This Solicitation opportunity from California was posted on April 30, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Trade Package - SFO Recycled Water System Project - TP 4022 -Windows (Pre-Qualification Only)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Walsh Construction Co. II, LLC has been contracted to design and build the Recycled Water Systems Project at the airport, which involves creating an Advanced Water Treatment Plant (AWTP) capable of meeting Title 22 standards and removing PFAS contaminants from effluent. The project also includes constructing a 250,000-gallon storage tank, a pump station, and approximately three miles of pipeline to connect these systems to airport facilities. Additionally, upgrades will be made to three existing Sequence Batch Reactors (SBRs), along with the construction of a new SBR to ensure permit compliance. This is a progressive design-build effort, meaning trade work will be authorized incrementally, with the goal of completing design, construction, permitting, activation, commissioning, and project closeout within the scope of the new recycled water system. The AWTP and SBR upgrades will be situated within the existing Mel Leong Treatment Plant, which manages wastewater from airport facilities, including industrial, stormwater, and sanitary flows. A specific trade package, TP-4022, focuses on the provision and installation of windows and related hardware for process and control buildings, including vestibule glass walls and storefront windows, with work primarily performed by carpenters. Pre-qualification is required for firms wishing to bid on this package, with submissions due by May 30, 2025. Walsh is seeking firms that meet pre-qualification criteria to participate, and interested vendors should contact the designated project team for access to the pre-qualification process. The project is valued between 50 and 150 million dollars, with the primary point of contact being Tiffany Gonzalez-Ruiz at SFO Construction.
General Info
Place of Performance
CA, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
