVAC systems at the Atterbury Job Corps Center's ABL Dormitory in Indiana. The project involves replacing existing R-22 Bryant air cooled condensing units, including an 8.5-ton unit for common areas and 4-ton and 3.5-ton units for dormitory wings A, B, C, and D, with new 12.5 SEER packaged units utilizing non-R22 refrigerants such as R-410A or R-454B. The scope requires the reuse of existing electrical disconnects, ductwork, and thermostat wiring, and mandates that all recovered refrigerant be labeled and left on-site. Eligible bidders must be registered in SAM.gov with a valid Unique Entity ID and hold a valid State of Indiana contractor's license. A mandatory site visit is scheduled for September 23, 2026, with final proposals due by October 5, 2026. Award decisions will be based on best value, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Contractors must comply with EPA and OSHA regulations, Davis-Bacon Act wage determinations, and provide specific insurance coverages, including automobile liability and workers' compensation. Final payment is subject to net 30 terms and is contingent upon the submission of a completed SF 1413, certified payroll records, and a release of liens.
Adams & Associates, Inc.

POSTED

about 3 hours ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The Studios Energy South Chiller Expansion project at 397 Cypress Drive in Lake Buena Vista, Florida, entails a comprehensive upgrade to the existing chiller plant, involving the installation of new mechanical, electrical, and infrastructure systems. The scope includes one owner-furnished chiller, two chilled water pumps, and two condenser water pumps, each with all associated piping, controls, and appurtenances. A new concrete cooling tower basin and separate pump pit are to be constructed, with field erection of the cooling tower performed by the manufacturer TEI, requiring close coordination by the contractor. A 24-inch underground equalizer pipe will link the new basin to the existing one, and the basin must be waterproofed. Additional systems include a separate alarmed fire protection branch connected to the existing dry valve system, new make-up water and overflow drain lines, lighting, and lightning protection for the new cooling tower and pump area. Site work encompasses the removal and relocation of an existing yard drain, demolition and rebuilding of sidewalks along the east and south perimeter, and adjustment of the fenceline to accommodate the expansion. All work must be executed at the designated site, with electrical systems fully supporting the new equipment. The solicitation, identified as ITB # C007094, was issued by the Central Florida Tourism Oversight District on May 27, 2026, with bids due by June 26, 2026. Proposals must be submitted electronically through the PlanetBids platform, and vendors are required to register on that system to access documents and submit bids. A mandatory pre-bid meeting is scheduled for June 10, 2026, at the Bolt Conference Room in Lake Buena Vista, and attendance requires RSVP via PlanetBids. The project falls under NAICS code 40151500 and is open to local vendors, veteran-owned small businesses, and opportunity zone businesses, which may receive bid preferences. No contract value is disclosed, and while the scope of work is detailed, specific evaluation factors, award criteria, inspection procedures, packaging requirements, or special contract clauses are not included in the available documentation. All work must comply with the performance requirements outlined in the solicitation, and the contractor is solely responsible for managing coordination with TEI for the cooling tower installation and ensuring integration with existing systems.

General Info

Expansion of SES Chiller Plant with new equipment, concrete basin, electrical systems, and site modifications.

Agency

Central Florida Tourism Oversight DistrictView Agency

NAICS

238220 - Plumbing, Heating, and Air-Conditioning ContractorsView NAICS

Place of Performance

FL, USA

Set-Aside

NONE

Documents

(1)

Bid Announcement C007094 Studios Energy South Chiller Expansion

PDFrfb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCentral Florida Tourism Oversight District
Contacts1 person available
OfficeN/A
Organization / Agency
Central Florida Tourism Oversight District
View Agency Profile
Office AddressN/A
Contacts

