The project will test whether thermal energy storage can provide a practical pathway to lower emissions from industrial heat in a real-world operating environment, where reliability, performance and integration are critical

Awarded
GA590303Grant

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Australian Renewable Energy Agency is providing funding for a large-scale industrial heat electrification project at Rio Tinto’s Yarwun alumina refinery in Queensland. This initiative aims to validate the use of thermal energy storage to reduce fossil fuel reliance in energy-intensive industries by utilizing a Rondo Energy unit with a 30 MWt discharge, 78 MWe charge, and 360MWh capacity. The system will store low-cost electricity as heat to produce a continuous steam output, which is expected to lower onsite carbon dioxide emissions by approximately 67,000 tonnes annually. Funding is structured in stages, beginning with 3.6 million dollars for front-end engineering and design. Upon the successful completion of this phase, up to 38 million dollars will be provided for deployment. Additionally, the agency has approved up to 33.3 million dollars in conditional contingency support to mitigate specific project risks, such as electricity costs and budget overruns. This demonstration serves as a critical test for the reliability and integration of thermal energy storage in real-world industrial environments.

General Info

ARENA funds Rio Tinto's industrial heat electrification project to reduce carbon emissions.

Contract Value

$74,900,000

Place of Performance

Brisbane, QLD, 4000, AUS

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Contract opportunity posted

Awarded

Contract was awarded

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyAustralian Government → Australian Renewable Energy Agency
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
ARENA Grant Connect

Full Description

Show more
This grant will will provide funding to support Australia’s largest demonstration of industrial heat electrification, helping to validate the role of thermal energy storage in reducing fossil fuel use in energy-intensive industries and paving the way for similar projects in other sectors. The project is being delivered at Rio Tinto’s Yarwun alumina refinery near Gladstone, Queensland and will be one of the first large-scale demonstrations of thermal energy storage for industrial process heat globally. Industrial process heat is extremely challenging to decarbonise. Heavy industries such as alumina refining rely on large volumes of continuous, high-temperature steam that has traditionally been produced using fossil fuels. Thermal energy storage has emerged as a promising option where low-cost electricity is stored as heat and used to produce a continuous output of steam for refinery operations, reducing reliance on fossil fuel usage. ARENA’s funding for the project will be provided in stages, with an initial $3.6 million to complete front-end engineering and design work. Following successful completion of that study, ARENA will provide up to $38 million for deployment. ARENA has also approved up to $33.3 million in conditional contingency support, which would only be made available in defined circumstances to manage specific project risks, including cost overruns and electricity costs. The project will deploy a 30 MWt (discharge) / 78 MWe (charge) / 360MWh Rondo Energy thermal energy storage unit at Yarwun, using low-cost electricity to charge a heat battery that can store energy and release it when needed to generate steam for industrial operations. It is expected to cut onsite emissions by around 67,000 tonnes of carbon dioxide each year.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS