Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on April 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Test Facility Pump System Replacement

Closed
FA9101269TFPSFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333996
New
DIBBS
SEAL ASSEMBLY, SHAFT, SP
Solicitation # SPE7M1-27-T-1005
Solicitation SPE7M1-27-T-1005 is a fixed-price request for quotations issued by the DLA Weapons Support Maritime Supply Chain for the procurement of 13 spring-loaded shaft seal assemblies, identified by NSN 4320-01-439-0131. This is a restricted source, critical application item requiring engineering source approval from the government design control activity, specifically referencing Shapes Group Ltd Co. part number 5750008-003. The required delivery date is October 17, 2027, with a need ship date of April 13, 2027, and a delivery lead time of 168 days. Delivery is to be made to DLA Distribution San Diego, with inspection and acceptance occurring at the destination per FAR 52.246-2. The contract mandates strict adherence to technical and quality requirements via the DLA Master List (RA001) and specifies packaging and marking according to MIL-STD-2073-1E and MIL-STD-129. Environmental restrictions prohibit the intentional addition of mercury or mercury-containing compounds and the use of Class I ozone-depleting chemicals. Contractors must utilize the Wide Area WorkFlow system for invoicing and comply with various FAR and DFARS clauses, including those regarding cybersecurity (DFARS 252.204-7012), the Buy American Act, and the Berry Amendment. Quotations must be submitted through the DIBBS portal by October 26, 2026.
DLA WEAPONS SUPPORT MARITIME SUPPLY CHAIN

POSTED

about 15 hours ago

DEADLINE

in 2 days
NAICS: 333996
New
DIBBS
CYLINDER BLOCK UNIT, HY
Solicitation # SPE7M1-27-U-0806
Solicitation SPE7M1-27-U-0806 is a total small business set-aside issued by the DLA Weapons Support Maritime Supply Chain for the procurement of Cylinder Block Units for hydraulic motor-pumps, identified by NSN 4320015656163 and part number 1FX292. This request may result in a unilateral Indefinite Delivery Contract for a one-year period with a maximum value of 350,000.00 dollars. The estimated annual quantity is 22 units, with a guaranteed contract minimum of 3 units and a minimum delivery order quantity of 5 units. Delivery is required within 34 days after receipt of order, with shipping terms set as FOB Origin and inspection and acceptance occurring at the destination. The contractor must adhere to strict packaging and marking standards, including ASTM D3951 for general packaging, MIL-STD-129 for labeling, and RP001 for palletization, while ensuring all DLA Master List of Technical and Quality Requirements take precedence. Hazardous materials must be labeled according to the Hazard Communication Standard. Invoicing and payment will be processed electronically through Wide Area WorkFlow. Award evaluation is based on the quoted price for the estimated annual demand, and the buy may be eligible for automated award provided the offeror does not quote used or remanufactured items and maintains a quote validity period of at least 90 days.
DLA WEAPONS SUPPORT MARITIME SUPPLY CHAIN

POSTED

about 15 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The United States Air Force, through the Arnold Engineering Development Complex (AEDC), is soliciting proposals for the design and demonstration of an operational utility prototype to replace the existing raw water supply system at Arnold Air Force Base, Tennessee. The project includes the delivery of pumps, supporting infrastructure, and the construction of a new free-standing building to house the system. This initiative aims to upgrade the aging water supply infrastructure by integrating a more reliable and flexible system that seamlessly interfaces with the current site operations. The solicitation, identified as "Test Facility Pump System Replacement" and posted on April 4, 2026, falls under NAICS code 333996 and is managed by the AEDC Procurement Branch. Proposals are due by May 4, 2026, and the work will be performed at Cooprertown, Tennessee. Interested offerors should note that certain attachments are restricted (Distribution D), requiring coordination with the Agreements Officer for access. The primary point of contact for this solicitation is Haley Smith, who can be reached via email for further inquiries.

General Info

USAF AEDC seeks proposals to replace water system with new pumps, infrastructure, and building.

NAICS

333996 - Fluid Power Pump and Motor Manufacturing

Place of Performance

COOPERTOWN, TN, 37389, USA

Set-Aside

NONE

Documents

10

Amended Agreement Articles Definitions and Acceptance Process

PDF, High priority: read this firstcontract-document
High

Attachment 13 Agreement Articles Definitions and Acceptance Process

PDF, High priority: read this firstcontract-document
High

SOO Test Facility Pump Building and System Replacement Arnold AFB

PDF, High priority: read this firstsoo
High

Appendix+B_Design+Review+Flow+Deliverables+and+Expectations_DISTRO+A.pdf

PDF

Appendix+C_AEDC+Standards_NOT+SENSITIVE.pdf

PDF

Appendix+G_Building+Requirements_DISTRO+A.pdf

PDF

Appendix+H_Building+Concept_DISTRO+A.pdf

PDF

Appendix+I_Bridge+Crane_DISTRO+A.pdf

PDF

Attachment+12_Prototype+Proposal+Evaluation+Methodology.xlsx

XLSX

Test+Facility+Pump+System+RPP.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from May 4, 2026 to May 11, 2026. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA9101 Aedc Pkp Procrmnt Branch
Contacts1 person available
OfficeARNOLD AFB, TN, 37389-1332, USA
Office AddressARNOLD AFB, TN, 37389-1332, USA
Contacts

Full Description

Show more

22 April 2026 - Extended proposal due date and amended CMMC Article.


_________________________________________________________


The United States Air Force (USAF), through AEDC, is seeking proposals from industry to deliver a design and demonstration of operational utility prototype in the form of a raw water supply system, including pumps, supporting infrastructure, and a new free-standing building at Arnold Air Force Base, TN. The objective is to replace the aging system and integrate a new, more reliable and flexible system into the existing site infrastructure.


Please see attachments for details.


Note: Some attachments are marked Distribution D. Contact the Agreements Officer for access to these protected documents. 

More opportunities from Department Of Defense → FA9101 Aedc Pkp Procrmnt Branch

Same awarding agency

NAICS: 333517
New
Federal
CNC Small Wire EDM
Solicitation # FA9101CNCSmallWireEDM
The Department of the Air Force is issuing a Sources Sought Notice to identify capable small and large businesses for the procurement of a new, fully functional Small CNC Wire Electrical Discharge Machining (EDM) machine for the Arnold Engineering Development Complex (AEDC) at Arnold Air Force Base, Tennessee. The required equipment must support submerged and non-submerged machining, automatic wire threading and alignment, and U-V taper cutting, with minimum axis travel of 15.5 inches for X, 11.5 inches for Y, 8.5 inches for Z, and plus or minus 2.4 inches for U and V. The machine must be compatible with a 480V, 3PH, 60 HZ electrical system and be built to NFPA 79 standards. Delivery is required within 90 days of order receipt, with the contractor providing assembly, startup, and functional testing based on ISO/ANSI standards at the AEDC Model Shop. The government requires a minimum 24-month warranty after installation and a 10-year accuracy guarantee on the linear drive system. Additionally, the contractor must provide two days of formal on-site operator training for up to five people and two days of maintenance training for up to five workers. Service support requirements include a 36-hour on-site repair response time and a 48-hour delivery window for repair parts. Interested respondents under NAICS code 333517 must submit company information, SAM UEI and CAGE codes, a compliance matrix, product literature, and past performance data to the contracting office by November 2, 2026.
Machine Tool Manufacturing

POSTED

about 20 hours ago

DEADLINE

in 5 days
View Details
NAICS: 333994
New
Federal
New Heat Treat Equipment
Solicitation # FA9101NHT
The Air Force Test Center’s Installation Contracting Division is conducting market research through a Sources Sought Notice to identify capable small and large businesses for the turnkey procurement, delivery, installation, and commissioning of a new Surface Combustion Allcase Batch Integral Quench Furnace Line. Located at Holloman Air Force Base in Building 1185, the project includes the installation of a Uni-DRAW Temper Furnace and a Spray/Dunk Wash Unit. The selected contractor will be responsible for all specialized engineering, rigging, and labor, ensuring the system is fully operational and compliant with NFPA 86, AMS 2750, OSHA 29 CFR 1910, and NEC/NFPA 70 standards. The performance timeline involves a 4 to 6 week kickoff and drawing phase, followed by a manufacturing lead time of approximately 52 to 78 weeks. On-site installation is expected to take 4 to 6 weeks, with an additional 2 to 3 weeks for commissioning and handover. Formal acceptance requires a successful three-cycle production demonstration and the sign-off of an Engineering Release Form. Additionally, the contractor must provide a two-year extended warranty and comprehensive on-site training for operators and maintenance personnel. Interested respondents must submit their company information, UEI number, technical solutions, budgetary estimates, and delivery timelines by November 2, 2026.
Industrial Process Furnace and Oven Manufacturing

POSTED

2 days ago

DEADLINE

in 5 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS