Trade Package - SFO Recycled Water System Project - TP 4010 - HVAC

Closed
11431.66 - TP-4010State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333924
New
DIBBS
BINDER, LOAD
Solicitation # SPE8EF-27-T-0188
Solicitation SPE8EF-27-T-0188 is a request for quotations issued by DLA Troop Support, Construction and Equipment Manufacturing and Construction for the procurement of 61 units of Load Binders, identified by NSN 3990-01-554-6200 and Columbus McKinnon Corporation part number D060164. The requirement is designated as a total small business set-aside under FAR 19.5, with a response deadline of November 9, 2026. Delivery is required within 167 days after order, with a need ship date of April 26, 2027, and a final required delivery date of September 13, 2027. The items are to be delivered FOB Origin to DLA Distribution Red River in Texarkana, Texas, where both inspection and acceptance will take place. The contract mandates strict adherence to packaging and marking standards, requiring compliance with MIL-STD-129 and ASTM D3951, though DLA Master List technical and quality requirements take precedence. Palletization must follow RP001 guidelines. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and payment. Key regulatory clauses are incorporated, including DFARS 252.204-7012 for safeguarding covered defense information and various prohibitions regarding hazardous materials and covered telecommunications equipment. Offerors must maintain current certifications in the System for Award Management and provide safety data sheets where applicable to be considered responsible for award.
CONSTRUCTION & EQUIPMENT MANU & CON

POSTED

about 6 hours ago

DEADLINE

in 12 days
NAICS: 333924
New
SLED
New Warehouse Forklift
Solicitation # 2027-IFB-035
Wicomico County, Maryland, is soliciting sealed bids under solicitation number 2027-IFB-035 for the procurement and delivery of one new, current-production, sit-down, counterbalanced forklift truck. The equipment must be suitable for both indoor and outdoor industrial material handling, featuring a minimum rated capacity of 5,000 lbs, LPG fuel, and solid tires. Technical requirements specify a maximum overall height of 85 inches and a maximum fork height of 185 inches. The unit must be delivered fully assembled, operational, and compliant with all applicable federal, state, local, and OSHA standards by the requested delivery date of December 1, 2026. The County may also consider an add-alternate for forklift operator training. Bids must be submitted electronically via the OpenGov portal by November 4, 2026, at 2:30 p.m. To be considered responsive and responsible, vendors must provide a Maryland Certificate of Status, an executed Affidavit of Qualification to Bid, three references from the last 12 to 36 months, and detailed warranty information. Award will be granted to the lowest responsive and responsible vendor who is current on County personal property taxes. The successful contractor must adhere to Wicomico County Standard Terms and Conditions, which include comprehensive insurance requirements for general liability, professional liability, automobile, and workers compensation. Payment will be issued within 30 calendar days following the receipt of a proper invoice for accepted equipment.
Corrections

POSTED

about 7 hours ago

DEADLINE

in 7 days
NAICS: 333924
New
Federal
Vacuum Lift Assist
Solicitation # W911S227U0082
Solicitation W911S227U0082 is a Request for Quotation issued by the Department of Defense, specifically the W6QM Micc-Ft Drum, for the procurement of one new Vacuum Lift Assist unit. The government is seeking a SmartLift US, Inc. model SL 409 HLE RT or an equal product that meets specific technical requirements, including a minimum standard lifting capacity of 950 lbs and a minimum extended boom lifting capacity of 220 lbs. This is a Total Small Business Set-Aside under NAICS code 333924. The contract requires the delivery of new equipment only, prohibiting used or remanufactured products, and must include all relevant schematics, user manuals, maintenance manuals, and a minimum one-year parts and labor warranty. The award will be granted to the responsible offeror whose proposal is most advantageous based on price and technical factors. Delivery is required F.O.B. destination to RIA-JMTC 61299, with a preferred delivery timeframe of 30 days. All quotes must be submitted via the PIEE solicitation module by the specified deadline. Offerors are required to provide a completed certification of the country of origin to avoid being rejected as nonresponsive. The procurement is subject to various Federal Acquisition Regulation and Defense Federal Acquisition Regulation Supplement clauses, including Buy American requirements and cybersecurity standards for safeguarding covered defense information.
W6QM Micc-Ft Drum

POSTED

about 11 hours ago

DEADLINE

in 5 days

AI Contract Overview

Show more

The contract involves Walsh Construction Co. II, LLC serving as the design-builder for the Recycled Water Systems Project at San Francisco International Airport. The project entails designing and constructing an Advanced Water Treatment Plant (AWTP) that complies with Title 22 standards and effectively removes PFAS from effluent. Additionally, it includes the installation of a 250,000-gallon storage tank, a pump station, and approximately three miles of pipeline to connect the new system with existing airport facilities. Upgrades to three existing Sequence Batch Reactors (SBR) and the construction of a new SBR are also part of the scope, all situated within the Mel Leong Treatment Plant, which manages wastewater from various airport sources. This is a progressive design-build effort, with trade work authorized incrementally, aiming to complete design, construction, permitting, activation, commissioning, and project closeout. One specific trade package, TP-4010, focuses on HVAC installation across multiple buildings, including process, control, electrical, and blower buildings. The scope covers installing various HVAC equipment such as exhaust fans, heat pumps, air-cooled condensing units, ductwork, dampers, and control systems, ensuring the systems meet specified standards for noise, indoor air quality, and seismic requirements. The bid deadline for this package is July 23, 2025, with only pre-qualified bidders eligible to submit proposals. The project emphasizes strict adherence to technical specifications, quality control, and coordination among trades, with Walsh providing bid documents to pre-qualified subcontractors upon request. The overall contract size ranges from approximately 50 to 150 million dollars, with the primary point of contact being Tiffany Gonzalez-Ruiz.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → SFO Construction
Contacts1 person available
OfficeN/A
Organization / AgencyCalifornia → SFO Construction
Office AddressN/A
Contacts

