Installation Of Above Ground Fuel Tank At Police Aviation

Closed
8160State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
Demolition of Connex Box Structures and Removal of Debris
Solicitation # ACFD 26-03
The Alameda County Fire Department (ACFD) is soliciting sealed bids for solicitation number ACFD 26-03, focused on the demolition of Connex Box Structures and the removal of debris at 890 Lola Street in San Leandro, California. This is a stipulated sum, single-prime contract with a total project duration of 120 calendar days. Bids must be submitted by 2:00 pm on December 10, 2026, at 6363 Clark Ave., Dublin, California. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid amount. Required submission documents include a bid bond or security of 10 percent of the total bid price, a non-collusion declaration, a debarment form, and a designated subcontractors list. The successful contractor must provide 100 percent performance and payment bonds and adhere to California Public Works Contract requirements, including the payment of prevailing wages. Key operational requirements include the submission of a site security and logistics plan addressing tool control and working around inmates, as well as strict adherence to soil dust mitigation and hazardous materials procedures. Project milestones range from the initial kick-off meeting and equipment delivery to final site clearance. The contractor is also required to comply with the Americans with Disability Act and Title VII of the Civil Rights Act of 1964. All work is subject to inspection and potential rejection by the ACFD and the Construction Manager to ensure conformity with technical specifications and industry standards.
AC Fire Department

POSTED

about 9 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract involves providing all necessary labor, materials, and equipment to install a fully operational above-ground fuel tank at the Police Aviation facility in Riverside, California. The scope includes site improvements, electrical connections, fuel monitoring systems, and fuel delivery equipment, all to be completed in accordance with detailed technical specifications and drawings provided in the bid package. The project aims to ensure a complete and functional fuel storage and delivery system that meets safety and operational standards. The solicitation, posted on July 8, 2025, with a deadline for responses on July 29, 2025, is managed by the City of Riverside under the California SLED organization. The project’s estimated value ranges between $100,000 and $500,000, and it falls under NAICS code 238910, which pertains to site preparation contractors. Interested parties can access further details and submit their responses through the provided online portal.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Oct 9, 2024 to Jul 29, 2025. The notice title changed. NAICS code changed from 541611 to 238910. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Riverside
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Provide all labor, materials and equipment necessary to install a fully operationalabove ground fuel tank including all site improvements, electrical connections, fuel monitoring and fuel deliveryequipment in accordance with the technical specifications and detail drawings included as a part of this bid package

More opportunities from California → City of Riverside

Same awarding agency

NAICS: 237110
SLED
Site Modifications At The Palmyrita Water Treatment Plant For Pfas Removal
Solicitation # RPU-8289
The City of Riverside Public Utilities Department is soliciting bids for solicitation RPU-8289 to perform site modifications at the Palmyrita Water Treatment Plant for PFAS removal. The scope of work includes the construction of a prefilter system, booster pump station, electrical building, and emergency generator, as well as the furnishing and loading of IX media. Additional requirements include SCADA integration, programming, and the implementation of an identification system for vessels and piping. The project is subject to Build America Buy America and American Iron and Steel requirements, and the award will be granted to the lowest responsive and responsible bidder. Bids are due by November 24, 2026, and must be submitted electronically via the designated bidding website. Required documentation includes a bid bond of at least 10 percent of the bid amount, a non-collusion declaration, and specific technical data for the IX system, such as resin breakthrough projections and layout drawings. The contractor must adhere to California prevailing wage laws and Davis-Bacon requirements, providing weekly certified payrolls. Performance and payment bonds totaling 100 percent of the contract price are required. Operational constraints include a prohibition on treatment plant shutdowns between March 1 and November 1, with any approved shutdowns requiring a plan submitted three weeks in advance. Equipment delivery is restricted to within one month of installation unless authorized by the Engineer. Final system acceptance is contingent upon successful performance for a three-week period following installation and final inspection. Payment is based on progress applications that must include up-to-date as-built drawings, certified payroll records, and a schedule of values.
Water and Sewer Line and Related Structures Construction

POSTED

9 days ago

DEADLINE

in 26 days
View Details
NAICS: 238160
SLED
Wash, Repair And Re-Coat The Metal Roof Over The Fire Apparatus Maintenance Facility At The City Of Riverside Corporation Yard
Solicitation # 8263
The City of Riverside is soliciting bids for the washing, repair, and re-coating of the metal roof at the Fire Apparatus Maintenance Facility located at the Corporation Yard. The project scope includes thorough cleaning, demolition, sealing penetrations, and the application of a fluid-applied roofing restoration system using Cool-Sil products. All work must be completed within 60 calendar days from the Notice to Proceed. The project is estimated at 130,000 dollars and includes a 30,000 dollar allowance for unforeseen conditions. Bidders must hold a valid California C-39 Roofing Contractor License and adhere to the 2021 Standard Specifications for Public Works Construction. The contract will be awarded to the lowest responsive and responsible bidder. Submission requirements include electronic bids due by November 4, 2026, and a mandatory 10 percent bid security provided via a notarized City-approved bond or certified check. Awarded contractors must provide performance and payment bonds, maintain on-site supervision, and comply with California Labor Code Section 1720 prevailing wage rates and DIR registration. Quality assurance requires daily inspections by a manufacturer's representative and a final written acceptance from the roofing system manufacturer. Materials must be stored according to strict temperature and environmental guidelines to ensure warranty compliance.
Roofing Contractors

POSTED

14 days ago

DEADLINE

in 6 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS