This Solicitation opportunity from California was posted on May 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Trade Package - SFO Boarding Area F Refresh Project - TP 01 - Core Trade Design Build - Passenger Boarding Bridges
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Hensel Phelps Construction Co. is leading the design-build effort for the Boarding Area F Refresh at San Francisco International Airport, which involves reconfiguring approximately seven gates in Terminal 3 to support both narrow-body and wide-body aircraft. This includes replacing outdated Passenger Boarding Bridges (PBBs) along with upgrades to the related aircraft and gate systems. The work will be conducted in multiple phases to minimize disruption to airport operations, generally limiting interference to no more than two gates simultaneously. Coordination for alternative gate and bus operations may be required as directed by the airport. Additional scope, depending on funding, could encompass interior renovations, improved operational features, enhanced concessions, and baggage handling system upgrades, with final project elements to be determined during the programming phase. The current solicitation seeks a design-build Core Trade partner specializing in Passenger Boarding Bridges to engage early in the design process, facilitating timely procurement and project delivery in collaboration with airport authorities, architects, vendors, and other trade partners. The trade package's bid deadline is June 17, 2026, with cost estimates yet to be determined. There is no local business enterprise participation requirement for this package. Key contacts include Qais Lodin, Senior Estimator at Hensel Phelps, for package details, and Tiffany Gonzalez-Ruiz, Procurement Officer I for the overall project. The early involvement of the selected design-build PBB partner aims to ensure the successful activation of gates on schedule while maintaining airport operational continuity.
General Info
Agency
NAICS
Place of Performance
CA, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Submission Closed