Full Description

Show more
Design-Builder Firm Name: Walsh Construction Co. II, LLC.Project Overview:The Recycled Water Systems Project will design and construct an Advanced Water Treatment Plant (AWTP) to meet Title 22 requirements for recycled water and remove per-and polyfluoroalkyl substances (PFAS) from the effluent. The project will also design and construct a 250,000-gallon storage tank, pump station, and distribution system of roughly three miles of pipeline and connections to some of the Airport's facilities. The project will also include upgrades to three existing Sequence Batch Reactors (SBR) and the construction of one new SBR for permit compliance.This is a Progressive Design-Build Project where Trade Work is incrementally authorized by Airport. The goal of this project is to design, construct, permit, activate, commission, and closeout of the new construction for the Recycled Water System Project.The new AWTP and SBR upgrade will exist in the current Mel Leong Treatment Plant (MLTP). The MLTP includes parallel treatment processes for wastewater produced from Airport facilities. The Industrial Wastewater Treatment Plant (IWTP) treats industrial wastewater and first-flush storm water runoff; and the Sanitary Wastewater Treatment Plant (SWTP) treats sanitary sewer flows.Trade Package No.: TP-4010Trade Package Title: HVACDescription of the Trade Package Scope of Work:1.1 SCOPE OF WORKThis scope of work focuses on the installation of HVAC at the Process Building (Building 914), Control and Electrical Building (Building 912), and Blower Building.BASE SCOPEInstallationInstall all HVAC equipment including but not limited to:Roof mounted exhaust fanCondensate PumpOutdoor air-cooled heat pump with prefabricated roof equipment supports and neoprene vibration isolatorsAir cooled condensing unit on prefabricated roof equipment supports and neoprene vibration isolatorsPower roof exhaust fanGravity outside air intake ventilatorRecessed supply diffusers in the control roomInstall Gravity Relief Ventilator on roof of Process Building and Electrical BuildingInstall Gravity Intake Ventilator on Control Room and Process Building roofFan Coil UnitProvide and install temperature sensors and control panelsGravity Relief Ventilator with backdraft damperLouvers at Blower Building (L1, L2, L3, L4)Blower inlet duct at Blower Building 4 EA Roof curbs:Internally reinforced roof-curb units capable of supporting superimposed live and dead loads, including equipment loads and other construction indicated on drawings.See Specification 07 72 00 for curbs or submit alternative products for the Engineers' approvalProvide and install roof curb assemblySteel support members or manufactured curbsHVAC controls and appurtenances for a fully functional HVAC systemProvide seismic calculations per spec section 23 05 48 Refrigerant PipingSee specification 23 23 00 for products, accessories, and pipe support.Run refrigeration liquid and refrigerant suction piping up through roof as indicated on drawings. Subcontractor to provide routing in shop drawings. See note 13 on sheet M5.40.01 Installation of return air opening with heavy gauge wire mesh screen.See specification 23 21 00 for ductwork, accessories, and sheet metal for ducts Air Conditioning unitSee Specification 23 81 00 for Split System Air Conditioning Units RTUSee Specification 23 81 19 for RTUs and components All HVAC ducting to be installed per specification section 23 21 00 and mechanical drawing notesIncludes duct support on roof Install motorized Back Draft Dampers and Back Draft DampersSee specification 23 21 00 for dampers.Subcontractor to coordinate with electrical contractor for location of backdraft dampers and smoke detector Insulation as required per specification See Specification 23 34 00 for Supply Fan requirements. See Specification 23 31 00 for air outlets and inletsSee drawing M0.40.02 for schedule Building management systemMount occupancy sensorCoordinate with electrical subcontractor for occupancy sensor's location QC/InspectionsStart up and Commissioning per SFO Standards including training listed in specification section 01 91 00 and 01 91 13.All equipment and accessories to be the product of a manufacturer regularly engaged in its manufacture.See Specification 23 05 93 for testing, adjusting, and balancing requirements.The Mechanical Contractor shall cooperate with regard to sound tests (ARI 575, ANSI S1.13) which may be conducted by the Owner or his representative to ensure that noise criteria are met.RTUSee Specification 23 81 19 for RTUs and componentsPersonnel performing testing and balancing shall be fully qualified, experienced, and normally engaged in this type of work. Comply with the requirements specified in section 23 05 93 Testing, Adjusting and Balancing.HVAC subcontractor to comply with Construction Indoor Air Quality Management PlanTrade Package Bid Due Date and Time: 7/23/2025 @ 2 PMMain Trades of the Trade Package: HVACSBE participation Requirement %: 1.7%Design-Builder requirements or prequalification criteria: Only pre-qualified bidders will be allowed to submit bids. If you did not previously pre-qualify during the pre-qualification timeframe, you will not be able to bid on this project.Contact for Trade Package information: Dominic C Fung, contact@example.gov web link to the Trade Package or more information: Please contact the email above if you were previously pre-qualified with Walsh and are interested in bidding for this trade package. Walsh will share the bid documents to pre-qualified subcontractors via email and/or BuildingConnected upon request.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS