Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on November 1, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Tinker AFB WWYK200323 Repair HVAC Diffuser and Duct Work B3001

Closed
WWYK200323Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation, with a response deadline of November 4, 2026. The project falls under NAICS code 236220 and focuses on basin improvements within the Riverside or Los Angeles project areas. A critical component of this solicitation is strict adherence to six Good Faith Effort (GFE) requirements designed to ensure DBE participation and secure project financing. Bidders must provide proof of GFE #2, which requires posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for one day, as well as proof of GFE #5, involving the utilization of the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to submit documentation for these two specific efforts within the bid package will result in the proposal being deemed non-responsive. Additionally, outreach documentation for GFE #1 may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 2 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation involving soil stabilization and utility relocation; construction of the plant including a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. The total duration for the project is 915 calendar days, and the contractor must maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation encourages participation from small and disadvantaged businesses, including DBE, DVBE, MBE, WBE, and SBE certified firms. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors are required to use the Textura electronic invoicing system, provide a 100 percent performance and labor bond if requested, and adhere to arcflash compliance for electrical work. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026.
C. Overaa & Co.

POSTED

about 2 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site work such as clearing, rock excavation, grading, and wetland mitigation, as well as the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building. Demolition of 18 existing magazines and buildings 524 and 393 is also required. Technical requirements encompass a wide range of trades including demolition, abatement, concrete, structural steel, roofing, electrical, plumbing, and mechanical systems. Specialized construction features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. The project also involves installing primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact the primary point of contact by the October 31, 2026, deadline to receive bid documents.
J & J Contractors, Inc

POSTED

about 2 hours ago

DEADLINE

in 10 days
NAICS: 236220
New
SLED
Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement
Solicitation # Request-for-Bid-Coyote-Ridge-Golf-Course-Secondary-Emergency-Exit-from-Clubhouse-Basement.pdf
Colville Fuels LLC is soliciting bids for the construction of a code-compliant secondary emergency exit from the clubhouse basement at Coyote Ridge Golf Course in Washington. The scope of work includes saw cutting reinforced concrete walls, installing a commercial-grade exterior door assembly with panic hardware, and excavating a permanent ADA-accessible egress path with required drainage, retaining walls, and handrails. The contractor must ensure all work is code-compliant, coordinate inspections with the Authority Having Jurisdiction, and restore all affected surfaces to match existing clubhouse architecture. This is a price-based invitation for bids where the award will be granted to the lowest responsive and qualified bidder, subject to budgetary limits and Indian preference requirements. Preference is tiered from 100% Colville Business Enterprises down to non-certified Indian-owned businesses, with allowable price differentials based on the total bid amount. Bidders must submit a firm fixed price bid, a performance schedule, a subcontracting plan, and evidence of financial stability, insurance, and licensing by November 20, 2026. The project is expected to be completed by March 31, 2026, though this date is weather-dependent. Final contract terms and payment conditions will be negotiated upon the selection of the successful bidder.
Confederated Tribes of the Colville Reservation

POSTED

about 3 hours ago

DEADLINE

in about 1 month

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Tinker AFB, OK, 73145, USA

Set-Aside

SBA

Documents

2

Attachment+1+EAL+List+-+BLANK+to+Contractor_WWYK200323+.xlsx

XLSX

WWYK200323+Statement+of+Requirement.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8137 Afsc Pzioc
Contacts2 people available
OfficeTINKER AFB, OK, 73145-9125, USA
Office AddressTINKER AFB, OK, 73145-9125, USA
Contacts

Full Description

Show more
MAC BOA Contractors, Please see attached Statement of Work and Drawings for Tinker MACB Project: WWYK200323 - REPAIR HVAC DIFFUSER AND DUCTOWRK, B3001 POST P51-R59, SOW, Drawings and Specifications, other documents will be provided via Contractor CD at the initial site visit. **ONLY TINKER MACBOA HOLDERS CAN ATTEND AND PROPOSE** 1. Site visit attendance by the MAC BOA Prime Contractor is mandatory to be considered responsive. Please respond to this email to provide an RSVP response with the number of Prime Contractor and Sub-Contractor personnel expected to attend to the below points of contact with confirmation of intent to attend the initial site visit NLT 2:00pm CST, Friday 8 November 2024. If a MAC BOA Prime Contractor fails to meet this RSVP deadline, the initial site visit information will not be released to your organization. 2. Attached you will find an Entry Authorization List (EAL) Excel spreadsheet, please fill in all information for individuals who will need base access that do not currently have base access to include any Prime Contractor and Sub-Contractor personnel that plan on attending the initial site visit. Provide email copy of the Excel spreadsheet to the below points of contact NLT 2:00pm CST, Tuesday 12 November 2024. 3. Estimated Initial Site visit date: (21 November 2024). A meeting invite will be sent out with the firm initial site visit date and time to all Prime Contractors that respond per paragraph 1 above. Do not make travel plans until the firm initial site visit date/time is provided. 4. IAW MAC BOA guidelines; Small Business Set-Aside. (If >$25 mil). 5. IAW FAR 36.204(e): The estimated price should be described in terms of the following price range: Between $1,000,000 and $5,000,000. **ONLY TINKER MACBOA HOLDERS CAN ATTEND AND PROPOSE ** Point of Contact Information: Tamra Torres - Contracting Officer tamra.torres@us.af.mil ? Emma Bain- Contracting Specialist emma.bain.1@us.af.mil **ONLY TINKER MACBOA HOLDERS CAN ATTEND AND PROPOSE**

More opportunities from Department Of Defense → FA8137 Afsc Pzioc

Same awarding agency

NAICS: 238190
New
Federal
WWYK260004 - REPAIR STRUCTURAL INTEGRITY, B1134, POST 34 & NORTH WALL
Solicitation # FA813727R0001
Solicitation FA813727R0001 is a firm fixed price request for proposal for the repair of structural integrity at Building 1134, Post 34, and the North Wall at Tinker Air Force Base, Oklahoma. The project scope involves repairing or replacing eroded shear braces and the base of Post 34 to prevent potential failure. This opportunity is restricted exclusively to Tinker AFB MAC BOA holders, and attendance at the initial site visit on October 22, 2026, is mandatory for eligibility to propose. Interested prime contractors must RSVP by October 20, 2026, and provide an Entry Access List for any personnel requiring base access. The estimated magnitude of the construction is between $100,000 and $250,000, with a performance period of 195 calendar days from the notice to proceed. The acquisition will be awarded based on the Lowest Price Technically Acceptable (LPTA) process, where the award goes to the responsible offeror with a technically acceptable proposal and the lowest evaluated price. Technical evaluations will focus on capability and management, and any deficiency in a subfactor will render a proposal un-awardable. Proposals must be submitted in separate technical and price volumes, with pricing broken down by the CSI Master Format System. The contract is a total small business set-aside and is subject to the Davis-Bacon Act, Buy American Construction Materials requirements, and DFARS cybersecurity standards. Liquidated damages for delays are set at $227.75 per calendar day.
Other Foundation, Structure, and Building Exterior Contractors

POSTED

4 days ago

DEADLINE

in 28 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS