Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Vermont was posted on May 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Surveying and Topographic Mapping

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves conducting detailed field surveys to gather accurate topographic data of the Gihon River corridor and its surrounding areas. This data collection is essential to support the final engineering and ecological design efforts. The work falls under the Surveying and Topographic Mapping category and is structured as a subcontract. The project is managed by the Vermont Department of Economic Development and adheres to the NAICS code 541370, which includes surveying and mapping services. The solicitation was posted in May 2026, with a response deadline set for early June 2026. While specific details about the set-aside type, point of contact, and the precise performance location were not provided, the contract clearly focuses on providing precise survey data to enable engineering and ecological planning for the Gihon River area. The opportunity was publicly listed through Vermont's business registry, indicating a formal bidding process for interested subcontractors.

General Info

Subcontract for detailed topographic surveys of Gihon River to support engineering and ecological design.

Agency

Vermont → Department of Economic DevelopmentView Agency

NAICS

541370 - Surveying and Mapping (except Geophysical) ServicesView NAICS

Place of Performance

VT, USA

Set-Aside

NONE

Documents

This scope was carved out of 73775.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Vermont Studio Center Floodplain Restoration Project - Final Design Engineering

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
ContactsNo contacts available
OfficeN/A
Organization / Agency
Vermont → Department of Economic Development
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Conduct field surveys to collect precise topographic data of the Gihon River corridor and surrounding areas to support final engineering and ecological design.

More opportunities from Vermont → Department of Economic Development

Same awarding agency

NAICS: 541330
New
SLED
Centerville Brook AOP Obstructions Design Planning Hyde Park
Solicitation # 75140
The Centerville Brook AOP Obstructions Design Planning project in Hyde Park, Vermont, focuses on restoring aquatic organism passage and improving stream connectivity. The primary objective is to advance the Centerville Brook Dam removal from a 30 percent preliminary design to a 100 percent shovel-ready final design. This scope includes full structural removal of the dam, stream channel restoration, sediment management of approximately 200 cubic yards of impounded material, and the relocation of a dry hydrant to a viable downstream location at Brook Road. The project aims to eliminate flood risks, reduce streambank erosion, and enhance habitat complexity through the use of timber grade controls and Beaver Dam Analogs. Additionally, the project has expanded to include preliminary 30 percent design planning for two downstream culverts at Centerville Road and Brook Road. These structures currently act as perched barriers to native brook trout and other aquatic species. The design process will evaluate whether these culverts require full replacement or can be improved through aquatic organism passage retrofits. Managed by the Lamoille County Planning Commission and supported by grants from the Lake Champlain Basin Program and the New England Interstate Water Pollution Control Commission, the initiative seeks to establish a natural stream channel to improve water quality and flood water capacity.
Engineering Services

POSTED

1 day ago

DEADLINE

in 20 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS