Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from California was posted on June 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Surveying & Site Data Collection

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract entails performing comprehensive topographic, boundary, and utility surveys to facilitate design and permitting processes. Key deliverables include providing georeferenced data, conducting ALTA/NSPS surveys, and verifying as-built conditions, ensuring accuracy and compliance with industry standards. The contract falls under the NAICS code 541370, typically related to surveying and mapping services, and is managed by the Public Works/Engineering Division in California. Issued as a subcontract opportunity, the contract was posted on June 11, 2026, with a response deadline of June 25, 2026. Details on the specific place of performance and point of contact are not provided. The scope focuses on critical data collection activities essential for construction and engineering projects, supporting project design, regulatory approval, and accurate record-keeping.

General Info

Perform topographic, boundary, utility surveys with georeferenced data for design and permitting.

Documents

This scope was carved out of 2026-RFQ-001.

The full solicitation package (9 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

As-Needed Public Works Construction Services (Signals/Lighting, Concrete/Paving, Signs/Markings)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works/Engineering Division
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Conduct topographic, boundary, and utility surveys to support design and permitting, delivering georeferenced data, ALTA/NSPS surveys, and as-built verification.

More opportunities from California → Public Works/Engineering Division

Same awarding agency

NAICS: 237110
New
SLED
Oyster Point Sanitary Sewer Pump Station Relocation
Solicitation # SS2202
The Oyster Point Sanitary Sewer Pump Station Relocation project, identified as Project No. SS2202 and Bid No. 2723, involves the relocation and upgrade of an existing vacuum and ejector pump station to a traditional pump station at the Oyster Point Marina in South San Francisco, California. The scope of work includes relocating the electrical switchgear cabinet serving the eastern marina, installing new ejector pumps at each marina facility, implementing a new collection force main system, and installing a new pump ahead on the public dock. Additionally, the contractor is responsible for decommissioning the existing pump station, abandoning the vacuum main system, and performing asbestos abatement on twenty pipe flange gaskets. The project is estimated by the engineer at 5.16 million dollars and requires a Class A Contractor's license. The project is structured into a two-stage work order with a total completion time of 300 working days. Stage 1 focuses on pre-construction activities, submittals, and permits within 50 working days, while Stage 2 consists of four construction phases covering the pump station building, electrical facilities, utility metering, and final site grading. The contract will be awarded to the lowest responsive and responsible bidder. Key compliance requirements include a 65 percent diversion of non-inert waste from landfills, adherence to prevailing wage laws, and the procurement of payment, faithful performance, and guaranty bonds. Liquidated damages for delays are set at 3,600 dollars per calendar day.
Water and Sewer Line and Related Structures Construction

POSTED

2 days ago

DEADLINE

in 12 days
View Details
NAICS: 237110
SLED
2027 Sanitary Sewer Spot Repair and Rehabilitation Project
Solicitation # SS2601
The 2027 Sanitary Sewer Spot Repair and Rehabilitation Project (Solicitation SS2601) is a public works contract issued by the City of South San Francisco, California, for sewer infrastructure improvements within the Sunshine Garden, Lindenville, and Orange Park neighborhoods. The scope of work includes sanitary sewer inspection, point repairs, open trench replacements, pipe bursting, manhole rehabilitation or replacement, and the reconnection of existing laterals. The project involves a base bid estimated at 4.95 million dollars and an alternate bid estimated at 627 thousand dollars. Key deliverables include pre- and post-construction CCTV inspections with detailed PDF reporting and full site restoration of pavement, sidewalks, and landscaping. The contract is awarded to the responsive bidder with the lowest total base bid. Work must commence within 15 calendar days of contract approval and be completed within 115 working days, with a specific requirement that Phase 1 work be finished by May 1, 2027. The project adheres to Caltrans State Standard Specifications and requires compliance with prevailing wage laws under the California Labor Code. Bidders must provide a bid bond of at least 10 percent of the bid, as well as performance and payment bonds equal to the contract amount. Technical standards include adherence to ASTM D3350 and F714 for HDPE pipes and UPC standards for pipe-bursting. Administration is managed by the Public Works/Engineering Division, with specific notice requirements for material and work inspections ranging from 24 hours to 5 working days.
Water and Sewer Line and Related Structures Construction

POSTED

10 days ago

DEADLINE

in 13 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS