Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Connecticut was posted on June 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Supply of Liquid Aluminum Sulfate (Alum)

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract involves the supply of 20,000 gallons of liquid aluminum sulfate (alum) with a concentration of 8.3% Al₂O₃, intended for use in coagulation processes. The alum must be NSF-certified to ensure it meets safety and quality standards, and it is required to be delivered in corrosion-resistant, plastic-lined totes to prevent contamination and maintain integrity during transport. The solicitation was posted on June 5, 2026, with a response deadline of June 25, 2026. The contract is classified as a subcontract under the NAICS code 325182, which pertains to industrial chemical manufacturing. It is issued by the Water agency associated with the state of Connecticut. While specific location details for the place of performance and point of contact are not provided, the procurement process is accessible online, allowing interested parties to review additional information and submit their proposals accordingly.

General Info

Supply of 20,000 gallons NSF-certified 8.3% alum in corrosion-resistant totes, Connecticut, June 2026.

Agency

Connecticut → WaterView Agency

NAICS

325182 - Carbon Black ManufacturingView NAICS

Place of Performance

CT, USA

Set-Aside

NONE

Documents

This scope was carved out of B026-55.

The full solicitation package (11 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

B026-55 Chemicals

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyConnecticut → Water
ContactsNo contacts available
OfficeN/A
Organization / Agency
Connecticut → Water
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Provide 20,000 gallons of liquid alum (8.3% Al₂O₃) for coagulation. Must be NSF-certified and delivered in corrosion-resistant, plastic-lined totes.

More opportunities from Connecticut → Water

Same awarding agency

NAICS: 237990
SLED
B027-03 Merimere Dike Seepage Control
Solicitation # B027-03
The City of Meriden is soliciting bids for the Merimere Dike Seepage Control project, which involves subsurface pressure injection grouting at the Merimere Dike on Reservoir Road in Meriden, Connecticut. The scope of work encompasses all supervision, labor, materials, and equipment necessary for site preparation, the execution of the grouting program under and around the existing dike, and the subsequent restoration of the site to preconstruction conditions. This project is funded by an Environmental Protection Agency grant of 3,240,000 dollars, with approximately 2,889,750 dollars specifically allocated for construction. The contract is governed by EJCDC C-700 Standard General Conditions and requires the contractor to adhere to the Build America, Buy America requirements of the Infrastructure Investment and Jobs Act of 2021. Bids must be submitted electronically via the City eProcurement Portal by 11:00 am on October 6, 2026. Each bid requires a bid bond for 10 percent of the bid amount, and the selected contractor must provide performance and payment bonds for 100 percent of the contract price. Liquidated damages for project delays are set at 1,000 dollars per day. Compliance with both the Federal Davis-Bacon Act and Connecticut state prevailing wage laws is mandatory, with the contractor required to pay the higher of the two rates. Additionally, the contractor must meet comprehensive insurance requirements, including general liability, automobile, workers compensation, and professional liability coverage, and must maintain project signage featuring the EPA logo.
Other Heavy and Civil Engineering Construction

POSTED

14 days ago

DEADLINE

in about 1 month
View Details