Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on June 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Town of Fox Creek - Request for Proposal - Pine Road Construction

Closed
AB-2026-03961International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Fisherman’s Terminal (FT) Entry and Exit Paving RedevelopmentThe Fishermen’s Terminal Entry Redevelopment Project will comprehensively reconfigure the entry and exit drives along 19th Ave W, demolish the remaining slab of the Downie Building (C-14), and transform the footprint into a mix of new parking spaces and green areas designed as pollinator habitats, with potential integration of a stormwater treatment facility. Existing pavement in deteriorated condition will be milled and overlaid, while stormwater infrastructure will be entirely replaced and expanded to divert runoff from combined sewer lines to dedicated storm lines, including water quality treatment on qualifying surfaces. A new irrigation system will support the landscaped areas, and landscaping will also be installed in the rebuilt median within the entry drive. Electric vehicle charging stations will be incorporated into the new parking zone. The project will enhance multimodal access by adding a protected two-way bike lane connecting the terminal to the West Wall bike path, improving pedestrian pathways to the intersection of 21st Ave W and W Emerson Pl, and linking directly to the King County Metro bus stop. Lighting will be upgraded throughout the new parking area and pedestrian corridors, and wayfinding signage will be installed to guide cyclists and pedestrians. All improvements are intended to modernize the terminal’s entry experience, support sustainable transportation, and reduce environmental impact through better stormwater management and habitat creation. The project is being managed by the Port of Seattle through its Waterfront Project Management team, with primary contact information publicly available for inquiries and coordination.
Waterfront Project Management

POSTED

about 6 hours ago

DEADLINE

N/A
NAICS: 237310
New
SLED
Asphalt Paving & Striping Portwide Unit Price 2026The contract encompasses a wide range of pavement and infrastructure maintenance activities to be performed across multiple sites within the Seattle-Tacoma International Airport, Maritime Properties, and surrounding areas. Work includes new asphalt paving and patching, overlays with fabric, crack sealing, seal coating, profile grinding, removal and disposal of grinding spoils, stripping and removal of existing pavement markings, surface preparation for new striping, stripe painting, saw cutting and coring of non-hazardous concrete and asphalt, installation of concrete wheel stops, curb repair and replacement, lifting and leveling of concrete sidewalks, and upgrades to road drainage systems, which may require obtaining permits. All tasks are to be executed under a unit price structure, with pricing based on predefined line items for each service. This solicitation, titled Asphalt Paving & Striping Portwide Unit Price 2026, is a forecast under NAICS code 237310 and is managed by the Port of Seattle through its Port Construction Services division. Primary point of contact is Heather Bowden, with Lesley Miles serving as Project Manager, both reachable via official Port of Seattle contact information. The contract does not specify a solicitation number or set-aside type, and performance locations span the Port’s expansive operational footprint without a single designated address. All work must comply with Port standards and procedures, and contractors are expected to coordinate logistics, permitting, and site-specific requirements across distributed locations.
Port Construction Services

POSTED

about 6 hours ago

DEADLINE

N/A
NAICS: 237310
New
International
2026 Territorial Drive Widening - Phase 1 & 2The 2026 Territorial Drive Widening Phase 1 & 2 Project aims to enhance traffic operations, safety, and capacity along a major corridor in the City of North Battleford, Saskatchewan. Phase 1 focuses on widening the intersection of Territorial Drive and the adjacent Service Road to increase turning radii and pavement width, improving maneuverability for all vehicles, particularly large commercial trucks, transit buses, and emergency vehicles, while also including a pavement overlay on the southbound lanes to extend their service life. Phase 2 extends the widening efforts northbound from the Carlton Trail intersection to the Airport Road intersection, adding lane width to improve traffic flow and reduce congestion on this heavily used stretch of roadway. The project is being executed in two distinct phases to ensure systematic improvements across the corridor while minimizing long-term disruption. All qualified contractors are invited to submit bids to perform the work as the Prime Contractor, with proposals due to the City Clerk's Department by August 6, 2026, either by mail or email. Questions regarding the bid documents must be submitted by August 4, 2026. The solicitation is identified by number 20260724 and was posted on July 25, 2026, with the formal closing time set for 8:30 PM on the due date. Bids must be directed to the City Clerk’s Department at 1291-101st Street, PO Box 460, North Battleford, SK S9A 2Y6, or emailed to tenders@cityofnb.ca, with the City Clerk’s Department serving as the primary point of contact for all inquiries.
City of North Battleford

POSTED

about 22 hours ago

DEADLINE

in 12 days
NAICS: 237310
New
SLED
2026 Roadway Improvement Program, Contract No. 11100-012The contract pertains to the 2026 Roadway Improvement Program, Contract No. 11100-012, under the Borough of Newtown in Bucks County, Pennsylvania, and involves comprehensive roadway improvements including full-width mill and overlay of 1,095 square yards and 105 tons of pavement, along with 745 square yards of pavement repair. Additional scope includes replacing two handicap ramps with 60 linear feet of curb and 300 square feet of sidewalk, repairing 30 linear feet of property owner curb, performing 170 square yards of additional pavement repair, placing 25 tons of leveling and scratch course material, replacing two traffic signs, and reinstalling all pavement markings. All work is subject to the Public Works Employment Verification Act and the Pennsylvania Prevailing Wage Act, requiring compliance with wage standards and submission of a completed Employment Verification Form as a condition of bid submission. Bids must include a certified check or bid bond equal to 10% of the total bid amount, along with a fully completed Bid Form, Bidder’s Qualification Statement, executed Anti-Collusion Affidavit, and signed acknowledgement of Borough Ordinance No. 788. Failure to submit any of these documents will result in bid disqualification. The contract will be awarded to the lowest responsible bidder, though the Borough retains the right to reject any or all bids and waive minor irregularities. Upon award, a Performance Bond equal to 100% of the contract price is mandatory. Proposals are due by August 17, 2026, at 2:00 PM, and the project falls under the jurisdiction of the Pennsylvania Department of Transportation’s MS-944 guidelines as outlined in the Contract Documents.
Bucks County

POSTED

1 day ago

DEADLINE

in 23 days
NAICS: 237310
New
SLED
2026 Stormwater BumpoutsSealed bids for Contract No. 2026-02, 2026 Stormwater Bumpouts, will be accepted electronically through PennBID until 11:00 AM on August 18, 2026, for work within the public right-of-way in Narberth Borough, Pennsylvania. The project includes the installation of two stormwater bumpouts, replacement of damaged curb and sidewalk sections, and construction of a new curb ramp, all in accordance with contracted drawings and specifications that reference ASTM, AASHTO, PennDOT Publication 408, and Federal Standards. Bids must be accompanied by a certified check or bid bond equal to at least 10% of the bid amount, and the successful bidder must furnish a performance bond and labor and materials bond each equal to 100% of the contract value, plus a maintenance bond of 25% of the first $200,000 and 10% of any amount exceeding that, with all bonds issued by companies licensed to do business in Pennsylvania. The work must be completed within 50 consecutive calendar days from the issuance of a written notice to proceed, and liquidated damages of $500 per calendar day apply for delays beyond the scheduled completion. All labor must comply with prevailing wage rates as established by the Pennsylvania Department of Labor and Industry, and bidders must submit verified certifications including an anti-collusion affidavit, certification of non-debarment, public works employment verification, and vendor classification forms. Materials must originate from the U.S. and bear permanent markings indicating identifiable steel, with each shipment requiring a Certificate of Compliance (Form CS-4171), unique lot number, and approved material description tied to PennDOT Bulletins. Inspections occur on-site, and acceptance is contingent upon compliance with all contract documents and standards; the Engineer holds full authority to reject nonconforming work even after prior approval. The Owner reserves the right to waive irregularities or reject any bid. No formal FAR clauses are included; instead, the contract relies on numeric local clauses covering provisions required by law, protection of work and property, changes in the work, and use of explosives. Subcontracting or assignment of the contract requires prior written approval, and a competent superintendent must be present on-site continuously during construction. All submissions must be made exclusively through the PennBID portal, with no physical, faxed, or emailed bids accepted.
Montgomery County

POSTED

1 day ago

DEADLINE

in 24 days
NAICS: 237310
New
SLED
161085 Gradall with OperatorThe Virginia Department of Transportation is seeking qualified firms to provide Gradall equipment with trained and proficient operators to support roadway maintenance, repairs, and small construction projects within Loudoun County. These services will be performed across primary, secondary, and residential roadways within the VDOT right-of-way, requiring operators to work closely with VDOT Maintenance personnel to ensure efficient and safe execution of tasks. The solicitation, identified as IFB-124256, was posted on July 24, 2026, with bids due by August 17, 2026, at 3:00 PM. The contract is open to all eligible firms without set-aside restrictions and falls under VDOT’s state and local government procurement framework. Operators must demonstrate proven proficiency with Gradall machinery and the ability to handle diverse maintenance and construction activities in a dynamic roadside environment. All work must comply with VDOT standards and safety protocols, and performance is expected to align with the operational needs of the Virginia Department of Transportation within Loudoun County. Questions and communications regarding the solicitation should be directed to Steven Ferguson, the designated point of contact, via phone at 703-259-2493 or email at steven2.ferguson@vdot.virginia.gov. Detailed information and documentation can be accessed through the provided vendor portal link.
Virginia Department of Transportation

POSTED

1 day ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The Town of Fox Creek is soliciting proposals for the construction of a 365-metre long by eight-metre wide gravel road to provide municipal access to a six-lot industrial subdivision. The scope includes all earthworks, grading, ditching, gravelling, and related tasks necessary to complete the road in accordance with the Contract Documents, though individual lot approaches are excluded and remain the responsibility of property owners. The Town will survey and mark the right-of-way prior to construction, but the successful contractor must verify all field conditions and dimensions independently before starting work, with all work required to be completed by October 15, 2026. Contractors must satisfy themselves regarding site conditions, material availability, and access constraints, as the Town provides no guarantees on material quantity, quality, or suitability—even though an estimated half of the needed clay may be available within the Pine Road right-of-way. All material sourcing, hauling, placement, and compaction are the contractor’s responsibility, and quantities listed in tender documents are approximate only; final measurements will be based on field verification. Contractors may propose alternative materials or construction methods, provided they include detailed technical specifications, intended applications, and cost implications, though acceptance rests solely with the Town. Traffic control measures, including barriers, signage, and flag persons, are the contractor's obligation whenever work obstructs traffic, and any full road closures require one week’s advance notice and explicit approval from the Town. Waste generated from the project must be removed and disposed of at the contractor’s expense, except for approved fill and trimming from the development area, which will be accepted free of charge at the Town Landfill as directed. Participation in a mandatory site visit on May 28, 2026, is required for bid compliance, and alternate dates are at the Town’s discretion. Post-award, the contractor must conduct a final site review with the Town to confirm construction limits, grades, drainage, and access, but unit rates in the bid will remain fixed regardless of any findings from this review or subsequent field verification. Bids are due by June 12, 2026, under solicitation number AB-2026-03961, with Jaden Marshall listed as the contracting authority.

General Info

Construct 365m gravel road for six-lot industrial subdivision, complete by October 15, 2026.

Agency

Government of Canada → Town of Fox CreekView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Alberta, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Town of Fox Creek
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Town of Fox Creek
View Agency Profile
Office AddressN/A
Contacts
Jaden MarshallContracting Authority

Full Description

Show more
3.1 General The Town of Fox Creek is seeking proposals for the construction of a gravel road to service a new industrial subdivision development. The project generally consists of the construction of an approximately three hundred and sixty-five (365) metre long by eight (8) metre wide gravel roadway, including all associated earthworks, grading, ditching, gravelling, and related works required to complete the roadway in accordance with the Contract Documents. The intent of the project is to establish municipal road access to a six (6) lot industrial subdivision. Approaches to individual lots shall be the responsibility of the respective property owners and are not included within the scope of this Contract. The Town will retain a surveyor to establish and mark the road right-of-way and any required control points prior to construction. The successful Contractor shall be responsible for verifying all field conditions and dimensions prior to commencing work. All work is required to be finished before October 15th, 2026. 3.2 Site Conditions and Material Information Proponents shall satisfy themselves as to all site conditions, material availability, access constraints, and any other factors that may affect the execution of the Work. It is estimated, without guarantee, that half of the required clay material may be available within the Pine Road right-of-way for use in roadway construction. The Town makes no representation or warranty regarding the quantity, quality, or suitability of any material located within the project area. The Contractor shall be responsible for independently verifying material quantities and conditions, determining the suitability of available materials, and sourcing, hauling, placing, and compacting any additional material required to complete the Work in accordance with the Contract Documents. All quantities provided within the tender documents are approximate only and are supplied for general reference purposes. Final quantities shall be determined by the Contractor based on field verification and construction requirements. The Contractor may propose alternative materials, products, or construction methods not specifically identified within the Schedule of Quantities or Contract Documents, provided such alternatives are clearly identified within the submission. Any proposed alternative shall include a detailed description of the material or method, intended application, technical specifications, and any associated cost implications. Acceptance of any proposed alternative shall be at the sole discretion of the Town. 3.3 Traffic Control and Site Safety The Contractor shall be responsible for providing traffic control on roads that require restricted access when equipment is blocking lanes of traffic. This includes providing all required barriers, signage, and flag persons when necessary, particularly in higher traffic areas. Any complete road closures shall require one (1) weeks’ notice to the Town of Fox Creek so that a Road Closure notice can be issued and emergency services can be notified. No road closures shall proceed without approval from the Town. 3.4 Waste Removal and Disposal The Town will accept fill/trimming from the development area without charge. The fill/trimmings shall be hauled and stockpiled at the Town of Fox Creek Land Fill, as directed by the Town. The Contractor shall be solely responsible for the removal, transport, and disposal of all other waste materials generated as a result of the work. All costs associated with the handling, hauling, and disposal of such materials shall be included in the unit rates submitted in Appendix B – Schedule of Quantities and Prices. 3.5 Site Examination and Scope Confirmation A mandatory site visit will be held on May 28, 2026, at 10:00am MDT. Failure to attend the mandatory site visit shall result in the submission being deemed non-compliant. Proponents may request an alternate site visit date; however, the Town reserves the right, at its sole discretion, to decline such requests. Following award of the contract, the successful bidder shall attend the project area, either personally or through an authorized representative, to review the locations and finalize the scope of work with the Town. The proponent shall examine the project site and satisfy themselves as to all existing site conditions prior to commencing work. This review is intended to confirm the limits of construction, existing grades, material conditions, drainage requirements, access constraints, and any other factors that may affect the Work. Unit rates submitted within the Contractor’s bid shall remain fixed and shall not be subject to adjustment as a result of the site examination, field verification, or confirmation of quantities and construction limits. The purpose of the site review is to confirm construction requirements, quantities, and work locations only.