This Subcontract opportunity from Washington was posted on August 20, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Subgrade and Soil Stabilization

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Port of Vancouver USA is seeking a subcontractor for a project focused on subgrade and soil stabilization. The scope of work involves the preparation and stabilization of subgrade surfaces, specifically requiring the placement of modified subbase material along with soil compaction or the installation of geotextiles. This opportunity is categorized under NAICS code 238990. Interested parties must submit their responses by the deadline of September 4, 2025, following the posting date of August 20, 2025.

General Info

Port of Vancouver seeks subgrade and soil stabilization subcontractor by September 4, 2025.

Documents

This scope was carved out of 25-67.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

2025 Maintenance Dredging

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • MAIN WASTEWATER TREATMENT PLANT SECONDARY REACTORS REHABILITATION,PHASE 2, SPECIFICATION SD-462Open now, due in 15 days
  • PURIFIED WATER REPLENISHMENT SAN JACINTO VALLEY ADVANCED WATER PURIFICATION FACILITY SPECIFICATION NO. 1472WOpen now, due in 2 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Port of Vancouver USA
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Preparation and stabilization of subgrade surfaces, including placement of modified subbase material and soil compaction or geotextile installation.

More opportunities from Washington → Port of Vancouver USA

Same awarding agency

NAICS: 237110
SLED
Terminal 4 Pond Polishing System
Solicitation # 26-64
The Port of Vancouver is soliciting bids for Project 26-64, the Terminal 4 Pond Polishing System, which involves retrofitting the existing T4 Pond stormwater treatment system. The scope of work includes the installation of a permanent aboveground polishing system featuring a lift station with two submersible pumps, a valve vault, a concrete equipment pad, and associated water conveyance piping. The project requires excavation, trenchless trenching, dewatering, and electrical improvements to treat runoff in accordance with SWMMWW BMP C251 and ISGP requirements before discharging into the Columbia River. Additionally, chemical addition infrastructure per C250 BMP requirements will be installed for future use. The engineer's estimate for the project ranges from 4,370,000 to 4,830,000 USD. Bids are due by November 19, 2026, at 2:00 PM, and will be awarded to the lowest responsible bidder. Bidders must provide a bid deposit of 5 percent of the bid amount via cashier's check or surety bond and must comply with Washington State Prevailing Wage Rates for Clark County. Mandatory requirements include a signed Safety Affidavit, contractor registration per RCW 18.27, and state excise tax registration. The contract is a unit price agreement and incorporates WSDOT, APWA, and Port of Vancouver General Special Provisions. Performance and payment bonds are required, and a 5 percent retainage will be held from progress payments, which are processed within 30 days of approval.
Water and Sewer Line and Related Structures Construction

POSTED

about 1 month ago

DEADLINE

in 2 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS