Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on June 9, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Tone Visual Nurse Call System

Closed
09-TC-0411Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

NAICS

334220 - Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing

Place of Performance

Wilford Hall Medical Center 2200 Bergquist Dr., Ste 1 Lackland AFB, TX 78236-5000, TX, USA

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA3016 502 Cons Cl
Contacts1 person available
OfficeJBSA LACKLAND, TX, 78236-5286, USA
Office AddressJBSA LACKLAND, TX, 78236-5286, USA

Full Description

Show more
1) Type of Notification: Sources Sought This is a sources sought synopsis only. The purpose of this notice is to gain knowledge of potential qualified sources. Responses to this notice shall include the following: (a) company name; (b) address; (c) point of contact; (d) "number of employees" as defined by the Federal Acquisition Regulation (FAR) part 19.101; and (e) the amount of "annual receipts" as defined by the Federal Acquisition Regulation (FAR) part 19. In addition, the respondent must provide a capability statement that addresses the organization's qualifications and ability to perform as a prime contractor the work described below. 2) Description: Non-Personal Services (Provide and install a fully operational Audio Visual Nurse Call & Tone Visual System with Code Blue) The contractor shall provide all transportation, personnel, labor, tools, equipment, materials, programming, integration, and training and updated as-built drawings as required for the removal and deposition of the existing Dukane Nurse Call System and provide and install a new Audio Visual Nurse Call & Tone Visual System with Code Blue. The existing conduits and outlet boxes shall be utilized for cable routing and patient room equipment components. The new Tone Visual Nurse Call System shall be integrated and fully compatible with the existing Dukane Nurse Call System that is still operational in other wings of the medical center and also the MTX6000 CICN System. The System must integrate with Labor & Delivery Unit. The System must have the capability to easily convert to an audio visual featured sytem. The existing cross sytem paging for emergency baby deliveries must also function between the new system and Labor & Delivery Unit. The Labor & Delivery and Antepartum Units must be monitored to ensure compatibility of the new installs. 3) Equipment: The contractor shall provide as a minimum these items: Four (4) Emergency Lavatory/Toilet/Shower Alarm Units; Thirty-eight (38) Staff Emergency Stations; Thirty-eight (38) Code Blue Stations; Eight (8) Duty Stations; Thirty-eight (38) Door Lights; Six (6) Emergency Call Cord Units in Parent rooms; and one (1) Central Cabinet fully loaded (circuit cards, etc...) The existing Code Blue Elaspse Timers shall be reinstalled into the new system and reprogrammed. All Lavatory alarm units, etc...shall have the Clean-cord type strings. Any firewall penetrations must be resealed with a government approved sealant. All cabling shall have an ID marker at end points. All Door and Dome Light Units shall have white flashing lights with an audible annunciate at each duty station. 4) Place of Performance: Wilford Hall Medical Center (WHMC) 2200 Bergquist Dr., Ste 1 Lackland AFB, TX 78236-5000 All prospective offerors who may be interested in participating in a future procurement for this requirement should respond to this Source Sought Notice by contacting: Tara Sidwell Address: 37 CONS, 1655 Selfridge Ave., Building 5450 Lackland AFB, TX 78236-5253 E-mail: tara.sidwell@lackland.af.mil Phone numbers: (210) 671-6017

More opportunities from Department Of Defense → FA3016 502 Cons Cl

Same awarding agency

NAICS: 238210
New
Federal
DCF3 PROJECTION SYSTEM
Solicitation # A070977
The Department of Defense, specifically the 502 Cons Cl under the Office of the Air Force, is issuing a sources-sought Request for Information (RFI) for the DCF3 Projection System, solicitation number A070977. The objective is to identify capable providers for the installation of standalone audio-visual (AV) classroom equipment in sixteen classrooms at the BMT DCF3 (Building 9270) located at JBSA-Lackland, Texas. The scope of work includes providing all personnel, equipment, and materials to install laser projectors, zoom lenses, lecterns, scaling switchers, and associated cabling. The system must operate as a standalone solution and is strictly prohibited from interfacing with the Air Force network. Key deliverables include the integration of Apple Government-Furnished Equipment, the provision of technical documentation, and the delivery of user training for staff. Technical requirements specify that projectors and extension columns must be Trade Agreement Act (TAA) compliant, and touch panels must be FCC Class A certified. The contractor is responsible for ensuring high video resolution and sound quality, with final acceptance based on a post-installation walkthrough and inspection at the project site. Security requirements are stringent, requiring criminal history checks and background investigations for all personnel accessing the base, as well as strict adherence to Force Protection Condition procedures and a total prohibition of weapons on site. This RFI is strictly voluntary and is not a formal solicitation for quotes; interested parties must submit their capabilities and open-market pricing via email to Tommie Low by October 27, 2026, at 10 a.m. CST.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

1 day ago

DEADLINE

in 7 days
View Details
NAICS: 238220
New
Federal
Brand Name or Equal - WaterFurnace Model: UBH015R for B3631 & B3635 - Turnkey Replacement
Solicitation # A070764SS
The 502d Contracting Squadron is conducting market research via a Sources Sought Synopsis to identify capable industry sources for the turnkey removal and replacement of 48 ceiling-suspended Dedicated Outside Air System Water-Source Heat Pumps at the JBSA Ft Sam Houston San Antonio Military Medical Center Dormitory Annex, specifically in buildings B3631 and B3635. The project is projected as a Firm-Fixed Priced Purchase Order under NAICS code 238220. The contractor must provide all personnel, equipment, and supervision to install units that meet strict technical specifications, including a 1.25-ton capacity, horizontal ceiling-plenum configuration, and the use of low-GWP refrigerants such as R-454B or R-32, as R-410A is strictly prohibited. A critical requirement is that replacement units must fit through existing access openings measuring approximately 3 feet 11.5 inches by 2 feet to avoid structural demolition. The scope of work includes the integration of the units into the central Building Automation System via BACnet IP/MSTP and the use of AHR/ISO 13256-1 certified water-to-refrigerant coaxial heat exchangers. Performance must be completed within 275 days of award. Interested respondents must provide company identification, SAM.gov certifications, and confirmation that technicians hold EPA Section 608 Universal Certifications. Small business prime contractors must also verify they can cover at least 51 percent of the contract cost with their own personnel. Responses are due by October 26, 2026, and must be submitted in PDF format with a maximum length of ten pages, excluding equipment cut sheets.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

6 days ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS