Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Sump 111 Site Improvements (W14130621)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sump 111 Site Improvements project (W14130621) is a construction effort managed by the City of Sacramento Department of Utilities located at 515 Riverine Way, Sacramento, California. The scope of work involves expanding the existing site 24 feet to the north, re-grading the slope to a 2:1 ratio, and improving site drainage. Key infrastructure upgrades include the installation of new pumps, motors, a transformer, a perimeter fence, and a new electrical building with switchgear. Additionally, the project requires modifications to pump bays, the removal of two trees, and the rehabilitation of existing outfalls using a spray-applied liner. The project is classified as a forecast and is governed by the California Environmental Quality Act, specifically qualifying for categorical exemptions under sections 15301(b) and 15303(d) as minor alterations to existing public utility structures. Administrative oversight is provided by Project Manager Tom Dugan and Senior Planner Charles Thomas Tschudin. While the project is identified under NAICS code 237110, specific contract values, performance timelines, and federal acquisition regulation clauses are not provided in the current documentation. Submission of required documentation, including the Notice of Exemption and CDFW No Effect Determination, is handled through the City of Sacramento Community Development Department.

General Info

Sacramento expands Sump 111 with new infrastructure, regrades slope, removes two trees, and qualifies for CEQA exemption.

Agency

California → City of Sacramento

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

515 Riverine Way, Sacramento, CA, 95811

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Sump 111 Site Improvements W14130621

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Sacramento
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Sacramento
Office AddressN/A
Contacts
Charles Thomas TschudinSenior Planner
Tom DuganProject Manager

Full Description

Show more
This project consists of the expansion of the existing site 24 feet to the north, re-grade the slope 2:1, install new pumps and motors, a new electrical building and switchgear, a new transformer, a new perimeter fence, pump bay modifications and site drainage improvements and the removal of two trees. The project will also rehabilitate the existing outfalls by utilizing a spray-applied liner.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project in CA
Solicitation # jcsd-intervalley-pipeline-project-ca
The JCSD Intervalley Pipeline Project in Fontana, California, involves the demolition, furnishing, installation, testing, and operationalization of approximately 3.3 miles of 42-inch cement mortar lined and coated steel potable water transmission pipeline. The scope of work includes trenchless crossings, air release valves, blowoff assemblies, valves, fittings, and connections to existing water facilities, as well as the construction of flow control facility components and site improvements. Additional requirements encompass pavement removal and restoration, traffic control, utility coordination, disinfection, startup, and commissioning to ensure a complete and operational system. Garney Pacific, Inc. is seeking subcontractor and supplier quotes for various trades, including steel pipe welding, trenchless construction, electrical and instrumentation, and the supply of aggregates, ready-mix concrete, and steel fittings. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid. Quotes are due by September 18, 2026, at 2:00 PM PT, and should be directed to Alyssa Callaway. This solicitation is open to DBE, MBE, WBE, and SBE set-asides under NAICS code 237110.
Garney Pacific, Inc.

POSTED

about 11 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is soliciting bids for a green-street retrofit project located on South Marsham Street between Gravel Lane and US Route 50 in Downtown Romney, West Virginia. The scope of work involves the targeted retrofit of approximately 343.59 linear feet of roadway to implement green infrastructure. Key deliverables include the installation of approximately 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and the planting of six native trees and approximately 345 native plants or approved equivalents. The project is designed to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area and requires necessary drainage, underdrain, inlet, pipe, and downspout work, as well as ADA-compliant curb, sidewalk, apron, crossing, and traffic-calming improvements. This solicitation specifically seeks MBE, DBE, and WBE subcontractors and suppliers, with a strong emphasis on small business concerns, including veteran-owned, service-disabled veteran-owned, HUBZone, disadvantaged, woman-owned, and minority-owned businesses. To accommodate the project scale, small businesses are encouraged to form consortiums. Bids must be submitted by September 17, 2026, at 4:00 P.M. Primary points of contact for this opportunity are Jennifer Wilson and Jonah Leith. The project concludes with final stabilization, cleanup, and restoration of the site.
Harbel, Inc.

POSTED

about 11 hours ago

DEADLINE

in about 21 hours
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various contractor-furnished and Metropolitan-furnished valves, 54-inch and 145.5-inch diameter tie-ins, four surge tanks, two valve vaults, and an air compressor yard structure. Additional requirements include drainage improvements, electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. Bids are due by September 29, 2026. The project emphasizes the inclusion of M/W/DBE subcontractors, with James W. Fowler Co. offering assistance in obtaining bonding, insurance, and necessary equipment. Quality control testing is a required component of the subcontract pricing, and the utilization of apprentices is encouraged. All negotiations must be finalized 24 hours prior to the bid opening.
James W. Fowler Co.

POSTED

about 11 hours ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS