Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Temporary Sewage Bypass Pumping

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This small business set-aside subcontract, managed by the Department of Homeland Security for Base Elizabeth City, involves the supply and maintenance of temporary pumping systems for USCG sewage lift station projects in Cape Charles. The selected contractor is responsible for designing and submitting bypass plans for COR approval, installing necessary pumps and hoses, and ensuring the uninterrupted flow of sewage throughout the construction process. A critical component of the scope is strict adherence to environmental regulations regarding spill containment. The contractor must continuously monitor systems for leaks and maintain immediate remediation capabilities to prevent environmental contamination. Interested parties must respond by December 2, 2026, under NAICS code 237110.

General Info

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Cape Charles, VA, 23310, USA

Set-Aside

SBA

Documents

This scope was carved out of 70ZL1927QELIZ0002.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

USCG Station Cape Charles Sewage Lift Station Repairs

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Base Elizabeth City
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and maintains temporary pumping systems for prime contractors on USCG sewage lift station projects. Designs and submits bypass plans for COR approval, installs bypass pumps and hoses, and monitors for spills with immediate remediation capabilities. Requires compliance with environmental regulations regarding spill containment. Delivers uninterrupted sewage flow during construction.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business set-asides, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified firms. Interested parties must submit their responses by the deadline of December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open-cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe in 18 and 24-inch diameters. Technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, a CSO regulator fit out, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Site preparation tasks include clearing and grubbing over 5,130 square yards of wooded areas, seeding, fine grading, and select tree removal. Key project deliverables and requirements include the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP), geotechnical instrumentation and monitoring, and the procurement of railroad insurance. The project also involves the abandonment of existing pipes and manholes, as well as maintenance of flows and bypass operations. Point of contact for this solicitation is John Connelly.
Cleary Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key station improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, and a complete operating pumping station featuring mechanical and electrical systems, a generator, and odor control equipment. The contract is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Bids are evaluated based on responsiveness and responsibility, with the award granted to the lowest responsive bidder. Required bid submissions must include a signed bid form, bid bond, evidence of authority to sign, and MWBE compliance documentation. Technical standards for the work include AWWA Specification C-600 for pipelines, NEMA standards for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer, and payments are processed via applications for payment due 30 days after presentation.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The City of Winchester is soliciting bids for the Jefferson Street Pump Station Replacement project in Virginia. The scope of work includes the construction of a new pump station featuring a precast concrete building, controls, and a standby generator, as well as site electrical work, yard piping, security fencing, grading, and paving. Additionally, the project requires the relocation of an existing fuel tank and the demolition of existing facilities. All work must be completed within 610 calendar days from the Notice to Proceed, with liquidated damages set at 1,000 dollars per day for delays. Bids are due by 2:00 pm on November 12, 2026, and must be submitted exclusively through the City's e-Procurement Portal. The contract will be awarded to the lowest responsive and responsible bidder. Requirements for bidders include registration in the Commonwealth of Virginia, the provision of bid bonds, and the ability to provide performance and payment bonds equal to 100 percent of the contract amount. The project is subject to Davis-Bacon Act wage determinations, American Iron and Steel requirements, and strict adherence to ADA and OSHA standards. WG Construction is currently seeking MBE, WBE, and DBE subcontractor participation for several scopes, including paving, material supply, site development, fencing, MEP, roofing, and carpentry. Interested parties should contact Trish Mousavizadegan at [email hidden] or [phone hidden] for access to plans and specifications. Compliance with non-discrimination clauses and the prohibition of forced or indentured child labor is mandatory for all subcontracts exceeding 10,000 dollars.
WG Construction Co., Inc.

POSTED

about 3 hours ago

DEADLINE

in 5 days
View Details

More opportunities from Department Of Homeland Security → Base Elizabeth City

Same awarding agency

NAICS: 237110
New
Federal
USCG Station Milford Haven Water Treatment Repairs and Equipment Replacement
Solicitation # 70ZL1927QELIZ0001
The Department of Homeland Security, through Base Elizabeth City, is soliciting a Firm-Fixed Price contract for the repair and replacement of potable water treatment equipment at USCG Station Milford Haven in Hudgins, Virginia. This procurement is a 100% small business set-aside under NAICS code 237110. The project aims to restore full reliability to the drinking water system through several key tasks, including cleaning and resealing the sand bed filter, replacing the continuous-run booster pump and damaged piping, installing two new commercial water softeners with dual pre-filters, adding a bottom drain and cleanout valve to the water storage tank, and repairing the well sump pump. All work must comply with NFPA 70, NSF/ANSI Standard 61, and Virginia State Board of Health Waterworks Regulations. The government will award the contract based on the lowest price technically acceptable (LPTA) criteria, evaluating offerors on their technical capability. A mandatory site visit was scheduled for November 17, 2026, and all quotes must be submitted via email to the contracting officer by noon Eastern Time on December 1, 2026. The period of performance is scheduled from December 7, 2026, to March 8, 2027, with a total duration of three months from the project start date. Contractors are required to provide a technical approach of no more than five pages and must adhere to Davis-Bacon Act wage determinations and Executive Order 13706 regarding paid sick leave. Final acceptance is contingent upon disinfection, pressure testing, and water validation by an accredited laboratory.
Water and Sewer Line and Related Structures Construction

POSTED

about 11 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237110
New
Federal
USCG Station Cape Charles Sewage Lift Station Repairs
Solicitation # 70ZL1927QELIZ0002
Solicitation 70ZL1927QELIZ0002 is a Firm-Fixed Price contract for the repair and maintenance of the sewage lift station at USCG Station Cape Charles in Virginia. The project requires the contractor to provide all labor, equipment, and materials to replace pumps, breakers, control boards, panelboards, and wiring, as well as restore and reline the existing concrete manhole. To ensure uninterrupted facility operations, the contractor must install and maintain a temporary sewage bypass pumping system. Key deliverables include a minimum of four hours of personnel training, as-built drawings, and two sets of operation and maintenance manuals. The period of performance is 120 calendar days from the issuance of the Notice to Proceed. This procurement is a total small business set-aside under NAICS code 237110, with a size standard of 45 million dollars. Award will be based on the lowest price technically acceptable (LPTA) quote, evaluating technical capability and price. A mandatory site visit was scheduled for November 18, 2026, and all quotes must be submitted by noon Eastern Time on December 2, 2026. The contract mandates compliance with the Davis-Bacon Act for prevailing wages, the use of domestic construction materials, and the submission of performance and payment bonds. Invoicing must be processed through the Invoice Processing Platform.
Water and Sewer Line and Related Structures Construction

POSTED

about 11 hours ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS