Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Kansas was posted on May 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Tomahawk Creek Wastewater Treatment Facility Process Improvements Project

Closed
2026-017State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract calls for a series of process improvements at the Tomahawk Creek Wastewater Treatment Facility to enhance odor control, sludge handling, and operational efficiency. Key upgrades include installing covers and odor control systems on anaerobic and pre-anoxic basins, improving sidestream nitrogen treatment by rerouting certain flows to prevent solids buildup, and reducing hydrogen sulfide emissions through ferric chloride dosing. Other enhancements include modifications to allow co-thickened sludge discharge directly to the wetwell, adding mixers to pre-anoxic zones to improve scum movement, replacing a ladder with a safer stair tower for digester access, and upgrading chlorine contact basin components to corrosion-resistant materials. Additional improvements focus on safety and operational automation, such as electric actuators installed on various influent gates, safety platforms for disk filters, and a new storm drain isolation system near ferric chloride unloading to prevent chemical spills. Bidders are required to submit sealed bids electronically through IonWave by June 25, 2026, including a bid bond equal to 5% of the total bid amount issued by a surety licensed in Kansas. The project is managed by Johnson County, Kansas, with Nicole Averell as the primary contact.

General Info

Process improvements at Tomahawk Creek plant including odor control, sludge handling, safety, and automation upgrades.

Agency

Kansas → Johnson CountyView Agency

NAICS

221320 - Sewage Treatment FacilitiesView NAICS

Place of Performance

KS, USA

Set-Aside

NONE

Documents

(12)

Tomahawk Creek Contract 26 WWTF Expansion Volume 8 of 8

PDFspecifications

Tomahawk Creek WWTF Process Improvements 100% Specifications and IFB

PDFifb

Questionnaire for Manufacturer Information Submission

DOCXquestionnaire

Bid Bond for Johnson County Wastewater Tomahawk Creek WWTF Process Improvements

DOCXbid-bond

Tomahawk Creek Contract 26 WWTF Expansion Structural and Mechanical Plans V2

PDFspecifications

Tomahawk Creek Contract 26 WWTF Expansion Electrical and Mechanical Plans V4

PDFspecifications

Tomahawk Creek Contract 26 WWTF Expansion Volume 1 of 8

PDFspecifications

Tomahawk Creek WWTF Process Improvements 100% Drawings

PDFspecifications

Tomahawk Creek Contract 26 WWTF Expansion Structural Drawings Volume 4

PDFspecifications

Tomahawk Creek Contract 26 WWTF Expansion Volume 7 of 8

PDFspecifications

2026-017 Tomahawk Creek Wastewater Treatment Facility Process Improvements Project Invitation for Bid

OCTET-STREAMifb

Tomahawk Creek Contract 26 WWTF Expansion General Notes Volume 6

PDFspecifications

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyKansas → Johnson County
Contacts1 person available
OfficeKS, USA
Organization / Agency
Kansas → Johnson County
View Agency Profile
Office AddressKS, USA
Contacts
Nicole Averell

Full Description

Show more
S e a l e d b i ds f or Bi d R e q u est No. 2026-017 f or J o h nson C o u n t y W a s te w a ter Tomahawk Creek WWTF Process Improvements Project – Contract No. THM1-C031. The w ork co n s i s ts of th e f ol l o w i n g improvements to the Tomahawk Creek WWTF : A. Odor Control Improvements: Installation of covers on the BNR Basin anaerobic and pre-anoxic basins, and addition of Odor Control System No. 4. Customized rubber mat covers will also be added to the BNR Influent Splitter Box and RAS Splitter boxes to mitigate odor complaints and improve operational flexibility for VFA production. B. Sidestream Nitrogen Treatment Improvements: Separation of centrifuge startup/shutdown slop flows from the main centrate discharges and redirection to the plant drain to reduce solids accumulation in the Centrate Holding Basin. C. Gravity Thickener H 2 S Reduction: Addition of ferric chloride feed capability to the Primary Sludge Gravity Thickener/Fermenter to reduce hydrogen sulfide generation and loading on odor control units. D. Co-Thickening Improvements: Modifications to allow thickened primary sludge (TPS) to discharge directly to the Co-Thickened Sludge (CTS) wetwell, addition of a fifth digester feed pump for continuous mixing, and installation of pressure sensors on digester feed pump discharge piping with SCADA integration. E. Sludge Cleanout Manhole: Addition of a sludge cleanout manhole over the (3) 4” CTS lines between the Solids Processing Building and Digester Control Building to facilitate future line cleaning. F. Primary Clarifier Improvements: Construction of an access drive and installation of cleanouts for scum pit drainpipes, and addition of electric actuators to six PC Influent Slide Gates at the Headworks Building. G. Micro-C Dosing Improvements: Replacement of potable water with Plant Effluent Water (PEW) as carrier water for Micro-C dosing, and rerouting of Micro-C discharge lines above grade for improved visibility and control. H. Pre-Anoxic Mixers: Addition of a second submersible mixer in pre-anoxic zones PAX1-1 and 3-1 to facilitate the movement of scum out of pre-anoxic zones. I. Digester No. 3 Access Improvements: Replacement of the existing 21-ft tall cageless ladder with a stair tower to improve safety and accessibility to the digester roof. Demo of existing ladder. J. Chlorine Contact Basin Improvements: Replacement of all aluminum slide gates with corrosion-resistant materials due to chloride-induced deterioration. K. Filter Complex Improvements: Installation of an electric actuator on the secondary effluent/filter influent gate for automated wet weather operation, and addition of safety platforms to the eight disk filter basins to enhance maintenance access and safety. L. Storm Drain Isolation near Ferric Tanks: Installation of an isolation drainage system near the ferric chloride truck unloading station to prevent chemical spills from entering the storm sewer system, as identified by KDHE. Bi d d e rs s h a l l su b m i t w i th t h e i r b i d a b i d b o n d i ss u e d b y a s u r e t y c o m p a n y l i c e n se d to do b us i n ess i n t he S t a te of K a nsas i n t h e a m o u nt of f i v e p e r ce nt (5%) of the to t al a m o u nt of th ei r b i d. S aid g u ara n tee s h a l l b e m a d e p a y a ble to the B o a rd of Co u n t y Co m m i ss i o n ers of Jo h nson C o u n t y , K a nsas. All bids shall be submitted electronically on IonWave .

More opportunities from Kansas → Johnson County

Same awarding agency

NAICS: 811210
SLED
SCADA System Maintenance & Integration Services
Solicitation # 2026-021
Johnson County Wastewater is soliciting proposals under RFP 2026-021 for SCADA System Maintenance & Integration Services, issued by Johnson County, Kansas through its Financial Management and Administration Purchasing Division. The solicitation was posted on August 13, 2026, with proposals due by September 17, 2026 at 2:00 PM, and all questions and responses must be handled electronically through the county’s bidding system. Nicole Averell, CPPO, CPPB is the Purchasing Administrator and primary point of contact, with correspondence also available by phone and email. The work is for Kansas performance and is aligned to NAICS code 811210. A mandatory virtual pre-proposal conference is scheduled for August 27, 2026, and respondents were required to register as suppliers at least two business days before opening. Proposals must be submitted as a single electronically signed PDF, with a 100MB limit, and additional files can be placed in the other response attachment area. If electronic submission is not possible, sealed paper proposals may be arranged through the Purchasing Division in Olathe. The solicitation includes standard forms and templates, along with appendices such as a map of the wastewater treatment plants and pump stations and an example invoice format. The scope is to support SCADA operations across six wastewater treatment plants and 34 pump stations, including preventive maintenance on radios, PLCs, RTUs, and HMI screens; network communications support and troubleshooting for industrial Ethernet and Modbus TCP/IP over copper and fiber links; SCADA design and integration protocol documentation; facility planning reports; training for JCW staff on new hardware and software; attendance at progress and startup/shutdown meetings; and emergency response within two hours, either on site or remotely. The contractor must designate a project manager and is expected to provide ongoing troubleshooting, programming, software support, and upgrades. Pricing is structured as firm fixed prices FOB destination, freight allowed, with packing, handling, and shipping included, and estimates require a ceiling cost that cannot be exceeded without written authorization. The schedule of hourly billing rates calls for categories such as programmer/integrator, designer/drafter, service technician, estimator/submittals coordinator, clerk/typist/secretary, materials markup, subcontractor markup, and purchasing card charge. The initial term is approximately 12 months from notice of award, with the county reserving up to four additional 12-month renewals, and prices remain valid through award for thirteen months from the February 2027 opening reference noted in the RFP
Electronic and Precision Equipment Repair and Maintenance

POSTED

30 days ago

DEADLINE

in 5 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS