Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on April 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Subcontractor for Specialty Technical Disciplines

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
RFP #27-035 Hydraulic Modeling & system Analysis Program
Solicitation # 27-035
The City of Albany, Georgia, is soliciting competitive sealed proposals under RFP #27-035 for a qualified firm to develop and implement a comprehensive hydraulic modeling and system analysis program for its water distribution system. The primary objective is to create a fully functional model that the City can maintain internally for operations, planning, and emergency response without ongoing consultant reliance. The scope includes system analysis for pressures, fire flow, storage, pumping, outages, future growth, and capital improvement planning. To ensure platform independence, the final model must be delivered in its native software format as well as an EPANET-compatible format. Proposals must be submitted by 5:00 PM on November 23, 2026, to the Procurement Division in Albany, Georgia. Submissions must include one original and six copies on company letterhead, signed by an authorized official, and accompanied by a Certificate of Non-Collusion, a Governing Law and Venue form, and an Addendum Acknowledgement Form. Award will be based on a weighted evaluation of experience and qualifications (35%), project approach and understanding (30%), references and portfolio (25%), and a detailed fee proposal (10%). The selected contractor must maintain liability insurance of at least $1,000,000 per occurrence and $2,000,000 annual aggregate, as well as workers compensation and employers liability of at least $1,000,000. Compliance with the Georgia Security and Immigration Compliance Act and the Federal Work Authorization Program is required. Payment terms are Net 30, and the contract is subject to multi-year contract clauses pursuant to OCGA 36-60-13. All equipment provided must be the latest model and composed of new parts, with the City reserving the right to reject any materials that do not meet specifications.
City of Albany

POSTED

about 6 hours ago

DEADLINE

in 26 days

AI Contract Overview

Show more

This contract is for the engagement of subcontractors providing specialized technical expertise on an as-needed basis, focusing on areas such as acoustics, hazardous materials abatement, and geotechnical engineering. It is managed by the Department of the Interior’s Dsc Contracting Services Division, under the NAICS code 541330, which pertains to engineering services. The solicitation was posted on April 21, 2026, with a response deadline set for June 21, 2026. The contract type is classified as a subcontract, allowing for flexible access to niche technical disciplines required for various projects. No specific location details or set-aside designations have been provided, indicating a potentially broad geographic scope and open competition. This arrangement aims to provide the Department of the Interior with access to specialized skills that support their operational and project needs in relevant technical fields.

General Info

Subcontract for specialized technical expertise in acoustics, hazardous materials, geotechnical engineering.

NAICS

541330 - Engineering Services

Place of Performance

CO

Set-Aside

NONE

Documents

This scope was carved out of 140P2026R0067.

The full solicitation package (8 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

C--INTERMOUNTAIN/PACIFIC WEST Region Architectural and Engineering (A&E) Services

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Provision of niche expertise such as acoustics, hazardous materials abatement, or geotechnical engineering on an as-needed basis.

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. A critical requirement is that the existing plant must remain in permitted operation until the new facility is accepted by the government, and the contractor must provide a 12-month operational support period. The contract is a firm-fixed-price acquisition with a magnitude exceeding 100 million dollars. The mandatory period of performance is 1095 calendar days, scheduled from February 1, 2027, to February 1, 2030. Award will be based on a multi-factor, best-value tradeoff process evaluating technical experience, technical approach, key personnel experience, and price. Required deliverables include a detailed commissioning plan covering startup sequencing, operator training, and regulatory coordination. The contractor must furnish performance and payment bonds and comply with union prevailing wage rates, Department of the Interior cybersecurity requirements, and ADA/ABA accessibility standards.
Sewage Treatment Facilities

POSTED

about 10 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is a Small Business Set-Aside, Firm-Fixed-Price contract issued by the National Park Service for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. The project, with an estimated construction magnitude between $1 million and $5 million, involves three primary components: the selective demolition and installation of a new weatherable rigid vinyl sheet pile wall with tie rods and a deadman wall, the eastward extension of the wall using structural FRP composite sheet piles, and comprehensive site restoration including excavation, backfilling, sodding, limestone riprap installation, and spartina sea grass restoration. The mandatory performance period is 259 calendar days, with work required to begin within 10 days of award. The government will utilize the Best Value Continuum Tradeoff Process for award, where non-price factors—specifically technical approach, schedule, and management approach—are significantly more important than price. Contractors must adhere to strict environmental protection protocols to protect marine mammals and endangered species, and comply with the Davis-Bacon Act and various ASTM standards for recycling and packaging. Key requirements include the submission of a Contractor Quality Control plan, the assignment of specific key personnel, and the provision of performance and payment bonds. Invoicing must be processed electronically through the U.S. Department of the Treasury's Invoice Processing Platform following a draft review by the Contracting Officer's Representative.
Other Heavy and Civil Engineering Construction

POSTED

6 days ago

DEADLINE

in 16 days
View Details
NAICS: 237310
Federal
Z--BRCA 310427 Southbound Shuttle Stop
Solicitation # 140P2026R0065
Solicitation 140P2026R0065 is a small business set-aside for the construction of the Southbound Shuttle Stop at Bryce Canyon National Park, Utah. Managed by the National Park Service Denver Service Center, this firm-fixed-price contract has an estimated value between $1,000,000 and $5,000,000. The scope of work includes shuttle stop improvements, the addition of lanes, culvert installation, trail realignment, retaining wall construction, ADA ramp and sidewalk installation, and the placement of shelters and MUTCD-compliant signage. Due to the project's location, the contractor must implement protective measures for the adjacent UT Prairie Dog Habitat and ensure all equipment is clean and free of contaminants. The performance period is scheduled from May 1, 2027, to September 28, 2027, with a total duration of 150 calendar days following the notice to proceed. Award will be determined using the Best Value Continuum Tradeoff Process, evaluating technical approach, schedule, project experience, key personnel, and past performance alongside proposed pricing. Requirements include the submission of bid, performance, and payment bonds, compliance with Davis-Bacon Act wage determinations, and adherence to OSHA safety standards. Proposals must be submitted electronically in separate technical and price volumes, with a final response deadline of November 3, 2026.
Highway, Street, and Bridge Construction

POSTED

12 days ago

DEADLINE

in 6 days
View Details
NAICS: 237110
Federal
Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment
Solicitation # 140P2026R0091
Solicitation 140P2026R0091 is a firm-fixed-price construction contract issued by the National Park Service Denver Service Center to rehabilitate the Rainshed and Water Treatment System at Hawaii Volcanoes National Park. The project scope includes the rehabilitation of the rainwater catchment and water treatment systems, the replacement of Building 43 with a new metal building, and the replacement of Building 241 with a new open-air and CMU structure. Additional optional requirements include replacing the perimeter fence, repairing the water treatment system, and replacing ground catchment pavement. The project has a mandatory performance period of 610 calendar days, with primary CLINs scheduled from November 1, 2026, to July 3, 2028. The government will award the contract using a best value tradeoff process, evaluating non-price factors such as project experience, technical approach, management approach, and construction schedule against proposed pricing. Bidders must comply with the Davis-Bacon Act for prevailing wages and adhere to Buy American Act and Build America Buy America standards. Technical requirements include ADA compliance, the implementation of a Quality Control Plan, and adherence to specific environmental standards regarding ozone-depleting substances and recycled content. Due to the site's nature, the project involves Section 106 mitigation for historic buildings and requires careful construction phasing to ensure water production is not compromised. Proposals must be submitted electronically, and the awardee will be required to provide performance and payment bonds within 10 days of award.
Water and Sewer Line and Related Structures Construction

POSTED

15 days ago

DEADLINE

in 9 days
View Details
NAICS: 237310
Federal
Z--YELL 338223 - Bridge Preservation
Solicitation # 140P2026R0073
Solicitation 140P2026R0073 is a Small Business Set-Aside for bridge preservation services at Yellowstone National Park, Wyoming, managed by the National Park Service Denver Service Center. The project involves the rehabilitation of three specific bridges: Lava Creek, Thumb Creek, and an Unnamed Creek bridge. The scope of work includes concrete spall and structural repairs, crack sealing, stone masonry repointing, bridge expansion joint maintenance, painting of railings, and the application of epoxy overlays via hydro-demolition. Additional requirements include erosion repair, pavement markings, and strict traffic control. The anticipated period of performance is 155 calendar days from the Notice to Proceed, with an estimated contract value between $1 million and $5 million. The contract will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, project experience, key personnel, and past performance—are significantly more important than price. Required key personnel include a Site Superintendent with at least five years of experience and OSHA 30 certification, and a Traffic Control Supervisor with three years of experience meeting MUTCD standards. Contractors must adhere to strict work hour restrictions from 7 AM to 7 PM and comply with environmental protections for wildlife and cultural resources. Performance and payment bonds are required at 100 percent of the contract price, and the project is subject to Davis-Bacon Act labor standards. Proposals are due by October 30, 2026.
Highway, Street, and Bridge Construction

POSTED

15 days ago

DEADLINE

in 2 days
View Details
NAICS: 237110
Federal
Y--GRTE 237343 - Rehab 4 Lazy F Ranch
Solicitation # 140P2026R0098
Solicitation 140P2026R0098 is a Total Small Business Set-Aside for the rehabilitation of the historic 4 Lazy F Ranch in Grand Teton National Park, Wyoming, to provide employee housing. The project scope includes the comprehensive rehabilitation of one lodge, eight cabins, one garage, two outbuildings, and a water well structure. Key technical requirements involve structural repairs, historic preservation, and the installation of new potable water and wastewater systems, including a sanitary sewer collection system and lift station. The project is estimated to exceed 10 million dollars and has a mandatory negotiable performance period of 170 calendar days, with work beginning within 10 days of award. The procurement will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—technical approach, project experience, schedule, and past performance—are collectively equal in importance to price. Contractors must adhere to strict environmental and safety standards, including the management of lead-based paint and asbestos, compliance with the Davis-Bacon Act, and mitigation of impacts on bald eagle nesting and roosting bats. Proposals must be submitted electronically by November 20, 2026, and must include a detailed technical approach and a phasing plan to minimize park operational disruptions. Required insurance includes general liability of 500,000 dollars and employer liability of 100,000 dollars.
Water and Sewer Line and Related Structures Construction

POSTED

23 days ago

DEADLINE

in 23 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS