Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from California was posted on May 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Traffic Engineering and Safety Analysis

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS Units 1 and 2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing professional and technical services such as civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as utility locating, geotechnical and geophysical investigations, BIM/3D modeling, and environmental assessments. Additional requirements include hazardous materials surveys, permitting support, and CPM scheduling. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a bid date of September 11, 2026, and a response deadline of September 30, 2026. Eligible bidders include Disadvantaged, Minority, Women, and Other Business Enterprises, provided they hold certifications from recognized agencies such as the SBA or MBDA. Responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, though Kiewit will reimburse the associated bond premiums. Furthermore, Kiewit, as a signatory to various collective bargaining agreements, requires bidders to demonstrate an ability to maintain labor harmony on the project. For further information or to review plans and specifications, interested parties should contact Lead Estimator Joe Bockelman.
Kiewit Infrastructure West Co.

POSTED

about 13 hours ago

DEADLINE

in 17 days
NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to address sewer system deficiencies in southwest Bend by extending a gravity trunk sewer line to unsewered areas, decommissioning existing pump stations in the Romaine Village area, and installing service laterals to transition properties from private septic systems to public sewer. The scope may also include roadway reconstruction, ADA curb ramp and curb design, and minor transportation improvements such as turn lanes or mini roundabouts. The project is funded by the Clean Water State Revolving Fund administered through the Oregon Department of Environmental Quality, with a total design and construction budget of 3,875,000 dollars. The procurement process is managed by the City of Bend, with a proposal deadline of September 29, 2026. Selection is based on technical and administrative capabilities, with the potential for interviews to influence final scoring. Key deliverables include a preliminary engineering report, a public outreach plan, and construction contract documents at 30, 60, 90, and 100 percent completion, culminating in record drawings. The City intends to advertise for construction services in Fall or Winter 2027. Parametrix is actively soliciting firms with recognized federal, tribal, state, local, or independent DBE certifications as part of a good faith effort to include small, minority-owned, women-owned, and veteran-owned businesses.
Parametrix

POSTED

about 13 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The contract involves providing specialized traffic engineering services, including conducting traffic studies, optimizing signal timing, performing safety audits, and developing traffic control plans that adhere to the Manual on Uniform Traffic Control Devices (MUTCD) and Caltrans standards. These services aim to enhance traffic flow, improve safety, and ensure compliance with established regulatory guidelines. The work falls under the NAICS code 541330 and is managed by the Public Works / Roads division in California. Proposals for this subcontract opportunity are due by June 18, 2026, with the solicitation posted on May 20, 2026. While specific details about the award process, set-asides, or exact locations for performance are not provided, the contract is intended to support traffic engineering and safety analysis efforts within the state. Interested parties can find additional information through the provided procurement portal link.

General Info

Provide traffic engineering services including studies, signal timing, safety audits, and control plans.

Agency

California → Public Works / RoadsView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of BRLO- 5936(112).

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Request for Proposals for Professional Civil Engineering and Environmental Services for the Larkspur Street over San Lorenzo River Bridge Replacement Project

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works / Roads
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Public Works / Roads
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Conduct traffic studies, signal timing, safety audits, and develop traffic control plans compliant with MUTCD and Caltrans standards.

More opportunities from California → Public Works / Roads

Same awarding agency

NAICS: 541620
New
SLED
RFP for FHWA ER Programmed Storm Damage Repair Projects - Environmental Consulting Services
Solicitation # 2026-RFP - Roads-079
The County of Santa Cruz Department of Community Development and Infrastructure is soliciting proposals from qualified environmental consulting firms to provide professional services for twenty-three storm-damage road repair projects. Funded through the Federal Highway Administration's Emergency Relief Program, the scope of work includes preparing batched Biological Assessments for Section 7 consultation with the USFWS and NMFS, conducting field surveys, GIS mapping, and ensuring compliance with NEPA, CEQA, and Section 106 of the National Historic Preservation Act. The consultant will also be responsible for preparing and submitting regulatory permit materials for agencies including the USACE, RWQCB, and CDFW. The contract term is expected to run from the date of approval through December 31, 2028. Proposals must be submitted via the OpenGov Procurement portal by October 8, 2026, consisting of a technical proposal in PDF format and a separate password-protected cost proposal. The selection process utilizes a weighted scoring system focusing heavily on project approach, relevant experience, and staff qualifications. The resulting agreement will be a cost-plus-fixed fee contract with a not-to-exceed amount, requiring adherence to Caltrans Local Assistance Procedures Manual standards and FAR 48 CFR Part 31 cost principles. Selected consultants must provide evidence of insurance and comply with federal and state non-discrimination and lobbying disclosure requirements.
Environmental Consulting Services

POSTED

2 days ago

DEADLINE

in 26 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS