Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Traffic Control & Site Safety

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Traffic Control and Site Safety involves providing essential traffic control devices and managing lane and sidewalk closures for prime contractors working on City of Aurora municipal projects. The scope of work includes the implementation of urban multilane, half-road, and crosswalk closures in strict accordance with Spec 70 18 01 - 06. The selected provider will be responsible for supplying all necessary barricades, warning lights, and cones to ensure safe and compliant work zones and traffic diversions. Managed under the Engineering agency, the contract requires close coordination with the District One Bureau of Traffic to maintain public safety and regulatory compliance. Interested parties must submit their responses by the deadline of December 2, 2026. The project falls under NAICS code 238990, focusing on specialized site safety and traffic management services within the municipal infrastructure framework.

General Info

Traffic control and site safety subcontract for City of Aurora projects due 12/2/2026.

Place of Performance

IL, USA

Set-Aside

NONE

Documents

This scope was carved out of 26-120.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Downtown Two-Way Conversion and Broadway Improvements

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 16 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 3 documents on the prime contractFrom Downtown Two-Way Conversion and Broadway Improvements
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIllinois → Engineering
ContactsNo contacts available
OfficeN/A
Organization / AgencyIllinois → Engineering
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Provides traffic control devices and manages lane/sidewalk closures for prime contractors on City of Aurora municipal projects. Implements urban multilane and half-road closures and sidewalk/crosswalk closures per Spec 70 18 01 - 06. Supplies barricades, warning lights, and cones. Coordinates with District One Bureau of Traffic. Delivers safe, compliant work zone and traffic diversion.

Similar Contracts

Same NAICS industry code

More opportunities from Illinois → Engineering

Same awarding agency

NAICS: 237310
SLED
Downtown Two-Way Conversion and Broadway Improvements
Solicitation # 26-120
The City of Aurora, IL, is soliciting bids for the Downtown Two-Way Conversion and Broadway Improvements project, a major infrastructure initiative located in Kane County. The scope of work covers 1.69 miles of improvements, primarily focusing on converting New York Street and Galena Boulevard from one-way couplets to two-way operations and reducing through lanes on Broadway (IL 25) south of Galena Blvd. Key deliverables include roadway resurfacing, HMA paving, sidewalk reconstruction with decorative elements, traffic signal modifications, signing, striping, and landscaping. The project must adhere to the State of Illinois Standard Specifications for Road and Bridge Construction, District One Standard Traffic Signal Design Details, and 2012 ADA Standards for Accessibility. The contract will be awarded to the lowest responsive and responsible bidder, with evaluations based on performance history, resource adequacy, and the ability to meet timeframes. Bidders must submit via the OpenGov portal by December 2, 2026, and provide a bid guarantee of at least 5% of the total bid. Successful contractors must provide performance and payment bonds for 100% of the contract sum and comply with prevailing wage laws, Business Enterprise Program (BEP) utilization requirements, and apprenticeship goals of 10% for projects over $500,000. Notably, the contract includes an Illinois Non-Appropriation Clause, allowing for cancellation without penalty if funds are not approved, and requires a city-generated Purchase Order before any work begins or payments are issued.
Highway, Street, and Bridge Construction

POSTED

8 days ago

DEADLINE

in 15 days
View Details
NAICS: 237110
SLED
Lead Service Replacement - Street Resurfacing Blocks
Solicitation # 26-118
The City of Aurora, Illinois, is soliciting bids for the full replacement of lead water service lines from the water main to the water meter. This project, identified as solicitation 26-118, will be executed on a block-by-block basis and coordinated with the city's planned roadway resurfacing activities. The scope of work includes the installation of copper piping, trenchless installation, and comprehensive site restoration, including the replacement of roadway pavement with hot mix asphalt, residential and commercial driveway approaches, and PCC curb, gutter, and sidewalks. All work must adhere to IDOT specifications, the Illinois Plumbing Code, and City of Aurora engineering standards. The contract is expected to begin in March 2027, with a total performance period of 365 calendar days for both substantial and final completion. Bids are due by November 18, 2026, via the OpenGov portal and will be awarded to the lowest responsive and responsible bidder based on price, qualifications, and prior performance. The successful contractor must provide a bid guarantee of at least five percent of the total bid, as well as performance and payment bonds for one hundred percent of the contract sum. Compliance with the Illinois Local Government Prompt Payment Act, prevailing wage requirements, and various state and federal safety and labor laws is mandatory.
Water and Sewer Line and Related Structures Construction

POSTED

8 days ago

DEADLINE

in 1 day
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS