Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Illinois was posted on August 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Traffic Control and Protection Implementation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Traffic Control and Protection Implementation subcontract involves the deployment of temporary traffic control measures to ensure safety during construction phases. The scope of work specifically includes the provision and management of signage, cones, barriers, and flagging services. This project is managed by the Engineering agency within the state of Illinois and is categorized under NAICS code 561320. The solicitation was posted on August 4, 2026, with a response deadline set for August 26, 2026, at 4:00 PM. Interested parties can find further details and submission guidelines through the provided procurement portal link.

General Info

Illinois traffic control subcontract for signage and flagging; responses due August 26, 2026.

Place of Performance

IL, USA

Set-Aside

NONE

Documents

This scope was carved out of 26-071.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Montgomery Road Multi-Use Path Phase III – Construction Engineering Services

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIllinois → Engineering
ContactsNo contacts available
OfficeN/A
Organization / AgencyIllinois → Engineering
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Implementation of temporary traffic control including signage, cones, barriers, and flagging during construction phases.

More opportunities from Illinois → Engineering

Same awarding agency

NAICS: 237110
New
SLED
Lead Service Replacement - Street Resurfacing Blocks
Solicitation # 26-118
The City of Aurora, Illinois, has issued solicitation number 26-118 for the full replacement of lead water service lines from the water main to the water meter. This project is designed to be executed on a block-by-block basis, specifically coordinating replacements with the city's planned roadway resurfacing activities. The scope of work includes the removal and plugging of abandoned services, installation of new lines, and comprehensive surface restoration. Contractors must adhere to strict compaction standards, with sub-grade and backfill reaching 95 percent maximum density for pavements and 85 to 90 percent for unpaved areas. The project requires the use of GPS shots to record the locations of removed services and installed plugs. The contract will be awarded to the lowest responsive and responsible bidder, with an emphasis on price, capacity, and qualifications. Bidders must submit their proposals electronically via the OpenGov portal by November 18, 2026. Required submission documents include a bid guarantee of at least 5 percent of the total bid, a compliant Certificate of Insurance, an IDOT Prequalification Form, and evidence of participation in registered apprenticeship and training programs for contracts exceeding 25,000 dollars. The successful contractor must provide a performance and payment bond for 100 percent of the contract sum and maintain a one-year performance guarantee after final payment. The project must reach substantial and final completion within 365 calendar days. Notably, underground utility installation is generally prohibited between October 31 and April 1, unless directed by the Engineer, and any restoration for utilities installed before October 31 must be completed by November 15 of the same year. The contract is subject to the Illinois Non-Appropriation Clause, allowing the city to cancel the service with a 30-day notice if funds are not approved. Contractors are also required to comply with Illinois prevailing wage laws, ADA accessibility requirements for sidewalks, and the Illinois Toxic Substances Disclosure to Employees Act by providing necessary Safety Data Sheets.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 11 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS