Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Surfers Beach Pilot Project Monitoring, Wave Instrument Deployment

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Surfers Beach Pilot Project Monitoring, Wave Instrument Deployment is a forecast project managed by the San Mateo County Harbor District in California. The primary objective is the collection of oceanographic wave and water level data through the deployment of a Sofar Ocean Spotter Wave Buoy and radar equipment. The buoy is a small, free-floating instrument that will be positioned approximately 2000 feet offshore of Surfer's Beach in Half Moon Bay, specifically at coordinates 37°29'47"N, 122°28'29"W. The project involves the use of a small vessel for deployment, retrieval, and periodic servicing, and it requires no permanent installation, grading, or construction. The project is classified under NAICS code 541330 and is managed by General Manager James Pruett. From a regulatory standpoint, the project has been granted a Categorical Exemption under CEQA Guidelines Section 15306, as the information collection activities are determined to cause no significant environmental disturbance. A formal Notice of Exemption was filed on October 5, 2025, certifying that the project complies with California Public Resources Code sections 21083 and 21110. No specific contract value, period of performance, or detailed evaluation factors have been disclosed in the available documentation.

General Info

Deploying offshore buoy and radar for continuous ocean data collection with no formal pricing or end date.

Agency

California → San Mateo County Harbor District

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Approximately 2000 feet offshore of Surfer’s Beach and 900 feet off the E. breakwater, CA, 94018

Set-Aside

NONE

Documents

(2)

Notice of Exemption for Surfers Beach Pilot Project Monitoring

PDFnotice-of-exemption

NOE Wave Buoy CEQA Exemption Memorandum

PDFother

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Mateo County Harbor District
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Mateo County Harbor District
Office AddressN/A
Contacts
James PruettGeneral Manager

Full Description

Show more
Deployment of buoy and radar for wave and water level data collection.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is soliciting sub-quotes for the Scattergood GS Units 1 and 2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing professional and technical services such as civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as BIM/3D modeling, commissioning and startup planning, and cathodic protection system design. Additional requirements include utility locating, potholing, geotechnical and geophysical investigations, LIDAR surveying, land surveying, and comprehensive environmental services including assessments, permitting support, and hazardous materials surveys. This solicitation specifically targets Disadvantaged Business Enterprises, including MBE, WBE, and OBE certified firms. Interested bidders must contact Lead Estimator Joe Bockelman to receive an Invitation to Bid via the Building Connected system. Qualified respondents must hold a valid California Contractor license, provide acceptable insurance, and secure bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Bidders must also demonstrate the ability to maintain labor harmony, as Kiewit is signatory to several collective bargaining agreements. The bid date is September 11, 2026, and plans and specifications are available for review at Kiewit's Costa Mesa office.
Kiewit Infrastructure West Co.

POSTED

about 13 hours ago

DEADLINE

in 14 days
View Details
NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to address sewer system deficiencies in southwest Bend by extending a gravity sewer mainline, decommissioning existing pump stations, and installing service laterals for properties currently using onsite septic. The scope may also include transportation improvements, such as ADA curb ramp and curb design and roadway reconstruction. This effort is funded by the Clean Water State Revolving Fund through the Oregon Department of Environmental Quality, with a total design and construction budget of 3,875,000 dollars. The City of Bend will select a consultant based on a scoring system evaluating project understanding, team qualifications, and firm experience, with an optional interview phase. Key deliverables include a preliminary engineering report, a public outreach plan, and construction contract documents at 30, 60, 90, and 100 percent completion, culminating in record drawings. The goal is to have the project advertised for construction services in Fall or Winter 2027. Parametrix is actively soliciting firms with recognized federal, tribal, state, local, or independent DBE certifications as part of a good faith effort to include diverse business participants. Proposals are due by September 29, 2026.
Parametrix

POSTED

about 13 hours ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS