Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Stage and Rain Gage at Dublin Creek

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Zone 7 Water Agency is implementing a project to install a new telemetered gage station within its right-of-way along Dublin Creek in Dublin, California. The primary objective of this station is to collect real-time stage and precipitation data, which will be transmitted to a public and agency data dashboard. The installation includes two pressure transducer probes, a tipping bucket instrument, a datalogger, a modem, a solar panel, and a 12-volt battery. Additional hardware consists of an enclosure box, galvanized pipe mounts, crest stage gages, staff plates, and a tagline/pulley system for flow measurements located 15 to 30 feet upstream of the staff plates. Construction is targeted for Fall 2025 and is expected to take approximately six days, comprising three days for gage housing construction, two days for equipment installation, and one day for surveying and leveling. The installation process involves manually dug concrete footings for the main equipment and the use of a gas-powered post driver for the staff plate and pulley mounts. The project occupies a working footprint of approximately 50 square feet and is categorized as having minimal environmental impact, qualifying for a Categorical Exemption under CEQA Guidelines Section 15301. Project management is overseen by Justin Pascual, with Elke Rank serving as the lead agency CEQA contact.

General Info

Install telemetered gage station in Dublin Creek for real-time stage and rainfall data, minimal environmental impact.

Agency

California → Zone 7 Water Agency

Place of Performance

Dublin Creek (waterbody) near Amador Plaza Rd., Dublin, CA, 94551

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

special-notice

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Zone 7 Water Agency
Contacts1 person available
OfficeN/A
Organization / Agency
California → Zone 7 Water Agency
Office AddressN/A

Full Description

Show more
New telemetered gage station positioned within the Zone 7 right-of-way along Dublin Creek. This gage will allow for stage and precipitation data to be collected and telemetered real-time into a Zone 7 data dashboard viewing website for the benefit of agency staff and the public. The station will be equipped with the following: (2) pressure transducer (PT) probes for measuring stage; (1) tipping bucket instrument for measuring precipitation; datalogger and modem for data telemetry; a solar panel and 12-volt battery for powering the station; protective conduit for the 2 PT probes; mounting hardware equipment; an enclosure box for the instruments; galvanized pipe for mounts; crest stage gages; and staff plates. A tagline/pulley system for flow measurements will be installed 15-30 feet upstream of the staff plates with the static line above the top of bank elevation. The mounting structure for the equipment enclosure box, solar panel and tipping bucket requires that the 2 galvanized pipe mounts be vertically set with concrete in manually dug footings with hole dimensions of 3-4 feet by 1-2 feet wide for each pipe. The (6) 1.5” galvanized pipe mounts for the staff plates and tagline/pulley system will be driven down into the channel bank to adequate depth with a gas-powered handheld post driver. Once construction is complete, the station equipment will be installed within the equipment housing. Ongoing operations and maintenance of this station may require staff to enter the riparian corridor where the PT probes are placed; no impacts are expected from routine operations and maintenance. The overall working footprint dimension for the structures is approximately 50 square feet. This project will have minimal/ no impact on baseline noise and riparian vegetation. The gas-powered post driver pounding into the pipe is expected to be the largest temporary noise contributor to the project, which may emit approximately 100 dBs of noise for 5-10 minutes at a time for mounting the (6) 1.5” galvanized pipes into the left and right banks of Dublin Creek. The protective conduit and staff plate post mountings were strategically chosen to avoid the removal of any riparian vegetation. The target construction date is set for Fall 2025, and it will take approximately 3 days to construct the gage housing equipment, then approximately 2 days to install the gaging and telemeter equipment. Surveying and leveling the station will take 1 day.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
RFI-TOM-LOG26_01_Mise en place de répertoire de prestataires en BTP dans la Région de Tombouctou Cheick Abdoul Kader THERA - [email hidden]
Solicitation # RFI-TOM-LOG26_01
The International Organization for Migration (IOM) has issued Request for Information RFI-TOM-LOG26_01 to establish a directory of qualified Building and Public Works (BTP) service providers in the Tombouctou and Taoudenit regions of Mali. This prequalification process aims to identify capable suppliers for future competitive bidding across three primary categories: building construction and rehabilitation, drinking water supply system construction and rehabilitation, and the construction and rehabilitation of roads and annexed works such as bridges and culverts. As this is a pre-solicitation phase, pricing is not requested at this stage. Eligible bidders must be physically present in Tombouctou with their own facilities and must not be on the United Nations ineligibility list. Technical requirements include a minimum of five years of continuous activity in the BTP sector and the completion of at least two similar projects in Mali between October 2020 and October 2026. Financial capacity is evaluated based on cumulative revenue for 2023 through 2025, with providers categorized into three tiers based on thresholds of 60 million and 200 million XOF. Required documentation includes commercial registration, taxpayer cards, CNPS registration, and certified financial statements. Submissions must be delivered to the IOM Sub-Office in Tombouctou by November 24, 2026.
IOM

POSTED

about 22 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Engineering

POSTED

1 day ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS