Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Tehachapi College Campus Center Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Kern Community College District is developing a new community college campus on a 6.82-acre site on West Tehachapi Boulevard in Tehachapi, California. The project is structured in two phases with a total estimated buildout time of 16 months. Phase 1 involves a four-month construction period to establish 19,320 square feet of general education instructional space using four modular buildings, a 375-square-foot storage building, a 174-space parking lot, and essential infrastructure including a stormwater retention basin and drainage easement. Phase 2 consists of the construction of a permanent 39,000-square-foot two-story classroom building, after which the initial modular buildings will be removed. At full capacity, the campus will feature up to seven classrooms serving an average of 200 to 300 students daily, with a maximum enrollment of 500 students. Operations are scheduled Monday through Thursday from 11 am to 8 pm, supported by seven regular employees and three dedicated maintenance and operations staff. The project requires rezoning the site from M-1 Light Industrial to SD-2 Special District. Environmental compliance has been managed through a Mitigated Negative Declaration under CEQA, with specific adherence to standards from the California Division of the State Architect and various regional water and air quality boards. Key regulatory requirements include the submission of a Hazardous Materials Business Plan and strict adherence to human remains protocols under the California Health and Safety Code.

General Info

Kern Community College District building a two-phase campus in Tehachapi, California.

Agency

California → Kern Community College District

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

West Tehachapi Boulevard between Mt. View Avenue and Mulberry Street, Tehachapi, CA, 93561

Set-Aside

NONE

Documents

(6)

KCCD Tehachapi College Campus Center Project IS-MND September 2025

PDFmitigated-negative-declaration

KCCD Tehachapi Campus Notice of Determination

PDFnotice-of-determination

Tehachapi College Campus Center Project Notice of Completion

PDFnotice-of-completion

Appendices A-E ocr

PDF

Tehachapi College Campus Center Project Summary Form

PDFenvironmental-summary

Notice of Public Hearing and Intent to Adopt Mitigated Negative Declaration for Tehachapi College Campus Center Project

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Kern Community College District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Kern Community College District
Office AddressN/A
Contacts
Chris BeltramoConstruction Project Manager

Interested Companies (1)

Show more
Kern Community College District
Bakersfield, CA

Full Description

Show more
The Project intends to develop a new community college campus to serve the residents of the greater Tehachapi area. The campus will be developed in phases: • Phase 1: Consists of a combined total of 19,320 square feet of general education instructional buildings with four modular buildings, a 375 square-foot storage building, a 17 4-space parking lot, pathways, landscaping, a proposed on-site stormwater retention basin and 20 foot drainage easement, and other internal infrastructure. • Phase 2: Includes the development of an approximately 39,000 square-foot two story classroom building. The four modular buildings will be removed when the permanent classroom building is completed. Construction: Phase 1 buildout will take approximately four months. Phase 2 building may take approximately one year to complete. Therefore, full buildout of the campus will take approximately 16 months. It is anticipated that the following pieces of equipment would be used during construction activities: • Roller • Loaded trucks • Excavator • Generator • Service truck • Air compressor Operation • At full buildout, the general education building with up to seven classrooms will be available and are expected to serve on average 200 to 300 students per day. Maximum enrollment at the campus would be up to approximately 500 students. • Classes are expected to be held Monday through Thursday, typically between 11 am and 8 pm. It is expected that seven employees will also regularly work out the instructional facilities. To maintain the facility, three employees will be dedicated for maintenance and operations. Entitlements: • Rezone the subject parcels from the M-1 (Light Industrial) conventional zone district to the SD-2 (Special District) transect zone district.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS