Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

TD2109604 South Mountain Road Grid Resiliency Project (Notification of Streambed Alteration, No. EPIMS-VEN-55898-R5)

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has authorized Southern California Edison, represented by Victoria Parsons, to conduct limited vegetation trampling and ground disturbance to access and replace the anchor of Pole 4485131E near South Mountain Road, as part of the South Mountain Road Grid Resiliency Project. Activities will involve traversing approximately 55 feet of the Santa Clara River’s bed, left bank, and channel on foot using hand tools, resulting in temporary impacts to 0.011 acre of giant reed stands, active agriculture, and coast live oak woodland and forest. The work includes crushing and trampling of herbaceous and subshrub vegetation during access and operations, alongside ground disturbance necessary for the anchor replacement. All impacts are designated as temporary, with a mandatory requirement to restore all affected areas upon project completion, including regrading channel segments to their original contours, removing all construction waste, and rehabilitating the ecological and morphological integrity of the streambed and surrounding vegetation. The authorization is issued under Section 1602 of the Fish and Game Code through EPIMS Notification No. EPIMS-VEN-55898-R5, with environmental oversight provided by the agency’s South Coast region.

General Info

Southern California Edison to temporarily disturb 0.011 acre for anchor replacement, with mandatory ecological restoration.

Agency

California → Fish and Wildlife, Region 5 - South Coast, San Diego

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 5 - South Coast, San Diego
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 5 - South Coast, San Diego
Office AddressN/A

Full Description

Show more
The California Department of Fish and Wildlife has executed Streambed Alteration Agreement EPIMS Notification No. EPIMS-VEN-55898-R5, pursuant to Section 1602 of the Fish and Game Code to Southern California Edison (Permittee), as represented by Victoria Parsons. The project consists of vegetation trampling to facilitate access to Pole 4485131E’s (H-frame structure 4485130E/44855131E), and the replacement of Pole 4485131E’s anchor. Project activities will result in 0.011-acre of temporary impacts to giant reed stands, active agriculture, and coast live oak woodland and forest. Project site access will require traversing approximately 55 feet of the Santa Clara River’s bed, left bank, and channel, which includes crews accessing the project location on foot and operation of hand tools. Project activities will require crushing and trampling of herbaceous and subshrub vegetation during access and operations, as well as ground disturbance associated with the anchor replacement processes. The project also includes the restoration of all project areas, including the regrading of channel areas back to their pre-project contours where applicable, removal of project generated wastes, and the restoration of channel ecology and morphology upon completion of the project.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
RFI-TOM-LOG26_01_Mise en place de répertoire de prestataires en BTP dans la Région de Tombouctou Cheick Abdoul Kader THERA - [email hidden]
Solicitation # RFI-TOM-LOG26_01
The International Organization for Migration (IOM) has issued Request for Information RFI-TOM-LOG26_01 to establish a directory of qualified Building and Public Works (BTP) service providers in the Tombouctou and Taoudenit regions of Mali. This prequalification process aims to identify capable suppliers for future competitive bidding across three primary categories: building construction and rehabilitation, drinking water supply system construction and rehabilitation, and the construction and rehabilitation of roads and annexed works such as bridges and culverts. As this is a pre-solicitation phase, pricing is not requested at this stage. Eligible bidders must be physically present in Tombouctou with their own facilities and must not be on the United Nations ineligibility list. Technical requirements include a minimum of five years of continuous activity in the BTP sector and the completion of at least two similar projects in Mali between October 2020 and October 2026. Financial capacity is evaluated based on cumulative revenue for 2023 through 2025, with providers categorized into three tiers based on thresholds of 60 million and 200 million XOF. Required documentation includes commercial registration, taxpayer cards, CNPS registration, and certified financial statements. Submissions must be delivered to the IOM Sub-Office in Tombouctou by November 24, 2026.
IOM

POSTED

about 22 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Engineering

POSTED

1 day ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS