Trade Package - Cargo Building 626.1 - TP 0035 - SFO Cargo 626 Material Handling System Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Clark Construction is managing the development of a core-and-shell two-story cargo building at the airport, which includes warehouse space, 28 active truck docks, 7 future docks, and leasable office space. The project involves the demolition of building 624 and the relocation of existing infrastructure to accommodate the new facility, which features a facade of insulated metal panels, glass, and polycarbonate. Trade Package TP-0035 specifically covers the mechanical installation of the Material Handling System. Bids for this scope of work are due by 2:00 PM on September 18, 2026, with a required LBE participation rate of 5%. Inquiries regarding this package should be directed to Nicolette Madonna at Clark Construction.
General Info
Agency
NAICS
Place of Performance
CA, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from California → Design-Builder
Same awarding agency
