Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Terminal Reservoir Management System Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Santa Margarita Water District is undertaking the installation of a chlorine residual control system at the Terminal Zone 1 Reservoir in San Juan Capistrano, California, to monitor and maintain appropriate levels of total chlorine residual in drinking water. The project involves replacing existing equipment and installing new conduits within the reservoir’s property boundary while utilizing current infrastructure, and is classified as a minor upgrade under California Environmental Quality Act (CEQA) Class 1 categorical exemption, which applies to the maintenance of existing public facilities with negligible environmental impact. The work is not expected to require new construction or significant land disturbance, and the district has confirmed exemption from environmental review fees and filed a Notice of Exemption with the Orange County Clerk-Recorder, which was publicly posted for a 30-day review period. The project’s place of performance is clearly defined as 26861 Mission Hills Drive, San Juan Capistrano, CA 92675, and the filing date for environmental compliance was May 29, 2024, though no formal contract start or completion date is specified. The contract is designated as a forecasted procurement with no publicly disclosed value, no line-item costing, and no formal contract type identified. No federal acquisition regulations clauses, evaluation factors, payment systems, or special contractual requirements beyond environmental compliance are included. The lead agency contact is Patricia A. Butler, Chief Engineer, who serves as the primary point of communication, with no designated contracting officer, COR, or COTR named. While payment methods such as cash, check, and credit are noted, no formal invoicing system, remittance address, or accounting codes are provided, and no federal reporting triggers arise from the submission. All documentation centers on CEQA compliance, with no technical performance standards, inspection criteria, packaging requirements, or socioeconomic certifications referenced, reflecting a localized municipal infrastructure project governed by state environmental procedures rather than federal procurement rules.

General Info

Installation of chlorine residual control system at Terminal Zone 1 Reservoir, CEQA Class 1 exempt, no contract value or dates disclosed.

Agency

California → Santa Margarita Water District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

26861 Mission Hills drive, San Juan Capistrano, CA

Set-Aside

NONE

Documents

(1)

NOE 24-85000469 Terminal Reservoir Management System Installation

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Margarita Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Santa Margarita Water District
Office AddressN/A
Contacts
Tricia ButlerChief Engineer

Full Description

Show more
Installation of chlorine residual control system at Terminal Zone 1 Reservoir to monitor and maintain total chlorine residual within drinking water. Project utilizes existing buildings but requires equipment replacement and conduits within property boundary. Beneficiary is Santa Margarita Water District.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
SLED
1947 Watermain - North Bound Airport Expressway PreservationThe Port of Seattle’s Aviation Project Management Group is forecasting the restoration of a 1947 water main located along the northbound Airport Expressway using cured-in-place pipe (CIPP) technology under a Design-Bid-Build procurement model. The project aims to preserve the integrity of the aging infrastructure without excavation, leveraging modern rehabilitation methods to extend service life and enhance system reliability. The work will involve lining the existing pipeline with a resin-saturated fabric liner that is inverted and cured in place, minimizing disruption to adjacent roadways and surrounding facilities. The contract falls under NAICS code 237110, indicating it is classified as Water and Sewer Line and Related Structures Construction. Moraa Omwega serves as the primary point of contact for inquiries, with Ray Moreno designated as Project Manager. The solicitation was posted on July 31, 2026, and while no set-aside designation or bid deadline has been specified, interested parties are directed to the official Port of Seattle portal for updates and detailed technical requirements. The place of performance is tied to the Airport Expressway, although exact geographic coordinates are not provided, and all work must be coordinated with ongoing airport operations to ensure safety and minimize impact to airfield access and logistics.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237110
New
SLED
Bid #EAJA2627-1 Locate and Identify Water Service Lines
Solicitation # Ephrata Area Joint Authority, Lancaster County
The Ephrata Area Joint Authority is soliciting sealed bids for the locating and identifying of approximately 1,000 existing water service lines through excavation, material identification, documentation, and full restoration of all disturbed areas, under Bid #EAJA2627-1. Bids must be submitted electronically via the PennBid platform by 10:00 AM local time on Thursday, August 27, 2026, with bid results publicly displayed immediately after the online opening. All contract documents are available free of charge on the same platform, and any questions must be submitted in writing through PennBid no later than 12:00 PM on Wednesday, August 19, 2026. Each bid must include a bid bond equal to 10 percent of the total base bid, secured by certified check, letter of credit, or other acceptable form, and no bid may be withdrawn for 60 calendar days after the submission deadline unless permitted by law. The contractor is required to provide performance and payment bonds, comply with the Pennsylvania Prevailing Wage Act, adhere to Federal OSHA safety standards, and meet the requirements of PA Act 127 by submitting E-Verify enrollment verification for all employees and subcontractors prior to work commencement. The authority will award the contract to the lowest responsive and responsible bidder, reserving the right to reject any or all bids. All employment practices must comply with non-discrimination laws, including the Pennsylvania Human Relations Act, prohibiting discrimination based on race, color, creed, disability, religion, age, sex, or national origin. The work will be performed in Lancaster County, Pennsylvania, and compliance with all regulatory and contractual conditions is mandatory for contract award and execution.
Lancaster County

POSTED

about 20 hours ago

DEADLINE

in 26 days
View Details
NAICS: 237110
New
SLED
Waterline Replacement – West Main St & Cold Storage Rd.
Solicitation # Bloomfield Borough Water Authority, Perry County
The Bloomfield Borough Water Authority is seeking bids for the replacement and extension of approximately 2,100 linear feet of 8-inch ductile iron water main along West Main Street and Cold Storage Road in Bloomfield Borough and Centre Township, Perry County, Pennsylvania, including all necessary appurtenances and site restoration. Bids must be submitted electronically through PennBid by 1 PM on Wednesday, September 9, 2026, and will be publicly opened on Tuesday, September 15, 2026, at 5 PM local time at the Authority’s building in New Bloomfield. All bidding documents are available exclusively through the PennBid website, and prospective bidders are required to register as plan holders to receive updates, addenda, and official communications; no responsibility is accepted for documents obtained from unauthorized sources. A pre-bid conference is scheduled for August 19, 2026, at the Bloomfield Borough Building, though attendance is optional. Bids must remain valid for at least 60 days after opening, extending to 120 days if award delays occur due to governmental approvals, bond requirements, or grant processing. Awards will be made only to responsible bidders evaluated on integrity, past performance, financial and technical capacity, and compliance with public policy, with the Authority retaining the right to reject any or all bids and waive irregularities as it deems in its best interest.
Perry County

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
SLED
Drainage Pipe
Solicitation # 2426
The Township of Wayne is seeking open-ended contracts to supply drainage pipe for the repair and maintenance of its water system infrastructure. This solicitation, identified as 2426, was posted on July 31, 2026, with responses due by August 14, 2026, at 3:00 PM. The procurement is managed by the Purchasing Division of New Jersey and falls under the jurisdiction of the township located in Wayne, NJ, with a mailing address of 07470. The contract will cover the furnishing of drainage pipe on an as-needed basis to support ongoing repair efforts, ensuring the reliability and functionality of the township’s water system equipment. There is no specified set-aside classification or NAICS code for this solicitation, and performance is expected within the state of New Jersey. Nicole Lee, the Specifications Writer, serves as the primary point of contact for this procurement and can be reached via email at leen@waynetownship.com or by phone at 973-694-1800. Interested parties must submit proposals through the designated online portal accessible via the provided UI link. The contract structure is designed to be flexible, allowing for multiple deliveries over time based on the township’s operational needs, without specifying fixed quantities or delivery schedules upfront. All submissions must comply with the technical and procedural requirements outlined in the solicitation to be considered for award.
Purchasing Division

POSTED

1 day ago

DEADLINE

in 13 days
View Details
NAICS: 237110
New
Federal
Z--REPLACE BACKFLOW PREVENTER ON LIGHTHOUSE ROAD AT C
Solicitation # 140P5426R0016
The contract seeks to replace an underground backflow preventer and water meter on Lighthouse Road at Cape Hatteras National Seashore under a firm fixed price construction contract, administered by the Department of the Interior’s National Park Service through ConOps East. The scope includes removing the existing backflow preventer and water meter, abandoning the current utility vault by filling and covering it with a new concrete slab, installing a new backflow preventer and coordinating the installation of a new Dare County water meter, and providing a heated enclosure for both new components. The contractor must supply all labor, materials, tools, equipment, and technical support necessary to complete the work in accordance with the statement of work to be included in the formal solicitation. This procurement is designated as a Total Small Business Set-Aside under NAICS code 237110, meaning only small businesses are eligible to compete. All offerors must be registered in the System for Award Management and must submit required representations and certifications via SAM.gov prior to submission; failure to do so will render an offer nonresponsive. The solicitation number is 140P5426R0016, posted on June 9, 2026, with a response deadline of July 24, 2026, and the primary point of contact is William Vazquez at the Department of the Interior office in Homestead, Florida. While the formal Request for Proposal detailing evaluation factors, contract clauses, inspection criteria, and delivery terms is expected to be published on SAM.gov around June 24, 2026, current documentation confirms performance will occur at the designated seashore location under FAR Part 36 guidelines for construction contracts.
Ser South Mabo (54000)

POSTED

1 day ago

DEADLINE

in 6 days
View Details