Full Description

Show more
This project includes the expansion of the Studios Energy South (SES) Chiller Plant, including the installation of new chillers, pumps, cooling tower systems, electrical and fire protection systems, associated piping and controls, site modifications, and related infrastructure improvements.The construction site is located at 397 Cypress Drive – Lake Buena Vista, FL 32830.SCOPE OVERVIEW:A. Installation of new owner-furnished chiller and all associated piping, appurtenances, and controls;B. Installation of (2) new owner-furnished chilled water pumps and all associated piping, appurtenances, and controls;C. Installation of new concrete cooling tower basin, separate concrete pump pit, and all cooling tower piping, appurtenances, and controls. Cooling tower shall be field-erected by cooling tower manufacturer (TEI). Contractor shall be responsible for coordinating the installation of cooling tower with TEI. A 24" diameter underground equalizer pipe shall connect the new basin with the existing basin; new pipe shall connect to pipe installed in a previous project;D. Installation of (2) new owner-furnished condenser water pumps and all associated piping, appurtenances, and controls;E. All electrical systems supporting the above items #1-4 as well as lighting at new cooling tower and pump area and lightning protection at new cooling tower and pump area;F. New make-up water and overflow drain systems at new cooling tower;G. New fire protection system for new cooling tower. Fire protection system shall be a separate, alarmed branch from the existing dry valve system;H. Removal and relocation of existing yard drain where new cooling tower basin is to be installed;I. Removal of existing sidewalks along the east and south perimeter of the cooling tower yard and relocation of the fenceline;J. Waterproofing of new cooling tower basin

More opportunities from Central Florida Tourism Oversight District

Same awarding agency

NAICS: 237110
SLED
Lift Station #46 Rehabilitation
Solicitation # C007134
The Central Florida Tourism Oversight District has issued solicitation C007134 for the rehabilitation of Lift Station 46 in Florida. This comprehensive infrastructure project involves the replacement of discharge piping, risers, pumps, and pump discharge connections, as well as the cleaning, repair, relining, and coating of the wet well. The scope includes the installation of a new diesel-powered emergency pump and controls, the replacement of check and plug valves, and the relocation of above-grade piping. Additionally, the project requires the installation of fall protection systems and a new telemetry system for 24/7 monitoring and communication with the RCES Control Room, alongside modifications to the SCADA system and various instrumentation components such as flow meters and level measurement equipment. Site work consists of the demolition of existing electrical, sanitary force main, and potable water infrastructure, the construction of a new access driveway with concrete curb cuts, and the replacement of affected curb and gutter. The contractor must also re-grade the site to raise the lift station and surrounding area by approximately one foot from the existing grade. This solicitation was posted on September 4, 2026, with a response deadline of October 5, 2026. All interested bidders must be registered through the PlanetBids platform to access supporting documents and submit electronic bids. Primary contact for the project is Karina Rodrigues, with procurement support provided by Sara Medina.
Water and Sewer Line and Related Structures Construction

POSTED

8 days ago

DEADLINE

in 23 days
View Details
NAICS: 561730
SLED
Mowing and Weed Control Services- Rapid Infiltration Basins
Solicitation # C007111
The Central Florida Tourism Oversight District is seeking a qualified contractor for mowing and weed control maintenance of its Rapid Infiltration Basins (RIB). The contract is structured for an initial three year period with an optional two year renewal. The scope of work includes mowing grass areas within RIB fencing and non solar grass areas 39 cycles per year, utilizing a tractor and batwing attachment. Additional requirements include raking and aerating RIB sand bottoms to a depth of 6 to 12 inches twice monthly, pruning trees for equipment access, and performing monthly maintenance on storm related tree issues affecting chain link fences. Weed control services involve spraying RIBs and eight compliance wells with specific herbicides. Roundup is required for meter sets and the top portion of the RIB liner, while Rodeo or a similar aquatic herbicide containing at least 41 percent Isopropyl amine salt of glyphosate must be used for the bottom of the RIB liner. Herbicide application occurs 28 times per year, with a weekly schedule from April through September and specific applications between October and March. Contractors are prohibited from driving utility vehicles on HDPE RIB liners and are financially responsible for any damages resulting from weed control services. Bids for solicitation C007111 must be submitted electronically via the PlanetBids platform by September 24, 2026.
Landscaping Services

POSTED

8 days ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS