Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Washington was posted on August 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Third Bay Fire Hydrant Project, Jefferson Transit Authority, Port Townsend, WA

Closed
BXWA-2026-002372State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is soliciting bids for a green-street retrofit project located on South Marsham Street between Gravel Lane and US Route 50 in Downtown Romney, West Virginia. The scope of work involves the installation of approximately 1,450 square feet of permeable pavement and eight vegetated stormwater management cells to treat roughly 1.7 acres of impervious surface within a 3.3-acre drainage area. The project requires comprehensive drainage, underdrain, inlet, pipe, and downspout work, along with limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor. Landscaping requirements include the planting of six native trees and approximately 345 native plants or approved equivalents, concluding with final stabilization, cleanup, and restoration. This solicitation specifically encourages participation from small business concerns, including minority, woman-owned, disadvantaged, HUBZone, and veteran-owned businesses, who may also form consortiums to handle larger bid items. Bids are due by 4:00 P.M. on September 17, 2026. Interested parties must submit a response indicating their intent to bid to the primary contact, Jonah Leith. The project falls under NAICS code 237110, focusing on professional civil engineering construction.
Harbel, Inc.

POSTED

about 13 hours ago

DEADLINE

in 5 days
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, is a comprehensive infrastructure initiative issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches in diameter, as well as 54-inch and 145.5-inch diameter tie-ins and associated pipe fittings. Additional construction requirements include the delivery of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, and surface restoration, alongside the excavation of cobbles and large boulders. This solicitation, posted on September 11, 2026, with a response deadline of September 29, 2026, is open to small businesses, including certified service-disabled veteran-owned, minority, and women-owned enterprises. The prime contractor, J.W. Fowler, is actively seeking subcontractor pricing and offering support to M/W/DBE firms regarding bonding, insurance, and equipment procurement to maximize participation.
James W. Fowler Co.

POSTED

about 13 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The Third Bay Fire Hydrant Project for the Jefferson Transit Authority in Port Townsend, Washington, involves comprehensive infrastructure improvements. The scope of work includes installing a fire main, pressure reducing valve, and fire hydrants, as well as removing an existing hydrant and trees. Additionally, the contractor must handle the removal and replacement of cement concrete pavement and curbs, install storm drainage improvements and bollards, and restore all disturbed areas according to the contract plans and standard specifications. This solicitation, identified as BXWA-2026-002372, was posted on August 10, 2026, with a response deadline of August 12, 2026. A pre-bid meeting was scheduled for July 29 at 63 Four Corners Road. Interested parties can contact Sydney Thompson for further information regarding this local agency project.

General Info

Infrastructure improvements for Jefferson Transit Authority fire hydrants and drainage in Port Townsend.

Agency

Washington → Jefferson Transit AuthorityView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Port Townsend, WA, 98368, USA

Set-Aside

NONE

Documents

(334)

Specs - Page 128.jpg

JPG

Specs - Page 181.jpg

JPG

Addendum #1 - Page 67.jpg

JPG

Specs - Page 222.jpg

JPG

Specs - Page 218.jpg

JPG

Addendum #2 - Page 1.jpg

JPG

Specs - Page 12.jpg

JPG

Addendum #1 - Page 92.jpg

JPG

Specs - Page 1.jpg

JPG

Addendum #1 - Page 19.jpg

JPG

Specs - Page 34.jpg

JPG

Addendum #1 - Page 1.jpg

JPG

Specs - Page 226.jpg

JPG

Specs - Page 46.jpg

JPG

Specs - Page 103.jpg

JPG

Specs - Page 4.jpg

JPG

Addendum #1 - Page 17.jpg

JPG

Specs - Page 44.jpg

JPG

Specs - Page 107.jpg

JPG

Specs - Page 14.jpg

JPG

Specs - Page 220.jpg

JPG

Specs - Page 16.jpg

JPG

Addendum #1 - Page 18.jpg

JPG

Addendum #1 - Page 76.jpg

JPG

Specs - Page 50.jpg

JPG

Addendum #1 - Page 72.jpg

JPG

Plans - Page 3.jpg

JPG

Addendum #1 - Page 33.jpg

JPG

Specs - Page 23.jpg

JPG

Addendum #1 - Page 13.jpg

JPG

Specs - Page 184.jpg

JPG

Addendum #1 - Page 83.jpg

JPG

Addendum #1 - Page 2.jpg

JPG

Specs - Page 6.jpg

JPG

Specs - Page 61.jpg

JPG

Specs - Page 193.jpg

JPG

Addendum #1 - Page 44.jpg

JPG

Specs - Page 176.jpg

JPG

Addendum #1 - Page 23.jpg

JPG

Addendum #1 - Page 89.jpg

JPG

Specs - Page 22.jpg

JPG

Specs - Page 70.jpg

JPG

Specs - Page 194.jpg

JPG

Specs - Page 27.jpg

JPG

Specs - Page 202.jpg

JPG

Specs - Page 53.jpg

JPG

Specs - Page 213.jpg

JPG

Addendum #1 - Page 11.jpg

JPG

Specs - Page 48.jpg

JPG

Addendum #1 - Page 65.jpg

JPG

Addendum #1 - Page 52.jpg

JPG

Specs - Page 32.jpg

JPG

Addendum #1 - Page 21.jpg

JPG

Addendum #1 - Page 49.jpg

JPG

Specs - Page 203.jpg

JPG

Specs - Page 185.jpg

JPG

Specs - Page 73.jpg

JPG

Specs - Page 144.jpg

JPG

Addendum #1 - Page 31.jpg

JPG

Specs - Page 174.jpg

JPG

Addendum #1 - Page 27.jpg

JPG

Addendum #1 - Page 12.jpg

JPG

Specs - Page 180.jpg

JPG

Plans - Page 1.jpg

JPG

Addendum #1 - Page 74.jpg

JPG

Addendum #1 - Page 94.jpg

JPG

Specs - Page 189.jpg

JPG

Specs - Page 40.jpg

JPG

Specs - Page 168.jpg

JPG

Specs - Page 95.jpg

JPG

Specs - Page 177.jpg

JPG

Specs - Page 52.jpg

JPG

Addendum #1 - Page 85.jpg

JPG

Specs - Page 51.jpg

JPG

Addendum #1 - Page 62.jpg

JPG

Addendum #1 - Page 10.jpg

JPG

Specs - Page 225.jpg

JPG

Specs - Page 198.jpg

JPG

Specs - Page 38.jpg

JPG

Specs - Page 113.jpg

JPG

Addendum #1 - Page 45.jpg

JPG

Specs - Page 221.jpg

JPG

Specs - Page 101.jpg

JPG

Addendum #1 - Page 96.jpg

JPG

Specs - Page 147.jpg

JPG

Addendum #1 - Page 71.jpg

JPG

Specs - Page 99.jpg

JPG

Specs - Page 157.jpg

JPG

Addendum #1 - Page 8.jpg

JPG

Specs - Page 211.jpg

JPG

Specs - Page 109.jpg

JPG

Specs - Page 167.jpg

JPG

Specs - Page 131.jpg

JPG

Specs - Page 85.jpg

JPG

Specs - Page 17.jpg

JPG

Addendum #2 - Page 2.jpg

JPG

Specs - Page 45.jpg

JPG

Specs - Page 205.jpg

JPG

Specs - Page 74.jpg

JPG

Specs - Page 36.jpg

JPG

Addendum #1 - Page 79.jpg

JPG

Addendum #1 - Page 47.jpg

JPG

Specs - Page 79.jpg

JPG

Specs - Page 224.jpg

JPG

Specs - Page 127.jpg

JPG

Addendum #1 - Page 69.jpg

JPG

Specs - Page 158.jpg

JPG

Specs - Page 43.jpg

JPG

Specs - Page 190.jpg

JPG

Addendum #1 - Page 6.jpg

JPG

Addendum #1 - Page 39.jpg

JPG

Specs - Page 146.jpg

JPG

Addendum #1 - Page 61.jpg

JPG

Specs - Page 76.jpg

JPG

Addendum #1 - Page 58.jpg

JPG

Addendum #1 - Page 63.jpg

JPG

Specs - Page 227.jpg

JPG

Addendum #1 - Page 43.jpg

JPG

Specs - Page 42.jpg

JPG

Specs - Page 123.jpg

JPG

Specs - Page 77.jpg

JPG

Specs - Page 7.jpg

JPG

Specs - Page 153.jpg

JPG

Addendum #1 - Page 46.jpg

JPG

Specs - Page 216.jpg

JPG

Specs - Page 165.jpg

JPG

Specs - Page 173.jpg

JPG

Specs - Page 148.jpg

JPG

Addendum #1 - Page 84.jpg

JPG

Specs - Page 87.jpg

JPG

Specs - Page 67.jpg

JPG

Addendum #1 - Page 90.jpg

JPG

Addendum #1 - Page 51.jpg

JPG

Specs - Page 191.jpg

JPG

Addendum #1 - Page 98.jpg

JPG

Specs - Page 217.jpg

JPG

Specs - Page 126.jpg

JPG

Specs - Page 91.jpg

JPG

Specs - Page 195.jpg

JPG

Addendum #1 - Page 30.jpg

JPG

Specs - Page 119.jpg

JPG

Specs - Page 93.jpg

JPG

Specs - Page 132.jpg

JPG

Specs - Page 138.jpg

JPG

Addendum #1 - Page 54.jpg

JPG

Specs - Page 115.jpg

JPG

Specs - Page 112.jpg

JPG

Specs - Page 219.jpg

JPG

Specs - Page 143.jpg

JPG

Specs - Page 172.jpg

JPG

Specs - Page 179.jpg

JPG

Addendum #1 - Page 80.jpg

JPG

Addendum #1 - Page 68.jpg

JPG

Specs - Page 120.jpg

JPG

Plans - Page 2.jpg

JPG

Plans - Page 4.jpg

JPG

Specs - Page 204.jpg

JPG

Specs - Page 209.jpg

JPG

Specs - Page 163.jpg

JPG

Specs - Page 2.jpg

JPG

Specs - Page 29.jpg

JPG

Specs - Page 110.jpg

JPG

Specs - Page 212.jpg

JPG

Specs - Page 171.jpg

JPG

Specs - Page 97.jpg

JPG

Specs - Page 196.jpg

JPG

Specs - Page 164.jpg

JPG

Addendum #1 - Page 91.jpg

JPG

Specs - Page 208.jpg

JPG

Specs - Page 19.jpg

JPG

Specs - Page 155.jpg

JPG

Specs - Page 159.jpg

JPG

Addendum #1 - Page 15.jpg

JPG

Addendum #1 - Page 40.jpg

JPG

Specs - Page 125.jpg

JPG

Specs - Page 162.jpg

JPG

Specs - Page 175.jpg

JPG

Specs - Page 133.jpg

JPG

Specs - Page 15.jpg

JPG

Specs - Page 136.jpg

JPG

Specs - Page 26.jpg

JPG

Specs - Page 152.jpg

JPG

Addendum #1 - Page 53.jpg

JPG

Specs - Page 223.jpg

JPG

Specs - Page 82.jpg

JPG

Specs - Page 9.jpg

JPG

Specs - Page 183.jpg

JPG

Addendum #1 - Page 26.jpg

JPG

Addendum #1 - Page 78.jpg

JPG

Addendum #1 - Page 35.jpg

JPG

Specs - Page 80.jpg

JPG

Specs - Page 102.jpg

JPG

Addendum #1 - Page 41.jpg

JPG

Specs - Page 206.jpg

JPG

Specs - Page 71.jpg

JPG

Addendum #1 - Page 28.jpg

JPG

Specs - Page 60.jpg

JPG

Specs - Page 72.jpg

JPG

Specs - Page 30.jpg

JPG

Specs - Page 142.jpg

JPG

Specs - Page 33.jpg

JPG

Addendum #1 - Page 75.jpg

JPG

Addendum #1 - Page 14.jpg

JPG

Specs - Page 83.jpg

JPG

Specs - Page 8.jpg

JPG

Addendum #1 - Page 48.jpg

JPG

Specs - Page 145.jpg

JPG

Specs - Page 210.jpg

JPG

Specs - Page 13.jpg

JPG

Specs - Page 56.jpg

JPG

Specs - Page 81.jpg

JPG

Specs - Page 170.jpg

JPG

Specs - Page 135.jpg

JPG

Specs - Page 98.jpg

JPG

Addendum #1 - Page 37.jpg

JPG

Specs - Page 199.jpg

JPG

Addendum #1 - Page 95.jpg

JPG

Specs - Page 106.jpg

JPG

Addendum #1 - Page 59.jpg

JPG

Addendum #1 - Page 29.jpg

JPG

Specs - Page 5.jpg

JPG

Addendum #1 - Page 25.jpg

JPG

Specs - Page 228.jpg

JPG

Specs - Page 86.jpg

JPG

Addendum #1 - Page 9.jpg

JPG

Specs - Page 124.jpg

JPG

Addendum #1 - Page 64.jpg

JPG

Specs - Page 57.jpg

JPG

Specs - Page 75.jpg

JPG

Addendum #1 - Page 7.jpg

JPG

Specs - Page 92.jpg

JPG

Addendum #1 - Page 77.jpg

JPG

Specs - Page 151.jpg

JPG

Specs - Page 24.jpg

JPG

Addendum #1 - Page 60.jpg

JPG

Addendum #1 - Page 86.jpg

JPG

Addendum #1 - Page 70.jpg

JPG

Specs - Page 214.jpg

JPG

Specs - Page 111.jpg

JPG

Addendum #1 - Page 22.jpg

JPG

Addendum #1 - Page 38.jpg

JPG

Specs - Page 39.jpg

JPG

Specs - Page 108.jpg

JPG

Specs - Page 178.jpg

JPG

Addendum #1 - Page 81.jpg

JPG

Specs - Page 63.jpg

JPG

Specs - Page 37.jpg

JPG

Addendum #1 - Page 36.jpg

JPG

Specs - Page 117.jpg

JPG

Specs - Page 31.jpg

JPG

Specs - Page 10.jpg

JPG

Specs - Page 156.jpg

JPG

Specs - Page 28.jpg

JPG

Specs - Page 187.jpg

JPG

Addendum #1 - Page 50.jpg

JPG

Specs - Page 154.jpg

JPG

Specs - Page 197.jpg

JPG

Specs - Page 161.jpg

JPG

Specs - Page 114.jpg

JPG

Specs - Page 100.jpg

JPG

Specs - Page 121.jpg

JPG

Addendum #1 - Page 88.jpg

JPG

Specs - Page 41.jpg

JPG

Specs - Page 141.jpg

JPG

Addendum #1 - Page 4.jpg

JPG

Specs - Page 47.jpg

JPG

Specs - Page 49.jpg

JPG

Specs - Page 65.jpg

JPG

Specs - Page 200.jpg

JPG

Specs - Page 116.jpg

JPG

Specs - Page 118.jpg

JPG

Specs - Page 169.jpg

JPG

Specs - Page 84.jpg

JPG

Specs - Page 137.jpg

JPG

Specs - Page 18.jpg

JPG

Addendum #1 - Page 73.jpg

JPG

Specs - Page 186.jpg

JPG

Addendum #1 - Page 99.jpg

JPG

Addendum #1 - Page 55.jpg

JPG

Specs - Page 54.jpg

JPG

Specs - Page 105.jpg

JPG

Specs - Page 89.jpg

JPG

Specs - Page 207.jpg

JPG

Addendum #1 - Page 3.jpg

JPG

Specs - Page 3.jpg

JPG

Specs - Page 160.jpg

JPG

Addendum #1 - Page 87.jpg

JPG

Addendum #1 - Page 24.jpg

JPG

Specs - Page 192.jpg

JPG

Addendum #1 - Page 56.jpg

JPG

Specs - Page 140.jpg

JPG

Addendum #1 - Page 34.jpg

JPG

Specs - Page 166.jpg

JPG

Specs - Page 21.jpg

JPG

Specs - Page 78.jpg

JPG

Addendum #1 - Page 82.jpg

JPG

Specs - Page 104.jpg

JPG

Specs - Page 134.jpg

JPG

Addendum #1 - Page 32.jpg

JPG

Specs - Page 66.jpg

JPG

Addendum #1 - Page 93.jpg

JPG

Specs - Page 88.jpg

JPG

Specs - Page 64.jpg

JPG

Plans - Page 5.jpg

JPG

Addendum #1 - Page 57.jpg

JPG

Specs - Page 35.jpg

JPG

Specs - Page 58.jpg

JPG

Addendum #1 - Page 5.jpg

JPG

Specs - Page 122.jpg

JPG

Specs - Page 62.jpg

JPG

Specs - Page 96.jpg

JPG

Specs - Page 90.jpg

JPG

Specs - Page 150.jpg

JPG

Specs - Page 69.jpg

JPG

Specs - Page 68.jpg

JPG

Specs - Page 55.jpg

JPG

Specs - Page 20.jpg

JPG

Addendum #1 - Page 42.jpg

JPG

Addendum #1 - Page 97.jpg

JPG

Specs - Page 25.jpg

JPG

Specs - Page 139.jpg

JPG

Specs - Page 149.jpg

JPG

Addendum #1 - Page 66.jpg

JPG

Addendum #1 - Page 20.jpg

JPG

Addendum #1 - Page 16.jpg

JPG

Specs - Page 94.jpg

JPG

Specs - Page 201.jpg

JPG

Specs - Page 182.jpg

JPG

Specs - Page 215.jpg

JPG

Specs - Page 130.jpg

JPG

Specs - Page 11.jpg

JPG

Specs - Page 59.jpg

JPG

Specs - Page 188.jpg

JPG

Specs - Page 129.jpg

JPG

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Jefferson Transit Authority
Contacts1 person available
OfficeN/A
Organization / Agency
Washington → Jefferson Transit Authority
View Agency Profile
Office AddressN/A
Contacts
Sydney Thompson

Interested Companies (5)

Show more
Nordland Construction NW
Nordland, WA
Van Ness Construction
Port Hadlock, WA
PNW Heavy Civil Construction
Seattle, WA

See All 5 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Scope of Work to be completed under this Contract consists of the installation of a fire main, pressure reducing valve, and fire hydrants; removal of an existing fire hydrant; removal and replacement of cement concrete pavement and curb; removal of existing trees; installation of storm drainage improvements and bollards; restoration of disturbed areas; and other related improvements. All work shall be performed in accordance with the Contract Plans, these Contract Provisions, and the Standard Specifications.
Pre-Bid Meeting: 7/29 @ 8:00 am at 63 Four Corners Road, Port Townsend, WA 98368

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS