Town Creek Reservoir Dam Abutment Drain & Down Drain
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the installation of repairs to the Town Creek Reservoir Dam's down drain system, including erosion and sediment control measures, excavation, and installation of a new high-density polyethylene (HDPE) down drain with a concrete headwall. Bidders are required to submit sealed bids by August 12, 2025, at the Macon Water Authority's office and must attend a mandatory pre-bid meeting scheduled for July 29, 2025, at the Amerson Water Treatment Plant. All questions regarding the bid must be submitted by August 5, 2025. The project scope encompasses installing perimeter control BMPs, excavating and establishing new drain materials at the right abutment, and repairing the existing down drain by removing the old pipe, installing the new conduit, backfilling, and restoring the disturbed areas with topsoil and turf. Contract documents are available through the engineer, Freese and Nichols, and bidders must request these documents to be eligible to bid, as no partial sets will be issued. The project is valued between $500,000 and $1,500,000, and inquiries can be directed to Heather Veal at the Macon Water Authority.
General Info
Agency
Place of Performance
GA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The Project generally consists of: 1. Installing erosion and sediment perimeter control BMPs 2. Installing right abutment drain: a. Excavating to existing abutment drain b. Determine extents of seepage c. Establish subgrade and install new drain material d. Backfill drain field e. Re-dress gravel access road 3. Repairing existing down drain: a. Excavating and removing existing corrugated plastic pipe down drain b. Installing new 16¿ HDPE down drain and concrete headwall. c. Backfilling and compacting soil over newly installed down drain conduit d. Place topsoil and establish permanent turf within disturbed area
Copies of Contract Documents may be requested from the Engineer (Freese and Nichols, 360 Interstate N. Parkway, Suite 250, Atlanta, Georgia 30339, via email at contact@example.gov). No partial sets of bidding documents shall be issued. Bidders must request the Contract Documents in order to be eligible to submit a bid. Bid documents on the MWA website are for informational purposes only.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS