Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

TD1539486 & TD1630947 Moorpark-Royal Arroyo Simi Grid Resiliency Project - Phase 1 (Notification of Lake or Streambed Alteration, No. EPIMS-VEN-61714-R5)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has amended Lake and Streambed Alteration Agreement EPIMS-VEN-61714-R5 to authorize Southern California Edison Company, represented by Victoria Parsons, to conduct specified activities related to the Moorpark-Royal Arroyo Simi Grid Resiliency Project — Phase 1. The permitted work includes vegetation trimming along two access paths, overland travel for equipment, deployment of a drill rig, and one geotechnical investigation at designated poles identified as 4479508E, 4479509E, 4479510E, 4479511E, and 4479512E. Additional activities involve cement pouring and safety inspections of these existing poles. All work is temporary and will result in a total impact of 0.457-acre, primarily affecting areas governed by Fish and Game Code section 1600 et seq. The agreement requires the Permittee to restore any disturbed areas in compliance with applicable regulations to mitigate environmental effects. The project is located in Simi Valley, California, and is part of broader efforts to enhance grid resiliency in the region. The permit modification is issued under the authority of section 1602 of the Fish and Game Code and is tied to the public record under EPIMS Notification No. EPIMS-VEN-61714-R5. Victoria Parsons of Southern California Edison serves as the primary point of contact for the Permittee, while Dane St. George of the California Department of Fish and Wildlife, Region 5 — South Coast, is designated as the primary agency liaison. The agreement was posted on June 15, 2026, and is referenced through the public system with the UI link provided for transparency and recordkeeping. The scope is focused on minimal, controlled disturbance with restoration as a mandatory component to ensure compliance with environmental protections.

General Info

Southern California Edison approved for limited vegetation trimming, equipment travel, drill deployment, and geotechnical work at five poles in Simi Valley, with mandatory restoration.

Agency

California → Fish and Wildlife, Region 5 - South Coast, San Diego

NAICS

541690 - Other Scientific and Technical Consulting ServicesView NAICS

Place of Performance

Simi Valley, CA

Set-Aside

NONE

Documents

(1)

EPIMS-VEN-61714-R5 CEQA Notice of Exemption

PDFceqa-notice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 5 - South Coast, San Diego
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 5 - South Coast, San Diego
Office AddressN/A
Contacts
Victoria ParsonsSenior Manager, Water Quality Compliance
Dane St. GeorgeSenior Environmental Scientist (Specialist)

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has amended Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-VEN-61714-R5, pursuant to section 1602 of the Fish and Game Code to Southern California Edison Company (SCE), as represented by Victoria Parsons. The original Project consists of clearing two access paths of vegetation, conducting one geotechnical investigation, pouring cement, and conducting safety inspections of existing Poles: 4479508E, 4479509E, 4479510E, 4479511E, and 4479512E. The activities covered by this Agreement include vegetation trimming, overland travel, deployment of a drill rig, and Permittee conducting one geotechnical investigation. The Project also includes the restoration of areas subject to Fish and Game Code section 1600 et seq., impacted by the activities covered under this Agreement. The Project’s activities total temporary impacts of 0.457-acre.

Similar Contracts

Same NAICS industry code

NAICS: 541690
New
Corydon Well Replacement Project – Professional Design, Bidding Support and Engineering Services During Construction
Solicitation # C2305
The Elsinore Valley Municipal Water District is seeking qualified firms to design, provide bidding support, and deliver engineering services during construction for the replacement of the existing Corydon well with a new municipal groundwater production well on district property, utilizing existing infrastructure to meet growing water demand. This project, funded in part by a Department of the Interior Bureau of Reclamation WaterSMART grant, requires comprehensive professional services spanning two phases: Phase One includes civil site design, technical specifications, and line-bid items for drilling and abandonment of the old well, with full-time on-site construction management; Phase Two encompasses architectural, structural, mechanical, electrical, and instrumentation and controls design for equipping, testing, and commissioning the new well, supported by engineering oversight throughout construction. The contract is awarded based on demonstrated competence and professional qualifications, with evaluation factors weighting relevant experience and project understanding equally at 25%, followed by scope and schedule (20%), innovation (10%), cost (10%), and overall proposal quality (10%), ensuring value over lowest price alone. Proposals must be submitted via the PlanetBids portal by September 1, 2026, and include detailed cost breakdowns by task, resumes of key personnel, representative projects, references, and mandatory certifications including non-collusion, debarment and suspension, lobbying, Buy America compliance for materials, and Executive Order N-6-22 sanctions adherence. Contractors must be registered with California’s Department of Industrial Relations and comply with federal grant requirements including 2 CFR Part 200 audit thresholds, whistleblower protections, drug-free workplace mandates, and trafficking prohibitions. Insurance requirements include $2 million general liability per occurrence, $1 million umbrella and auto liability, $2 million workers’ compensation, and no professional liability coverage required. Monthly invoicing through the Department of Treasury’s ASAP system is mandatory for federal funds, with payment processed within 45 days. The project site is located at 31642 Corydon Street, Wildomar, CA, and performance timelines span from 2024 through September 2027, with key milestones including final design submittals by April 2027 and project completion reporting by September 2027. The district requires active participation from DBE, MBE, and WBE firms certified through recognized programs, and proposers must disclose all DBE subconsultants, including reasons for non-selection. Design must comply with California State Water Resources Control Board and Riverside County regulations, and all
TKE Engineering, Inc.

POSTED

about 8 hours ago

DEADLINE

in 24 days
View Details
NAICS: 541690
New
Federal
Pharmacokinetic Data Analysis and ReportingThe contract entails the analysis of plasma concentration-time data to determine pharmacokinetic parameters and generate detailed concentration-time curves, with all results delivered in a structured Excel report accompanied by a narrative summary that interprets the findings. The work is focused on quantitative evaluation of drug behavior in the body, requiring precise computational methods and regulatory-compliant reporting standards to ensure accuracy and reproducibility. The deliverables must be clearly formatted, scientifically sound, and tailored for use in regulatory submissions or internal R&D decision-making. This is a subcontract under the National Institutes of Health, operating through the Department of Health and Human Services, with the NAICS code 541690 indicating specialized scientific and technical consulting services. The opportunity was posted on August 7, 2026, with a response deadline of August 24, 2026, and no set-aside provisions are specified. While the place of performance and point of contact details are not provided, the work is expected to be performed remotely or under flexible arrangements, consistent with the nature of data analysis tasks. The contracting entity is seeking qualified contractors with demonstrated expertise in pharmacokinetic modeling and data reporting to support ongoing research initiatives.
National Institutes Of Health Olao

POSTED

1 day ago

DEADLINE

in 16 days
View Details